|
| 1 | PART-A (Bldg.) |
| 2 | 2.7.1/PHEDDeepening of existing tube well by DTH system beyond existing depth upto 100 mtr. and above in all type of rocks including flushing of tube well and obtaining sand free water. Nominal bore 150 mm dia. |
| 3 | 2.24.1/PHEDProviding & Lowering in tube well ISI marked GI Pipe medium duty (“B\\" class), Steel tube as per IS:1239 or amended up to date and zinc coating as per IS 4736, threaded and double flanged (welded) on both ends and two number 25x3mm MS flat welded on both ends between pipe & flange, rubber washer & nut bolts etc. complete in all respect. 32 mm dia. |
| 4 | Supply & Fixing M S clamp set of 50x6 mm flat from iron with nuts and bolts etc for holding the riser pipe assembly of submersible pump set. (2.22) |
| 5 | 4.8.4/S-4S & F tube well cover of M.S. sheet (6 mm th ) with nuts and bolts complete for casing size 200 mm dia |
| 6 | Supply & Fixing of ISI marked three core PVC flat submersible cable as per IS 694:1990 or amended up to date and conductor as per class 5 of IS 8130:1980 including making connection etc.(A) 3 core 4.0 Sq.mm. (P 2.19.1) |
| 7 | (B) 3 core 6.0 Sq.mm. (P 2.19.2) |
| 8 | Supply & Installation of single phase ISI marked submersible motor pump set of three star or better rating of BEE and as per IS: 8034-2018 (pump) and IS 9283-2013 (motor) or as amended up to date of approved make of following duty condition with required accessories including making connection suitable for tube well/DCB. The job includes lowering of motor pump, installation of complete fitting & accessories, jointing of electrical cables up to switch board, testing of submersible pump set and interconnection up to water mains, complete in all respect. Above 2.0 KW. (2.14.2/PHED) |
| 9 | Supply & Installation of 3 phase ISI marked submersible motor pump set of three star or better rating of BEE and as per IS: 8034-2018 (pump) and IS 9283-2013 (motor) or as amended up to date of approved make of following duty condition with required accessories including making connection suitable for tube well/DCB. The job includes lowering of motor pump, installation of complete fitting & accessories, jointing of electrical cables up to switch board, testing of submersible pump set and interconnection up to water mains, complete in all respect. Up to 5.5 KW (7.5 HP) & head above 120 mtr.. (2.15.2/PHED) |
| 10 | Providing & Lowering in tube well ISI marked HDPE pipe as per IS 4984:1995 or amended upto date in PE 80 grade and class PN 10 of following dia. including HDPE/GI fittings and PVC rope confirming to IS 5175:1992 or amended upto date, along with clamping of submersible cable etc. complete in all respect. 40mm dia (2.25.1) |
| 11 | Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect. (A) Delowering and Lowering. (E 21.1.3) |
| 12 | (B) Delowering only. (E 21.1.2) |
| 13 | Development of tube well having depth up to 250 mtr as per IS: 11189- 1985 and IS: 2800 (Part- I)- 1991 (both amended up to date) using suitable methods to give sand free water for required yield of the gravel packed tube well. (2.10) |
| 14 | 26.74.2/ERewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire 'E' class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 2.0 H.P.to 3.0 HP |
| 15 | 26.75.2/ERepairing of submersible pump of with replacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 2.0 H.P.to 3.0 HP |
| 16 | PART-B (Electrical work) |
| 17 | SITC of IP 54 OEM Fabricated DOL/Star-Delta Starter panel with switchgear selection as per Type-2 Coordination Chart and made out from 1.6 mm thick powder coated CRCA sheet, enclosure comprising of over load protection relay, short circuit & single phasing protection(for three phase pumps), Illuminated ON / OFF push buttons, ammeter, voltmeter, indicating lamps, 2P/4P MCB etc. suitable for following rating motors complete in all respect. 2.0 HP to 3.0 HP (DOL starter). (21.13.1.2) |
| 18 | PART- C (Item Rate Basis) |
| 19 | Repair of pannel board for submersible pump installed at various JPD premises including changing/repairing of Capacitor/Voltmeter/ammeter/relay/indicating lamps for start and run position/ any part to make pannel board in working condition complete in all respect as per directions of Engineer in Charge. The job also includes warranty of pannel board upto maturity of SD work including frieght charges of parts with mechanics upto shop required if repairing of panel board attended again within warranty preiod 1.0 HP to 3.0 HP (Single phase) |
| 20 | P&F of 4 nos HSFG nuts and bolts of 3\\" size as per IS specification along with washer and heavy duty rubber seal for jointing of GI pipes of 32/50mm dia for submersible pump i/c all labour, transortation, T&P complete as per direction of E/I. |
| 21 | P&F Steel nipples with nuts and bolts for jointing/extending 40mm OD HDPE Pipe including all T&P labour etc as per directions of Engineer in Charge for all lead and lift Please Enable Macros to View BoQ information |