|
| 1 | Contract Jobs of Dismantling, Fabrication and Erection |
| 2 | Dismantling of M.S. Pipe, 1\\" to 12\\" dia |
| 3 | Erection of M.S. Pipe 1\\" to 12\\" dia |
| 4 | Fabrication of Nipple 1\\" to 12\\" dia |
| 5 | Erection of Nipple 1\\" to 12\\" dia |
| 6 | Dismentling of Bend 1\\" to 12\\" dia |
| 7 | Fabrication of Bend 1\\" to 12\\" dia |
| 8 | Erection of Bend 1\\" to 12\\" dia |
| 9 | Dismantling of Valve 1\\" to 12\\" dia |
| 10 | Erection of Valve 1\\" to 12\\" dia |
| 11 | Dismentling of Reducer/Tee 1\\" to 12\\" dia |
| 12 | Fabrication and erection of Reducer/Tee 1\\" to 12\\" dia |
| 13 | Cutting and fitting of Old Flanged/ Blind 1\\" and above |
| 14 | Fabrication of M.S. Pipe Line above 12\\" dia from M.S. Plate |
| 15 | Dismantling of M.S. Pipe Line above 12\\" dia |
| 16 | Erection of M.S. Pipe Line above 12\\" dia |
| 17 | Dismantling of Nipple above 12\\" dia from M.S. Plate |
| 18 | Fabrication of Nipple above 12\\" dia from M.S. Plate |
| 19 | Erection of Nipple above 12\\" dia from M.S. Plate |
| 20 | Dismantling of Valve above 12\\" dia |
| 21 | Erection of Valve above 12\\" dia |
| 22 | Dismantling Fabrication and Erection,of Bend from MS Plate |
| 23 | Dismantling Fabrication and Erection of teefrom MS Plate |
| 24 | Dismantling Fabrication and Erection of reducer from MS Plate |
| 25 | Fabrication of S.S. Pipe Line 6\\" to 24\\" dia from S.S.plate |
| 26 | Dismantling of S.S. Pipe Line 6\\" to 24\\" dia |
| 27 | Erection of S.S. Pipe Line 6\\" to 24\\" dia from S.S. Plate |
| 28 | Dismantling Fabrication and Erection,of Bend from SS Plate |
| 29 | Dismantling Fabrication and Erection of teefrom SS Plate |
| 30 | Dismantling Fabrication and Erection of reducer from SS Plate |
| 31 | Dismantling Fabrication and Erection of NIPPLE from SS Plate |
| 32 | Dismantling Fabrication and Erection,of Platform |
| 33 | Dismentling , Fabrication and Erection of Railing |
| 34 | Patch work to any machinery like cc,elevator rbc chain side plate ,tank etc. |
| 35 | Dismantling & erection of IBR pipeline upto 6” Dia |
| 36 | Dismantling & erection of IBR bends/reducers/nipple Upto 6” dia |
| 37 | Dismantling and erection of IBR valve upto 6” dia |
| 38 | Fabrication and Erection of discharge baggase chute of mill no.4 |
| 39 | Fabrication & Erection of under feeder 14\\" dia & modification of inter carrier of mill No. 3&4 |
| 40 | Fabrication and Erection of Staircase at cane unloader along with railing , platform etc. |
| 41 | Dismantling, Fabrication , Erection of Boiler ID fan flue gas ducting |
| 42 | Dismantling, Fabrication Erection of FD fan ducting |
| 43 | Dismantling , Fabrication and erection of MS ducting from Wet scrubber outlet to chimney for boiler |
| 44 | Dismantling , Fabrication and erection of MS ducting at suction of Wet scrubber for boiler |
| 45 | Dismantling , Cleaning , Testing ,Painting and refitting of Gilled Type Economiser Elements . No. of elements are 48 no.’s. Hydraulic Test also to be done after fitting of all elements. |
| 46 | Dismantling, Fabrication Erection of Damper of ID/FD Fan of Boiler with supports |
| 47 | Fabrication and fitting of ID fan suction bend for Boiler |
| 48 | Fabrication and Erection of Flanged end Observation / Cleaning doors for Economiser of Boiler no. 2 |
| 49 | Replacement of Shell of Wet Scrubber along with MS Mesh from Ms Plate |
| 50 | Dismantling , Fabrication and erection of perforated plate of Wet scrubber for Boiler |
| 51 | Patchwork of Wet Scrubber casing/Ducting/bottom cone/Clarifier |
| 52 | Modification & replacement of Suction ducting from Ash Hoper of Air Heater to ID Fan of boiler no.1 & 2 |
| 53 | Existing ID Fan shifted from outside to inside with ducting of boiler no.1 |
| 54 | Dismentling Fabrication and erection of Strainers |
| 55 | Dismentling Fabrication and erection of bed of any type of pumps and motor or reduction gear box with motor. |
| 56 | Replacement of MS Flat/runner/side plates/MS railing/square bar etc. for chains of Mill House. |
| 57 | Replacement of MS Bottom Trough of RBC/BE Chain |
| 58 | Replacement of runner along with supporting angle/ channel for Cane Carrier chain / inter carrier chain |
| 59 | Dismantling, Fabrication & Erection of MS plate of cane carrier side plates with supports |
| 60 | Replacement of RVF agitator |
| 61 | Dismantling & erection of platform from old scrap material |
| 62 | Dismantling, Fabrication and Erection of De supper heated steam MS plate along with pipes |
| 63 | Replacement of SS Tube of Juice Heaters/ VLJH |
| 64 | Replacement of Brass/SS Tube of any Pan |
| 65 | Dismentling, Fabrication and Erection of Umbrella of quad body |
| 66 | Dismentling, Fabrication and Erection of Umbrella of Pan body |
| 67 | Replacement of old brass/SS tubes of with new SS tubes of Quad/vapour cell |
| 68 | Dismentling, Fabrication and Erection of broken ribbon of any crystallizer. |
| 69 | Dismantling of vapour pipe 36\\" to 40\\" dia |
| 70 | Fabrication of vapour pipe 36\\" to 40\\" dia |
| 71 | Erection of vapour pipe 36\\" to 40\\" dia |
| 72 | Dismantling, Fabrication and Erection of Save all of quads from 8 mm to 12 mm M.S. Plate |
| 73 | Dismantling, Fabrication and Erection of Save all of pans from 8 mm to 12 mm M.S. Plate |
| 74 | Replacement of J-Pipe in vapour cell/Quad Body/pan |
| 75 | Stengthing of Umbrella of Pan/ Evaporator Bodies |
| 76 | Fabrication and Erection of Distributor in down take of Pans |
| 77 | Replacement of Bottom compartment Grooves for fitting of rubber strips of juice heaters. |
| 78 | Dismantling, Fabrication and Erection of injection header size 600/800mm dia with 10 mm plate. |
| 79 | Replacement of Pan body shell from Calenderia to top cone |
| 80 | Replacement of worn out bottom cone of pan from 16mm thick plate |
| 81 | Dismentling, Fabrication and Erection of Top cone of pans |
| 82 | Replacement of shell of quad no.4 from calendria to Saveall |
| 83 | Replacement of worn out top compartment shell dia 14/1/2 ft x 3.5 ft height of dorr |
| 84 | Replacement of worn out shell of calendria of Pan No.3 |
| 85 | Replacement of worn out vapour pipe dia 600 from 8mm thick plate |
| 86 | Replacement of worn out Bottom/side plates of Molasses/Syrup Storage Tank. |
| 87 | Dismantling, Fabrication and Erection of broken arms of any crystallizers |
| 88 | Dismentling, Fabrication and Erection of wornout shaft of crystallizer |
| 89 | Erection of Super heater at centrifugal machine with all existing connections |
| 90 | Dismantling & Erection of Transient heater with all existing connections above Centrifugal Machine. |
| 91 | Replacement of worn out roof of final molasses tank dia 20 meter from 6mm plate |
| 92 | Replacement of wron out shell of final molasses tank from bottom 1.25 meter from 12mm plate |
| 93 | Replacement of broken arm of meter |
| 94 | Dismantling & Erection of C.F Machine No.8 Foundation |
| 95 | Dismantling, Fabrication & Erection of Clear juice Sum Box Please Enable Macros to View BoQ information |