| 1 | Supply cost of structural steel and rolled steel materials of Restraining arrangement suitable for 1 no of gate of vent size 900mm x 1000mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 2 | Fabrication cost of structural steel and rolled steel materials of Restraining arrangement suitable for 1 no of gate of vent size 900mm x 1000mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 3 | Erection, positioning, aligning, fixing, trial and commissioning including unloading and shifting upto location of all components 1st. Stage and 2nd. Stagge embedded parts, vertical gate leaf, steel hoist bridge assembly, with all accessories including machinery, labour, fixture, cutting, aligning, welding, cleaning, finishing complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 4 | Nut,bolt and washers etc. for gear box and restrainging |
| 5 | Nut type Screw Gear box assembly suitably square threaded for 63mm dia screw rod all inclusive of cost of material, cost of Thrust bearing, machining and assembly charges. |
| 6 | Lifting pin dia 30mm & length 140mm - 45C8 of IS : 1570 (PART II) |
| 7 | Dia 63mm Screw Rod suitably square threaded to M62 x 9 all inclusive of cost of material, straightening and machining |
| 8 | Dia 63mm plain Stem Rod all inclusive of cost of material, straightening etc. |
| 9 | Restraining arrangement bush ID 63mm thickness 10mm & length 200mm Aluminium bronze all inclusive of material, machining as required & as specified in drawing. |
| 10 | Restraining arrangement MS bush clamp ID 85mm length 200mm all inclusive of material, machining as required & as specified in drawing. |
| 11 | Lubricant like grease & mobil |
| 12 | Gate Lifting Handle |
| 13 | Painting cost of embedded parts including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 14 | Painting cost of gate leaf including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 15 | Painting cost of steel hoist bridge and restraining arrangement including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification with all lead and lift complete in all respects for smooth operation as per specification and direction of engineer-in-charge. |
| 16 | Construction of coffer dam by sand bag and dismantling after completion of work including cost of labour and sand bag. |
| 17 | 2nd stage concreeting |
| 18 | Cost of dismentling, concrete cutting, chiseling to easy the removal of hoist beam etc and removing the shutter & its allied component, hoisting system, nut type gear box etc |
| 19 | Cost of watch and ward, dewatering and vent cleaning |
| 20 | Cost of Transportation cost: Transportation of Bulky materials like Machineries, generators etc alongwith gate components & other accesories (per truck) Please Enable Macros to View BoQ information |