| 1 | Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. |
| 2 | Demolishing mud phaska in terracing and disposal of material within 50 meters lead. |
| 3 | Providing and laying integral cement based water proofing treatment including preparation of surfaces as required for treatment of roofs, balconies, terraces etc consisting of following operations.a) Applying a slurry coat of neat cement using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoining walls upto 300mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineerin-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of Junctions of walls and slabs) c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick joint less cement mortar of mix 1:4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm/sq 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineerin-charge. With average thickness of 120mm and minimum thickness at khurra as 65 mm. |
| 4 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design in 75x75 mm deep chase. |
| 5 | Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof. |
| 6 | Providing and laying APP (Atactic Poly Propylene Polymer ) modified prefabricated five layer water proofing membrane, black finishing reinforced with glass fibre mat consisting of a coat of bitumen primer for bitumen membrane @ 0.40 ltr/sq. mt. by the same membrane manufacture of density at 25°C, 0.87- 0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under: Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorized applicator of the manufacture of membrane. 3 mm thick water proofing membrane with non-woven polyester matt: Joint strength in longitudinal and transverse direction at 23°C as 650/450 N/ 5cm. Tear strength in longitudinal and transverse direction as 300/250N. |
| 7 | Extra for covering top of membrane with Geo textile, 120gmsnon woven, 100% polyester of thickness 1 to 1.25mm bonded to the membrane with intermittent touch by heating the membrane by Butane Torch as per manufactures recommendation. |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. |
| 9 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes 110 mm diametre. |
| 10 | Providing and fixing on wall face un-plasticized - PVC moulded fittings/accessories for un plasticized Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. Coupler 110 mm. |
| 11 | Cutting holes up to 30x30 cm in walls including making good the same. With common burnt clay (non modular) bricks. |
| 12 | Engaging Plumber as per requirement at site. |
| 13 | Engaging Helper as per requirement at site. |
| 14 | Engaging labour as per requirement at site. |
| 15 | Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diametre and weighing not less than 440 grams. |
| 16 | Providing and fixing un-plasticised -PVC pipe clips of approved design to un-plasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. 110 mm. |
| 17 | Engaging tractor with trolley for disposal of mulba, unhygenic material away from site as per direction of Engineer-in-charge. |
| 18 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 19 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 20 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. |
| 21 | Stone agg. / Sand for an avg. lead of 20 Kms. Please Enable Macros to View BoQ information |