|
| 1 | Electrical work as per Sheet 1 BOQ Estimate for the Work \\"Electrification of Gram Panchayats under the Bharat Net Phase 3 Project under UT Capex 2026-27\\" pertaining to SD Shopian in respect of ED Shopian S.No Particular of Material Unit Rate Village Wise Qty and Amount Amount Total Qty. Amount Pudsoo Amount HP Batgund Amount Matribugh Amount Sedow A Amount Sedow B Amount Nowgam Amount Chotipora Amount Kaprin (BDO office) |
| 2 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 8 Mtr. Long Pole (ST-410 SP15) with base plate and cap as per REC Standard |
| 3 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum / pole , muffing 20 cm above ground level ,including plaster and curing of concrete for ( 8 Mtr ST Pole) |
| 4 | Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 50 mm² ACSR Conductor (Rabbit) along with fitting complete |
| 5 | Supply, installation, Testing and Commissioning of 10 MM Sq. / 16 MM Sq. Cable (2 C / 4C ), 1.1 KV Grade Armoured XLPE Insulated Stranded Conductor FRLS as per Rec. standard |
| 6 | Providing and Fixing of LT Shackle with Muki Clamps (50*6mm) completeas per REC Standard and approved drawings |
| 7 | Providing and Fixing of Galvanized Nuts and Bolts |
| 8 | Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) |
| 9 | Supply,Fixing of Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm |
| 10 | Supply and erection of Danger Plate with clamps (writing in English and Regional Language ) |
| 11 | Supply and fixing of anti-climbing Device with Clamps |
| 12 | Sign Board Mentioning Name of Village ,Name of Work/scheme, Year of Implementing ,Implementing Agency PDD KPDCL Div Shopian & Name of Contractor |
| 13 | Geo Tagged Photographs of high resolution (Pre and Post Photographs) Both hard and soft copy (for e-compendium) Photographs Per site Total 118792.8 91207.1 36035.7 36035.7 63621.4 36035.7 173964.2 36035.7 591728.3 5.917283 Technical Officer Executive Engineer, ED Shopian Please Enable Macros to View BoQ information |