Tender For Master Sewerage Scheme Faridabad:-Designing, Construction And Commissioning Of 20 Mld Capacity Stp On Sbr Technology With Tertiary Treatment (To Achieve The Required Parameters), Elevated Equilization Tank Etc With 03 Months Trial Run, 11
Tender Overview
Project Description
Tender for Master Sewerage Scheme Faridabad:-Designing, Construction And Commissioning Of 20 Mld Capacity Stp On Sbr Technology With Tertiary Treatment (To Achieve The Required Parameters), Elevated Equilization Tank Etc With 03 Months Trial Run, 11 Years Of Operation And Maintenance With 6 Years Defect Liability Period At Surajkund In Badshahpur Zone, Faridabad And All Other Works Contingent Thereto On Epc Mode (With 70% Capital Cost And 30% O And M Cost).
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Jul-2026 | Corrigendum | Technical Bid | 21-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Design and Construction of 20 MLD Capacity STP based on activated sludge process SBR technology including elevated inlet chamber, mechanical screen, fine bar screen, grit chamber, distribution chamber, SBR with tertiary treatment, UV system, gravity sludge thickener, turbo blowers, sludge sump and pump house, polymer dosing tanks, centrifuge platform, centrifuge feed pumping station, supernatant and concentrate collection sump, blower room, odour control system, Electric Sub-station room, LT/HT panel room, Staff Quarter, Admin Building, re-use pumping with sump well, providing and laying 600mm dia DIK-9 Pipeline (6000 mtr), PLC and SCADA control, CCTV (20 No), OMDs, boundary wall, landscaping, horticulture as per CPHEEO norms to meet CPCB/NGT standards/latest guidelines to the satisfaction of Engineer-in-charge as per DNIT and all other works contingent thereto. |
| 2 | Operation and Maintenance- Operation and maintenance cost for STP, all other works created under the contract for 11 years as well as for defect liability period of 6 years which includes basic service charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, water and all other matters and items of what so ever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, and all other Consumables as per Scope of Work and terms and conditions of DNIT as required for OandM. The agency should quote the rates inclusive of all consumables. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 9 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender