|
| 1 | Supply cost of structural steel and rolled steel materials of Embedded parts consisting of seal beam, guide, track arrangement etc. suitable for 1 no of gate of vent size of 850mm x 850mm and maximum guide length of about 2000mm including 5% wastage material complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 2 | Fabrication cost of the above mentioned embedded parts with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables,complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 3 | Supply cost of structural steel and rolled steel materials of vertical gate consisting of skin plate, end vertical girders, horizontal girders, bronze pads, lifting brackets, seal arrangements etc. suitable for 1 no of gate of vent size of 850mm x 850mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 4 | Fabrication cost of the above mentioned gate leaf with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge.. |
| 5 | Supply cost of structural steel and rolled steel materials of Steel Hoist Bridge consisting of pedestal, gear box frame, main beams, cross beams etc. suitable for 1 no of gate of vent size of 850mm x 850mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 6 | Fabrication cost of the above mentioned steel hoist bridge with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 7 | Supply cost of structural steel and rolled steel materials of Restraining arrangement suitable for 1 no of gate of vent size of 850mm x 850mmcomplete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 8 | Fabrication cost of structural steel and rolled steel materials of Restraining arrangement suitable for 1 no of gate of vent size of 850mm x 850mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 9 | Erection, positioning, aligning, fixing, trial and commissioning including unloading and shifting upto location of all components 1st. Stage and 2nd. Stagge embedded parts, vertical gate leaf, steel hoist bridge assembly, with all accessories including machinery, labour, fixture, cutting, aligning, welding, cleaning, finishing complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 10 | 80mmX30mmX12mm |
| 11 | Side Seal Ø 32mm x10mm th- 80mm width Rubber seal IS : 11855 |
| 12 | Top Seal Ø 32mm x10mm th- 80mm width Rubber seal IS : 11856 |
| 13 | Bottom Rubber seal ( flat type bottom seal of size 75mm x 10mm) IS : 11855 |
| 14 | 2nd stage embedments, Ø16 Studs, bolts, nuts, washers & nut, bolt required for mounting rubber seal etc. |
| 15 | Nut type Screw Gear box assembly suitably square threaded for 80mm dia screw rod all inclusive of cost of material, cost of Thrust bearing, machining and assembly charges. |
| 16 | Anchor bars |
| 17 | Lifting pin dia 30mm & length 140mm - 45C8 of IS : 1570 (PART II) |
| 18 | Dia 80mm Screw Rod suitably square threaded to M78 x 10 all inclusive of cost of material, straightening and machining. |
| 19 | Dia 80mm plain Stem Rod all inclusive of cost of material, straightening etc. |
| 20 | Falnge coupling |
| 21 | Restraining arrangement bush ID 80mm thickness 10mm & length 200mm Aluminium bronze all inclusive of material, machining as required & as specified in drawing. |
| 22 | Restraining arrangement MS bush clamp ID 100mm length 200mm all inclusive of material, machining as required & as specified in drawing. |
| 23 | Lubricant like grease & mobil |
| 24 | Gate Lifting Handle |
| 25 | Painting cost of embedded parts including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 26 | Painting cost of gate leaf including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 27 | Painting cost of steel hoist bridge and restraining arrangement including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification with all lead and lift complete in all respects for smooth operation as per specification and direction of engineer-in-charge. |
| 28 | Cost of disassembly and refitting single stem nut-type gear box and screw rod after greasing & overhauling of the gear box including trial and commissioning |
| 29 | Construction of coffer dam by sand bag and dismantling after completion of work including cost of labour and sand bag. |
| 30 | Labour charges for dismentling, concrete cutting, chiseling to make the grove for emebeded parts, sill beam, hoist beam etc |
| 31 | 2nd stage concreeting |
| 32 | Cost of dismentling, concrete cutting, chiseling to easy the removal of emebeded parts, sill beam, hoist beam etc and removing the shutter & its allied component, hoisting system, nut type gear box etc |
| 33 | Cost of watch and ward, dewatering and vent cleaning |
| 34 | Cost of Transportation cost: Transportation of Bulky materials like Machineries, generators etc alongwith gate components & other accesories (per truck) Please Enable Macros to View BoQ information |