| 1 | Consulting detailed topographical survey at grid interval of 3m C/C which includes allocation of boundary, locating all the existing structures/services etc getting information about under ground cables sewer lines, fire control system etc. from various sources and compilation of available data at site.Note : Clearance of shrubs/grass is included in above item. |
| 2 | DETAILED SOIL INVESTIGATION:-Mobilization of equipment to site for detailed soil investigation and shifting them location to location of boreholes and for in-situ tests |
| 3 | Boring holes 150mm dia in any type of soil including weathered rock & SDR but excluding soft/hard rock/fractured rock upto a depth until hard rock/ fractured rock strata encountered including following activities:-(a) Conduct of SPT at every 1.5m interval or change of strata whichever occurs earlier.(b) Collection of undistrubed soil samples (UDS) at every 1.5m interval or change of starta whichever occurs earlier(a minimum gap of 500mm shall be ensured between SPT and collection of UDS).Note:(i) Written permission of CWE shall be obtained for deep boreholes when pile foundation is contemplated.(ii) In case of deep boreholes anticipating pile foundation at least boreholes in all 4 corners of the building shall go upto 6.5m below rock strata. |
| 4 | Drilling holes in any type of rock (Soft/Hard) using hydraulic drilling machine within the borehole for cutting cores in rock and collection of cores of requisite size and length as per relevant IS standards. Logging core recovery. Drilling shall continue till minimum 5m into hard rock starta. Conduct of following laboratory tests on rock samples/cores collected from boreholes as per relevant Indian Standards [ see IS 2720(all parts) and IS 1498, IS 9143, IS 13030,IS 9221,IS 8764, IS 9179, IS 10050,IS 10082,IS 10782,IS 12608,IS 13047,IS3025]: (a) Visual Classification; (b) Density: (c) Specific gravity: (d) Hardness; (e) Slake durebility/ Degree fo weathering; (f) Uniaxial compression test (crushing strength both saturated and unsaturated. (g) Point load strength index; (h) RQD (Rock Quailty Designation)Note:(a) Item to be operated only in case of encountering rock in borehole with the writtern permission of GE. |
| 5 | Conduct of following laboratory test as per relevant Indian Standards [see IS 2720(all parts), IS 1498 and IS 3025] on soil samples collected:(a) Test on disturbed/undisturbed soil samples: (i) Visual and engineering classification: (ii) Sieve analysis and hydrometer analysis: (iii) Atterberg's limit.(liquid limit, plastic limit and shrinkage limit): (iv) Specific gravity. (v) Free swell index(b) Test on undisturbed soil samples: (i) Bulk Density and moisture content. (ii) Unconfined compression test (on remoulded undisturbed sample): (iii) Swelling pressure (on undisturbed and remoulded sample): (iv) Determination of C & Ø values using Direct shear (drained/undrained) (On remoulded or undisturbed sample) or Triaxial compression test (on undistrubed or remouled sample). Or Vane shear test.Note: - The rate shall be proportional to depth of bore hole. |
| 6 | Chemical analysis of ground water sample collected at bottom of one boreholes. |
| 7 | Chemical analysis of soil samples one each from each strata in respect of one borehole. If different strata (s) encountered in any other borehole addition soils samples are to be analysed |
| 8 | Conduct of california bearing ratio (CBR) Test in accordance with IS 2720 (Part 16) on soil sample collected at subgrade level for road with flexible wearing course. |
| 9 | Conduct of Plate Load Test to determin \\"subgrade modulus\\" in accordance with IS 9214 at subgrade level for road with Rigid wearing course. |
| 10 | Preparation of concept plan, design basis report, Architectural working drawing including 3D view from various angle in preparation of Arch Drgs and services along with proof checking from IIT/NITs. |
| 11 | (i) Indoor Swimming Pool (Olympic size of 50mx21m as per SoA Chapter 8 Table 8(VIII) for 2001 to 4000 Person), including Diving Pool (16m x16m), Cascade, Plant Room, Spectators Gallary, Diving tower with board, Balancing Tank, RCC retaining Wall and other connected misc works |
| 12 | (ii) Changing room with Sanitary Annexure for ladies and gents separately (200 Sqm) |
| 13 | (iii) Store Room (20 Sqm) |
| 14 | (iv) 2 Nos Life Guard Room incl sanitary annexure (25 Sqm) |
| 15 | (v) DSO Cabin room (25 Sqm) |
| 16 | (vi) Offices (100 Sqm) |
| 17 | Note : The above Job includes:-(a) Preparation and approval of line plan and site plan.(b) Preparation and approval of architectural drawing duly vetted by NIT/IIT.(c) Zonal specification of HQ CE (Navy) alongwith relevant BIS/NBC code has to be followed.(d) All approval has to be obtained from HQ CE (Navy) Vizag Zone. |
| 18 | Preparation of concept plan, design basis report, preparation of structural design and working drawing and services along with proof checking from IIT/NITs. |
| 19 | (i) Indoor Swimming Pool (Olympic size of 50mx21m as per SoA Chapter 8 Table 8(VIII) for 2001 to 4000 Person), including Diving Pool (16m x16m), Cascade, Plant Room, Spectators Gallary, Diving tower with board, Balancing Tank, RCC retaining Wall and other connected misc works |
| 20 | (ii) Changing room with Sanitary Annexure for ladies and gents separately (200 Sqm) |
| 21 | (iii) Store Room (20 Sqm) |
| 22 | (iv) 2 Nos Life Guard Room incl sanitary annexure (25 Sqm) |
| 23 | (v) DSO Cabin room (25 Sqm) |
| 24 | (vi) Offices (100 Sqm) |
| 25 | Note : This Job includes:-(a) Preparation and approval of structural drawing duly vetted by NIT/IIT.(b) Zonal specification of HQ CE (Navy) alongwith relevant BIS/NBC code has to be followed.(c) All approval has to be obtained from HQ CE (Navy) Vizag Zone. |
| 26 | Preparation and submission of detailed estimate, abstract, Yardstick and Market analysis based on GAD/Strctural Design. The items should be covered all forseen items of Civil & MEP items. The rates to be adopted from latest SSR with support of market rates/ quotations. |
| 27 | Site visit by technical person of minimum 5 year experience of Construction of Swimming pool for initial assessment & pre-construction as directed by Engineer-in Charge. |
| 28 | Note:1. The report shall include but not be limited to the following:-(a) Dimentional plan showing location and depth of in-situ testes: the co-ordinates of bore hole locations with reference to prominent permanent features of the site.(b) Geological information of the area.(c) General topography of the site, duly marking RL of the location of bore holes with reference to RL of nearby permanent feature available at site.(d) Bore-log and trial pit log.(e) Plot of standard penetration test (N values both uncorrected and corrected) with depth for identified areas.(f) Analysis and interpretation of Results.(g) Suitability of the soil for backfilling around foundation/fillingunder floors. (h) Susceptibility of sub-soil strata to liquefaction, if any, in the event of dynamic loading and requisite remedial measures.(j) Remedial measures against the presence of harmful chemicals in the sub-soil/ ground water.(k) Remedial measure for foundation footing, plinth beams and filling under floors in case of meeting expansive soils.2. The soil investigation report should be vetted by any IIT/NIT/ Andhra University.3. CD containing video evidence of depth of each bore hole & machinery deployed at site. Please Enable Macros to View BoQ information |