| 1 | Man power supply for PP Area |
| 2 | Providing assistance in field operation for shift duties in Pressure Part Area (man days) as per scope of work |
| 3 | (A-1) Engineer (diploma)/ Supervisior |
| 4 | (A-2) Skilled |
| 5 | Providing Supervisor for executing all assigned work efficiently (man days) as per scope of work |
| 6 | Engineer (diploma)/ Supervisior |
| 7 | Daily routine maintenance work & up keeping of Soot Blower System & Fuel Oil System of Unit # 5 & 6 (man days) as per scope of work |
| 8 | Skilled |
| 9 | Semi skilled |
| 10 | Unskilled |
| 11 | Daily routine maintenance works & up-keeping of control valves, all type of conventional valves, safety valves, NRVs of unit # 5 & 6 (man days) as per scope of work |
| 12 | Skilled |
| 13 | Semi skilled |
| 14 | Unskilled |
| 15 | Routine cleaning of boiler area from 8.5 mtr step to Boiler roof level elevation & each floor area, PRDS Valves & Piping at PRDS floor, each critical pipe line i.e. MS,HRH, CRH, Boiler feed lines etc from boiler end to turbine end elevation, start-up boiler & its associated areas and FO pump house inner area (man days) as per scope of work |
| 16 | Unskilled |
| 17 | Providing ONE team to carry out checking, monitoring of Pressure vassels i.e. Boiler 1st pass, 2nd pass , critical piping , BCP, Aux. Boiler , FO Heating Line , FO Pump house etc for Unit#5 & 6,CSCTPP (man days) as per scope of work |
| 18 | Highly Skilled |
| 19 | Semi skilled |
| 20 | Unskilled |
| 21 | PART-I of Annual Work Contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (HP/LP Valves, Soot blowers, Hangers & Fuel oil system, HP welding etc.) of Unit #5 & 6 (2X660 MW), CSCTPP, RVUNL,CHHABRA. |
| 22 | PART-III of Annual Work Contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (HP/LP Valves, Soot blowers, Hangers & Fuel oil system, HP welding etc.) of Unit #5 & 6 (2X660 MW), CSCTPP, RVUNL,CHHABRA. |
| 23 | PART-IV of Annual Work Contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (HP/LP Valves, Soot blowers, Hangers & Fuel oil system, HP welding etc.) of Unit #5 & 6 (2X660 MW), CSCTPP, RVUNL,CHHABRA. |
| 24 | PART-V of Annual Work Contract for the work routine, breakdown and annual maintenance work of boiler pressure part and its associated auxiliaries (HP/LP Valves, Soot blowers, Hangers & Fuel oil system, HP welding etc.) of Unit #5 & 6 (2X660 MW), CSCTPP, RVUNL,CHHABRA. Please Enable Macros to View BoQ information |