|
| 1 | Running Maintenance and operation of clear water booster pump set, submersible pump set & D.G set as per inventory, terms condition attached by deploying following staffs:-a) Operators(Gr.-II)- 2 Nos. from 6:00 AM to 2:00 PM and 2:00 PM to 10:00 PMb) Khallasi – 1 No. from 10:00 PM to 6:00 AMc) Wireman (Gr-I) – 1 No. - shall attend the sites of work between 9:00 A.M. to 5:00 P.M. at least once in a fortnight and as and when required. |
| 2 | Dismantling and repairing i/c S/R of following worn out parts of existing 20 HP clear water pump of kirloskar make suitable for operation on 415 volts , 3 phase ,50 hz ,AC supply i/c re-assembling/re-installation the same, connection with suction and delivery line, valves, testing etc. completed as reqd (i/c Rebate on dismantle materials):- (i) Remelting,Repairing of Pump shaft i/c Turning & Grinding - 1 No. |
| 3 | (ii) S/R of Bal bearing - 2 Nos. |
| 4 | (iii) S/R of Gland plate- 1 Set |
| 5 | (iv) S/R of nut,bolts & stud etc.- 1 set . |
| 6 | (v) S/R of Neck Ring- 1 set . |
| 7 | (v) S/R of Gland sleeve- 1 set . |
| 8 | Dismantling and rewinding i/c S/R of following worn out parts of existing 20 HP kirloskar make Induction motor(for clear water) i/c re-assembling/re-installation the same, connection with suction and delivery line, valves, testing etc. completed as reqd(i/c Rebate on dismantle materials):- (i) Rewinding of 20 HP motor - 1No. |
| 9 | (ii) S/R of Connection plate - 1 No. |
| 10 | (iii) varnishing- 1 No. |
| 11 | (iv) S/R of ball bearing - 2 Nos. |
| 12 | Repairing & rewinding of 5 HP submersible pump set 25 stage (Three phase) of existing make i/c reassembling/re-installationthe same, connection with delivery line,valve, testing etc as reqd. complete in all respect.(i/c Rebate on dismantle materials):- i) Rewinding of 5HP sub.Motor-1 No. |
| 13 | (ii) S/R of bearing bush - 4 Nos. |
| 14 | (iii) S/R of water seal- 1 Set |
| 15 | (iv) S/R of thurst plate- 1 set . |
| 16 | (v) S/R of thurst bearing- 1 set . |
| 17 | (vi) S/R of Neck Ring- 1 set . |
| 18 | (vii) S/R of guide bush- 1 set . |
| 19 | (viii) S/R of distance bush & dol bush-1 set . |
| 20 | (x) S/R of Running Sleeve- 1 set . |
| 21 | Repairing & rewinding of 5 HP vacuum pump set (Three phase) of existing make i/c reassembling/re-installationthe same, connection with delivery line,valve, testing etc as reqd. complete in all respect.(i/c Rebate on dismantle materials):- i) Rewinding of 5HP sub.Motor-1 No. |
| 22 | (ii) Impeller Balancing-1 No. |
| 23 | (iii) S/R of Gland Sleeve- 1 set . |
| 24 | (iv) S/R of check nut- 1 set . |
| 25 | (v) S/R of Gland plate- 1 set . |
| 26 | (vi) S/R of packing kit. |
| 27 | (vii) S/R of worn out nut-bolt,stud etc. |
| 28 | Lifting of submersible pump sets along with G.I. pipes and accessories i/c dismantling of pump set from delivery line etc. complete as reqd. |
| 29 | Lowering of submersible pump set in the existing bore with G.I. pipes i/c replacement of existing nuts & bolts, connections of delivery line, valves cable jointing, testing etc. completed as reqd. |
| 30 | Supply and Replacement of PVC insulated / PVC sheathed copper cond. Submersible cable of following size i/c connection testing etc as reqd.a) 3 x 2.5 sq.mm |
| 31 | Supplying of high speed diesel for operation of DG set i/c cartage, storage, filling and arrangement of minimum 200 ltrs capacity drum/tank for carrying diesel at site etc. complete as required. Please Enable Macros to View BoQ information |