| 1 | Carriage of Material GI Pipe from Divisional Store to site of work average 290 km by mechanical transport and from road side to site of work avg 5 km by Head Load |
| 2 | Carriage of Material hdpe Pipe from Divisional Store to site of work average 290 km by mechanical transport and from road side to site of work avg 5 km by Head Load |
| 3 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 15 mm dia |
| 4 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 20 mm dia |
| 5 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 25 mm dia |
| 6 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 32 mm dia |
| 7 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 40 mm dia |
| 8 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 63mm dia specification IS4984:2016 PN 16 PE 100 |
| 9 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 50mm dia specification IS4984:2016 PN 16 PE 100 |
| 10 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 40mm dia specification IS4984:2016 PN 16 PE 100 |
| 11 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 32mm dia specification IS4984:2016 PN 16 PE 100 |
| 12 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 25mm dia specification IS4984:2016 PN 16 PE 100 |
| 13 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil 1 mtr form cutting edge |
| 14 | Macking connection of G.I Distribution branch with G.I Main of FollowingSizes by Providing & Fixing tee including cutting & threading the pipe etc Complete. 25mm to 40 mm dia Nominal Bore |
| 15 | Macking connection of G.I Distribution branch with G.I Main of FollowingSizes by Providing & Fixing tee including cutting & threading the pipe etc Complete. 50mm to 80 mm dia Nominal Bore |
| 16 | P/F gun matel gate valve with CI wheel of approved quality as per BIS Specfications ( Screwed end) 50mm dia nominal bore |
| 17 | P/F gun matel gate valve with CI wheel of approved quality as per BIS Specfications ( Screwed end) 40mm dia nominal bore |
| 18 | P/F gun matel gate valve with CI wheel of approved quality as per BIS Specfications ( Screwed end) 32mm dia nominal bore |
| 19 | P/F gun matel gate valve with CI wheel of approved quality as per BIS Specfications ( Screwed end) 25mm dia nominal bore |
| 20 | P/F gun matel gate valve with CI wheel of approved quality as per BIS Specfications ( Screwed end) 20mm dia nominal bore |
| 21 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 65 mm dia |
| 22 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 50mm dia |
| 23 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 40mm dia |
| 24 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 32mm dia |
| 25 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 25mm dia |
| 26 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 20mm dia |
| 27 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 15 mm dia |
| 28 | Refilling excavated soil back into trench |
| 29 | Providing and fixing of Brass Bibcock of approved Quality |
| 30 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil 1 mtr form cutting edge 80% All kind of Soil & 20 % for Ordinary Rock |
| 31 | Dry Random Rubble Masonary without Bondstone |
| 32 | Providing and fixing of C.I Double acting Air valve of approved Quality 50 mm dia |
| 33 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 34 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 35 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Pliier & Ancor Blocks |
| 36 | Providing 12 mm dia steel rope incl carriage upto site of work |
| 37 | Centering and shuttering including strutting, propping etc and removal of form work for foundation, footings, base for columns . |
| 38 | chain pully on hire charges including fastening wire and providing operator |
| 39 | Carriage of sand and bajree from nearby source to road site of work an Avg. distance 20 km by M.T |
| 40 | Carriage of sand and bajree above 40 mm from nearby source to road site of work an Avg. distance 30km by M.T and 1Km by HL |
| 41 | Carriage of cement from nearby source 20 km by MT 3 km by HL |
| 42 | Carriage of Stone from nearby source at an avg distance 1.5 km by HL |
| 43 | Carriage of Steel from nearby Source 20 km by MT & 3km by HL |
| 44 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 40mm dia |
| 45 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 32mm dia |
| 46 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 25mm dia |
| 47 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 20mm dia |
| 48 | P/F GI unions in complete incl. Cutting and threading the pipes and making long screws 15mm dia Please Enable Macros to View BoQ information |