|
| 1 | Supply cost of structural steel and rolled steel materials of Embedded parts consisting of seal beam, guide etc. suitable for 1 no of gate of vent size of 720mm x 950mm and maximum guide length of about 2200mm including 5% wastage material complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 2 | Fabrication cost of the above mentioned embedded parts with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables,complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 3 | Supply cost of structural steel and rolled steel materials of vertical gate consisting of skin plate, end vertical girders, horizontal girders, bronze pads, lifting brackets, seal arrangements etc. suitable 1 no of gate of vent size of 720mm x 950mmcomplete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 4 | Fabrication cost of the above mentioned gate leaf with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge.. |
| 5 | Supply cost of structural steel and rolled steel materials of Steel Hoist Bridge consisting of base plate, CI gear box plate, supporting beams etc. suitable for 1 no of gate of vent size of 720mm x 950mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 6 | Fabrication cost of the above mentioned steel hoist bridge with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 7 | Supply cost of structural steel and rolled steel materials of Restraining arrangement of pedestal, gear box frame, main beams, cross beams etc. complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 8 | Fabrication cost of structural steel and rolled steel materials of Restraining arrangement of pedestal, gear box frame, main beams, cross beams etc. complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 9 | Erection, positioning, aligning, fixing, trial and commissioning including unloading and shifting upto location of all components 1st. Stage and 2nd. Stagge embedded parts, vertical gate leaf, steel hoist bridge assembly, with all accessories including machinery, labour, fixture, cutting, aligning, welding, cleaning, finishing complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. |
| 10 | 80mmX30mmX12mm Bronze Pad |
| 11 | Side Seal Ø 32mm x10mm th- 80mm width Rubber seal IS : 11855 |
| 12 | Top Seal Ø 32mm x10mm th- 80mm width Rubber seal IS : 11856 |
| 13 | Bottom Rubber seal ( flat type bottom seal of size 75mm x 10mm) IS : 11855 |
| 14 | 2nd stage embedments, Ø16 Studs, bolts, nuts, washers & nut, bolt required for mounting rubber seal etc. |
| 15 | Nut type Screw Gear box assembly suitably square threaded for 63mm dia screw rod all inclusive of cost of material, cost of Thrust bearing, machining and assembly charges. |
| 16 | Anchor bars |
| 17 | Lifting pin dia 30mm & length 140mm - 45C8 of IS : 1570 (PART II) |
| 18 | Dia 63mm Screw Rod suitably square threaded to M62 x 9 all inclusive of cost of material, straightening and machining |
| 19 | Dia 63mm plain Stem Rod all inclusive of cost of material, straightening etc. |
| 20 | Flange coupling |
| 21 | Restraining arrangement bush ID 63mm thickness 10mm & length 200mm Aluminium bronze all inclusive of material, machining as required & as specified in drawing. |
| 22 | Restraining arrangement MS bush clamp ID 85mm length 200mm all inclusive of material, machining as required & as specified in drawing. |
| 23 | Lubricant like grease & mobil |
| 24 | Gate Lifting Handle |
| 25 | Painting cost of Embeded part, gate leaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint) & Painting of Hoisting Platform, Ladder & Railing (With one coat Zinc primer & 3 coats of Aluminium paint) |
| 26 | Construction of coffer dam by sand bag and dismantling after completion of work including cost of labour and sand bag. |
| 27 | Cost of dismentling, concrete cutting, chiseling to easy the removal of emebeded parts, sill beam, hoist beam etc and removing the shutter & its allied component, hoisting system, nut type gear box etc |
| 28 | Concreting |
| 29 | Cost of watch and ward, dewatering, vent and site cleaning |
| 30 | Cost of Transportation cost: Transportation of Bulky materials like Machineries, generators etc alongwith gate components & other accesories (per truck) Please Enable Macros to View BoQ information |