| 1 | Safe carriage, loading-unloading with proper stacking of following material from ESC-Daliganj to JE -Dump Store – |
| 2 | ST POLE 9/11 MT LONG |
| 3 | 11KV 3X70/120/185 SQ MM XLPE CABLE |
| 4 | 11 KV ST/TH C/J KIT 3X70/120/185 SQ MM |
| 5 | 11KV PIN INSULATOR |
| 6 | 11KV PIN WITH NUT |
| 7 | 11KV END TERMINATION O/DOOR & I/DOOR 3X70/120/185 SQ MM |
| 8 | Stone Pad |
| 9 | LT AB Cable (3x120+1x95x1x16) |
| 10 | Distribution Box |
| 11 | Safe carriage, loading-unloading with proper stacking of following material from JE -Dump Store –to Work Site |
| 12 | ST POLE 9/11 MT LONG |
| 13 | 11KV 3X70/120/185 SQ MM XLPE CABLE |
| 14 | 11 KV ST/TH C/J KIT 3X70/120/185 SQ MM |
| 15 | 11KV PIN INSULATOR |
| 16 | 11KV PIN WITH NUT |
| 17 | 11KV END TERMINATION O/DOOR & I/DOOR 3X70/120/185 SQ MM |
| 18 | Stone Pad |
| 19 | LT AB Cable (3x120+1x95x1x16) |
| 20 | Distribution Box |
| 21 | Fabrication & erection of 11 KV cable exposure type double pole with the provission of cable with fixing of necesory clamps and other acessories like danger board, number plate, barbed wire,2 no. channels 100x50 mm (1600mm each),1 no.MS channel 100x50mm(3200mm in length) for supporting the hoisting of cable & poles.its jumpering by single core PVC aluminium cable with proper size Al.lug after making three phase busbar with help of 11 KV pin,pin insulator and PVC cable. (all material arranged by contractor except steel,pole,PVC aluminium cable & insulator).as per RESPO norms. |
| 22 | Cable laying in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. Inter axial spacing between the two cable should be in between 0.25 m to 0.40m. the two cables should be seprated by a partition of single bricks (All the material required for laying will be supplied by the contractor except 11 KV XLPE cable) |
| 23 | Hoisting of 11KV XLPE cable3x70/120/185 sq mm on double pole with MS pipe 2 M long including its jumpering complete with clamps, nuts and bolts(all material arranged by contractor). |
| 24 | Digging of pit of size 3x2x1 mtr. for making straight through joint 11 KV size 3x/70185/120 sq mm work included boxing of pit by the help of sand, bricks and stone slab filling of soil leveling and ramming of the same .(S/Th Provided by department) |
| 25 | High Pressure testing of 11 KV XLPE cable. Testing equipment will be arranged by the contractor. |
| 26 | Opening of consumer connection from existing line again reconnection with newly ercted L.T. distribution box/pillar box. |
| 27 | 3 Phase (cable provided by contractor) |
| 28 | Fabrication & erection of single pole for LT line on 09 /11M long ST pole with fixing of necessary clamps & other acessories like clamp hook,dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required). |
| 29 | Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt and balance material like holding clamp,eye hook,suspension clamp and dead end clamp arranged by contractor .) |
| 30 | Fixing of earth rod (2500x20mm) as per norms. For earthing support of old existing poles of LT lines including 6 SWG GI/Earth wire. (All Materials provided by contractor) |
| 31 | Digging of Pit in kachcha/Pakka land in depth upto 1/6 length of Pole, Dragging of STP from near by place/Dump, Erection of Single pole along with stone pad in bottom with proper alignment of line for 11 KV line on 11 M long ST Pole and refilling with ramming of earth. |
| 32 | Grouting of pole in depth of 1/6 the length of pole in ratio 1:4:8 in cement sand and brick balast as per RESPO norms. |
| 33 | Plinthing of Pole |
| 34 | Painting of new erected ST pole with two coat of red oxide paint,PO red paint at top of pole 2 M & balance by two coats of best quality aluminium paint ISI of Burger/Nerolac/Asian mark as per norms. |
| 35 | Making of circuits and taping of line |
| 36 | Dismentling of 11KV line, L.T. lines & distribution boxes and its dump at suitable place on site up to complition of work and its safe loading/unloading/weighing carriage from dump site to je\\"s store/ESC daliganj (Except broken PCC Pole). |
| 37 | ST Pole 11 Mt Long |
| 38 | All taxess as applicable shall be paid time to time extra. Please Enable Macros to View BoQ information |