Tender For Construction Of Day Care Sub-Centre Cum Health & Well Ness Centre At Nuagada Under Nuagada Block Under Pm-Abhim
Tender Value
38.60 Lakhs
Estimated cost
Bid Submission
02 Jul 2026
0 days left
EMD
38700
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gajapati → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Day Care Sub-Centre Cum Health & Well Ness Centre At Nuagada Under Nuagada Block Under Pm-Abhim
BOQ
| Sl. No. | Item Description |
| 1 | Building Work, Ground FloorEarth work in excavation of foundation in hard or gravelly soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & required depth including shoring shuttering, propping bullah, pilling, dewatering from foundation supplying & working of pumps including hire & running charges of pumps & all machineries required for the work & providing coffer dam if required & stacking the excavated materials away from the working areas with Cess complete as per specification & direction of the Engineer-in-chargel. |
| 2 | Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, Cess & taxes of all materials & cost of all labour required for the work etc complete as per specification & direction of Engineer-in Charge. |
| 3 | Providing Cement Concrete (1:3:6) with 40mm size clean hand broken granite metal of approved quality from approved quarry includinghoisting lowering & levelling in position to required level in each layer not exceeding 15cm thick in foundation including frame work where neCessary ramming using vibrator to proper slope and levelling curing dewatering with cost conveyance royality, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, labour of all materials and including hire & running charges of machineries required for the work including supplying & working of pumps and Cess as per the specifiction and direction of Engineer-in- charge. |
| 4 | Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-fly ash-brick of 23cm X 11cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & labour & cess etc required for the work complete in all respect as per the direction of Engineer-in-charge. Foundation |
| 5 | Superstructure |
| 6 | RCC work of gradeM-20 having a minimum compressive strength in work text of 200Kg/cm2 in15cm cubesat 28daysafter mixing and tests conducted using 10mm to 20mm size (20mm not to exceed 25 percent) crusher black broken granite stone chips of approved quality and from approved quarry including hoisting,lowering and laying concrete by using vibrators watering and curing for four weeks centering and shuttering and finishing the exposed surface smooth to receive painting or white or clour wasing providing grooves or beads where neCessary including cost, conveyance,and royalties of all materials DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges,and labour & cess required for the work in all respect but execluding cost of reinforcement MS rods or tor steel and binding wires of 18 to 20 guage and labour charges etc, complete as per specification and direction of Engineer-in-charge. Column Base |
| 7 | RCC Column |
| 8 | RCC Plinth Beam |
| 9 | RCC Lintel |
| 10 | RCC Chajja |
| 11 | RCC Roof Beam |
| 12 | RCC Roof Slab |
| 13 | Straightening bent up or coiled rods cutting bending,binding, cranking hooking, welding jointing (if required) the M.S.Rods or Tor steel & binding wires and binding tying the grills hoisting lowering & placing in proper position as required for RCC works with cost conveyance of M.S. Rods or Tor steel & binding wires of 18 to 20 gauge and labour required for the work with Cess etc,complete in all floors (weight of binding wire will not be considered for payment and payment will be made on weight of M.S. Rods or Tor steel only) as per the direction of Engineer-in-Charge. |
| 14 | 12mm (1/2\\") thick cement plaster in C.M (1:6) finsihed smooth to out side brick walls after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and laobur required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges & Cess etc, complete in all floors as per direction of Engineer-in-charge. |
| 15 | 16mm (5/8\\") thick cement plaster in C.M. (1:6)finished smooth to inside surface of 9\\" thick brick wall after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and labour required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & Cess etc, complete in all floor as per direction of Engineer-in-charge. |
| 16 | 20mm (3/4\\") thick grading plaster with cement mortar (1:4) over roof slab after chipping and chiseling the same and cleaning surface by wire brushing laid to proper slope finsihed smooth to receive tarfelt tratment watering and curing including cost and conveyance of all materials and labour with T&P and Cessrequired for the work with alland royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges etc, complete in all respect in all floors as per direction of Engineer-in-charge. |
| 17 | Supplying,fitting & fixing vetrified tile in floors of size 600mm x 600mm of approved make conforming to IS:13755 with application of polymer modified quick set cement based water resistant adhesive conforming IS:15477 of 3 mm thick bed and filling joints with white cement of approved quality including cost,conveyance of all materials, labour,Cess etc required for the work with royality , DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges of all materials required for the work complete in all respect as per specification and direction of Engineer-in-charge. |
| 18 | Providing 20 cm X 30 cm ceramic wall tiles fixing in dadoos skriting and rises of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including polishing complete including cost of pre cast tiles watering & curing for 7 days with cost conveyance royalty DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges of of all materials & labour with Cess etc required for the work complete in all respect and surface finishing with polishing materials as directed by the Engineer-in-charge. |
| 19 | Supplying & Providing of M.S. window grill made out of M.S.Angle 25x25x3mm at the perigphery & M.S.Flat 25x6mm in the inner design conforming to IS 1977/95 with hold fast made out of MS angle as used in periphery as per the Design with cost, conveyance &or all materials & labour with T&P Cess in all respects as directed by Engineer-in-Charge. |
| 20 | Supplying & Providing of M.S. Pannelled door double leaved with MS frame over all size including frame made out of following materials conforming to relevant ISS frame: 30 x 30 x 5mm M.S.Angle door panel 1.0mm C.R.sheet panel stiffener covering width of leaf 19 x 5 mm flat 3 nos Hingessize 100 mm 3 nos bought out as per ISS hold fast 30x30x5mmMS angle 150mm length bifurcated at the tip 3 nos on one side handle 19x5mm M.S.Flat ,fabricated 2 Nos aldrop 2 nos bought out as per ISS Tower Bolt 2 nos bought out as per ISS including cost conveyance &of all materiasl& labour with T&P & Cess in all respectas per direction of Engineer In Charge. |
| 21 | Labour for fitting,fixing of M.S.window grill as per approved design including cost of screws with cost of all labour, T&P and Cess required for the work etc, complete excluding cost & conveyance of M.S.Door/Window in all respects as directed by Engineer-In-Charges. |
| 22 | Labour for fitting and fixing of M.S..Gate as per approved desing including cost of all materials and Cess etc complete as per specification and direction of Engineer-in-Charge |
| 23 | Painting two coats with any approved paint over a coat of primer to Iron work including cost of the paint & primer sand papering polishing the surface with cost conveyance of all materials and labour required for the work with Cess etc complete as per the direction of the Engineer-In-Charge. |
| 24 | Distempering two coats to the wall surface with any approved shade over a coat of chalk wash including cost of distemper with conveyance royalities andof allmaterials and labour with T&P required for the work with Cess etc, complete in all respect as per direction of Engineer-in-charge. |
| 25 | Finishing wall surface two coats with any approved weather shield cement paint to outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials, labour and Cess required for the work complete in all respect as per the direction of Engineer-in-Charge. |
| 26 | Supplying,fitting,fixing of U PVC sliding window of approved make with 6mm thick black glass of approved quality with rubber beading including locking arrangement with cost of all materials including 6 mm thick cost of glass, labour, cess etc required for the work complete as per specification & direction of Engineer-in-charge. |
| 27 | First FloorRCC work of gradeM-20 having a minimum compressive strength in work text of 200Kg/cm2 in15cm cubesat 28daysafter mixing and tests conducted using 10mm to 20mm size (20mm not to exceed 25 percent) crusher black broken granite stone chips of approved quality and from approved quarry including hoisting,lowering and laying concrete by using vibrators watering and curing for four weeks centering and shuttering and finishing the exposed surface smooth to receive painting or white or clour wasing providing grooves or beads where neCessary including cost, conveyance,and royalties of all materials DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges,and labour & cess required for the work in all respect but execluding cost of reinforcement MS rods or tor steel and binding wires of 18 to 20 guage and labour charges etc, complete as per specification and direction of Engineer-in-charge. RCC Column |
| 28 | RCC Lintel |
| 29 | RCC Chajja |
| 30 | RCC Roof Beam |
| 31 | RCC Roof Slab |
| 32 | Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-fly ash-brick of 23cm X 11cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & labour & cess etc required for the work complete in all respect as per the direction of Engineer-in-charge. Superstructure |
| 33 | Straightening bent up or coiled rods cutting bending,binding, cranking hooking, welding jointing (if required) the M.S.Rods or Tor steel & binding wires and binding tying the grills hoisting lowering & placing in proper position as required for RCC works with cost conveyance of M.S. Rods or Tor steel & binding wires of 18 to 20 gauge and labour required for the work with Cess etc,complete in all floors (weight of binding wire will not be considered for payment and payment will be made on weight of M.S. Rods or Tor steel only) as per the direction of Engineer-in-Charge. |
| 34 | 12mm (1/2\\") thick cement plaster in C.M (1:6) finsihed smooth to out side brick walls after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and laobur required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges & Cess etc, complete in all floors as per direction of Engineer-in-charge. |
| 35 | 16mm (5/8\\") thick cement plaster in C.M. (1:6)finished smooth to inside surface of 9\\" thick brick wall after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and labour required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & Cess etc, complete in all floor as per direction of Engineer-in-charge. |
| 36 | Supplying,fitting & fixing vetrified tile in floors of size 600mm x 600mm of approved make conforming to IS:13755 with application of polymer modified quick set cement based water resistant adhesive conforming IS:15477 of 3 mm thick bed and filling joints with white cement of approved quality including cost,conveyance of all materials, labour,Cess etc required for the work with royality , DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges of all materials required for the work complete in all respect as per specification and direction of Engineer-in-charge. |
| 37 | Providing 20 cm X 30 cm ceramic wall tiles fixing in dadoos skriting and rises of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including polishing complete including cost of pre cast tiles watering & curing for 7 days with cost conveyance royalty DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges of of all materials & labour with Cess etc required for the work complete in all respect and surface finishing with polishing materials as directed by the Engineer-in-charge. |
| 38 | Supplying & Providing of M.S window grill made out of M.S.Angle 25x25x3mm at the perigphery & M.S.Flat 25x6mm in the inner design conforming to IS 1977/95 with hold fast made out of MS angle as used in periphery as per the Design with cost, conveyance &or all materials & labour with T&P Cess in all respects as directed by Engineer-in-Charge. |
| 39 | Supplying & Providing of M.S. Pannelled door double leaved with MS frame over all size including frame made out of following materials conforming to relevant ISS frame: 30 x 30 x 5mm M.S.Angle door panel 1.0mm C.R.sheet panel stiffener covering width of leaf 19 x 5 mm flat 3 nos Hingessize 100 mm 3 nos bought out as per ISS hold fast 30x30x5mmMS angle 150mm length bifurcated at the tip 3 nos on one side handle 19x5mm M.S.Flat ,fabricated 2 Nos aldrop 2 nos bought out as per ISS Tower Bolt 2 nos bought out as per ISS including cost conveyance &of all materiasl& labour with T&P & Cess in all respectas per direction of Engineer In Charge. |
| 40 | Labour for fitting,fixing of M.S.window grill as per approved design including cost of screws with cost of all labour, T&P and Cess required for the work etc, complete excluding cost & conveyance of M.S.Door/Window in all respects as directed by Engineer-In-Charges. |
| 41 | Labour for fitting and fixing of M.S..Gate as per approved desing including cost of all materials and Cess etc complete as per specification and direction of Engineer-in-Charge |
| 42 | Painting two coats with any approved paint over a coat of primer to Iron work including cost of the paint, primer, sand papering polishing the surface with cost conveyance of all materials and labour required for the work with Cess etc complete as per the direction of the Engineer-In-Charge. |
| 43 | Distempering two coats to the wall surface with any approved shade over a coat of chalk wash including cost of distemper with conveyance royalities andof allmaterials and labour with T&P required for the work with Cess etc, complete in all respect as per direction of Engineer-in-charge. |
| 44 | Finishing wall surface two coats with any approved weather shield cement paint to outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials, labour and Cess required for the work complete in all respect as per the direction of Engineer-in-Charge. |
| 45 | Supplying,fitting,fixing of U PVC sliding window of approved make with 6mm thick black glass of approved quality with rubber beading including locking arrangement with cost of all materials including 6 mm thick cost of glass, labour, cess etc required for the work complete as per specification & direction of Engineer-in-charge. |
| 46 | Head roomRCC work of gradeM-20 having a minimum compressive strength in work text of 200Kg/cm2 in15cm cubesat 28daysafter mixing and tests conducted using 10mm to 20mm size (20mm not to exceed 25 percent) crusher black broken granite stone chips of approved quality and from approved quarry including hoisting,lowering and laying concrete by using vibrators watering and curing for four weeks centering and shuttering and finishing the exposed surface smooth to receive painting or white or clour wasing providing grooves or beads where neCessary including cost, conveyance,and royalties of all materials DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges,and labour & cess required for the work in all respect but execluding cost of reinforcement MS rods or tor steel and binding wires of 18 to 20 guage and labour charges etc, complete as per specification and direction of Engineer-in-charge. RCC Column |
| 47 | RCC Lintel |
| 48 | RCC Chajja |
| 49 | RCC Roof Beam |
| 50 | RCC Roof Slab |
| 51 | Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-fly ash-brick of 23cm X 11cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & labour & cess etc required for the work complete in all respect as per the direction of Engineer-in-charge. Superstructure |
| 52 | Straightening bent up or coiled rods cutting bending,binding, cranking hooking, welding jointing (if required) the M.S.Rods or Tor steel & binding wires and binding tying the grills hoisting lowering & placing in proper position as required for RCC works with cost conveyance of M.S. Rods or Tor steel & binding wires of 18 to 20 gauge and labour required for the work with Cess etc,complete in all floors (weight of binding wire will not be considered for payment and payment will be made on weight of M.S. Rods or Tor steel only) as per the direction of Engineer-in-Charge. |
| 53 | 12mm (1/2\\") thick cement plaster in C.M (1:6) finsihed smooth to out side brick walls after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and laobur required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges & Cess etc, complete in all floors as per direction of Engineer-in-charge. |
| 54 | 16mm (5/8\\") thick cement plaster in C.M. (1:6)finished smooth to inside surface of 9\\" thick brick wall after racking out the joints including watering & curing for seven days with cost and conveyance of all materials and labour required for the work with royalties, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, & Cess etc, complete in all floor as per direction of Engineer-in-charge. |
| 55 | Supplying & Providing of M.S Gate/grill made out of M.S.Angle 25x25x3mm at the perigphery & M.S.Flat 25x6mm in the inner design conforming to IS 1977/95 with hold fast made out of MS angle as used in periphery as per the Design with cost, conveyance &or all materials & labour with T&P Cess in all respects as directed by Engineer-in-Charge. |
| 56 | Painting two coats with any approved paint over a coat of primer to Iron work including cost of the paint, primer sand papering polishing the surface with cost conveyance of all materials and labour required for the work with Cess etc complete as per the direction of the Engineer-In-Charge. |
| 57 | Distempering two coats to the wall surface with any approved shade over a coat of chalk wash including cost of distemper with conveyance royalities andof allmaterials and labour with T&P required for the work with Cess etc, complete in all respect as per direction of Engineer-in-charge. |
| 58 | Finishing wall surface two coats with any approved weather shield cement paint to outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials, labour and Cess required for the work complete in all respect as per the direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jun 24, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender