| 1 | Dismetalling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviciaable and unserviceable materials separately. |
| 2 | Earth work in excavation of foundation & plinth in hard soil including levelling the bed etc complete as per the direction of Engineer in charge. |
| 3 | Providing and filling manually with selected sand in layers not exceeding 200mm thick including watering and compacting with all leads and lifts etc. For finished item of work as per Specification. |
| 4 | P.C.C.( 1:3:6 ) in foundation/Sub structure using 40 mm size H.G. metal well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complet and as per the direction of the E.I.C. |
| 5 | Plain Cement Concrete PCC Grade M15 in open foundation complete as per drawing and technical specifications including hosting and laying, well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete.and as per the direction of Engineer in charge.Below Bed Level |
| 6 | Above Bed Level |
| 7 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical space between vertical post for expansion, complete as per approved drawings and technical specifications.Pire Cap,Dirt wall & guard Post |
| 8 | R.C.C. M-25 grade using 20 mm size and down graded black hard granite (crusher broken) stone chips including hosting and laying, well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete.and as per the direction of Engineer in charge.Raft |
| 9 | Above Bed Level |
| 10 | Deck slab |
| 11 | R.C.C. M-30 grade using 20 mm size and down graded black hard granite (crusher broken) stone chips including hosting and laying, well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete.and as per the direction of Engineer in charge.Wearing Coat |
| 12 | Supply of HYSD bars confirming to grade S-415 cutting bending, binding, lapping, splicing, welding etc. (conforming to ISI specification) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor (standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987) |
| 13 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing |
| 14 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound(where specified)and water finishing to lines and grade as per drawing and technical specification for road and bridge works (4 th Revision) Please Enable Macros to View BoQ information |