| 1 | Supply Part of LT Line with AAAC 7/3.15 (0.070 km) Sasan |
| 2 | Steel Tubular Poles 8 mtr. Long with base plate |
| 3 | Muff for steel tubular pole with concrete filling |
| 4 | AAAC Conductor 7/3.15, 55 sq. Mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)) |
| 5 | PVC (1.1 kV, AI, Un-Armour 3.5 x 35 sq. mm |
| 6 | Single Continuous Earth wire (G.I Wire 8 SWG) |
| 7 | Shackle Insulator |
| 8 | D-Iron |
| 9 | Stay Set Complete |
| 10 | Stay Wire |
| 11 | Earth Knob |
| 12 | Nuts & Bolts Off sizes |
| 13 | Aluminium Paint |
| 14 | Red Oxide Point |
| 15 | Supply Part of LT Line with AAAC 7/3.15 (0.325 km) Dhanot |
| 16 | Steel Tubular Poles 8 mtr. Long with base plate |
| 17 | Muff for steel tubular pole with concrete filling |
| 18 | AAAC Conductor 7/3.15, 55 sq. Mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)) |
| 19 | PVC (1.1 kV, AI, Un-Armour 3.5 x 35 sq. mm |
| 20 | Single Continuous Earth wire (G.I Wire 8 SWG) |
| 21 | Shackle Insulator |
| 22 | D-Iron |
| 23 | Stay Set Complete |
| 24 | Stay Wire |
| 25 | Earth Knob |
| 26 | Nuts & Bolts Off sizes |
| 27 | Aluminium Paint |
| 28 | Red Oxide Point |
| 29 | Supply Part of Aug. of 63 kVA to 100 kVA Distribution Sub-station Sasan |
| 30 | Aluminium Thimble 120 sq mm |
| 31 | LT Cable 3.5 Core 120 sq. mm |
| 32 | Surge Arrestor 9 kV Station |
| 33 | Nuts & Bolts Off sizes |
| 34 | Pipe Earthing Set |
| 35 | 8 SWG GI Wire for Earthing |
| 36 | 3-Ph, 4-Wire Trivector meter 100/5 A |
| 37 | Supply Part of Aug. of 25 kVA to 100 kVA Distribution Sub-station Dhanot |
| 38 | Aluminium Thimble 120 sq mm |
| 39 | LT Cable 3.5 Core 120 sq. mm |
| 40 | Surge Arrestor 9 kV Station |
| 41 | Nuts & Bolts Off sizes |
| 42 | Pipe Earthing Set |
| 43 | 8 SWG GI Wire for Earthing |
| 44 | 3-Ph, 4-Wire Trivector meter 100/5 A |
| 45 | Erection Part of LT Line Sasan |
| 46 | Erection Charges & Transportation Charges complete in all respect of LT Line |
| 47 | Erection Part of LT Line Dhanot |
| 48 | Erection Charges & Transportation Charges complete in all respect of LT Line |
| 49 | Erection Part of Aug. of 63 kVA to 100 kVA DTR Sasan |
| 50 | Erection Charges & Transportation Charges complete in all respect of aug. of 11/0.4 kV, 63 to 100 kVA DTR |
| 51 | Erection Part of Aug. of 25 kVA to 100 kVA DTR Dhanot |
| 52 | Erection Charges & Transportation Charges complete in all respect of aug. of 11/0.4 kV, 63 to 100 kVA DTR Please Enable Macros to View BoQ information |