| 1 | SH:-I- MOEI & Fans, street/security lightingMaintenance of all electrical installation with fixtures, Circuit, Submain, Distribution boards, Main boards, Security lights and upkeeping of sub-station, providing emergency services in case of breakbown including DG Set operation and Operation of pump sets in round the clock shifts for water supply in Nirmal Chhaya complex by deputing staffs as per following on all days of month including Sunday & Holiday on monthly basis in General shift and as per Terms and Conditions attached:-Staff Details:- |
| 2 | Wireman Cum Pump Operator Shift A |
| 3 | Wireman Cum Pump Operator Shift B |
| 4 | Wireman Cum Pump Operator Shift C |
| 5 | Khallasi Shift A |
| 6 | Khallasi Shift B |
| 7 | Khallasi Shift C |
| 8 | Rewiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable and 1.5 sq.mm FRLS PVC insulated copper conductor single core cable as earth wire in existing surface/ recessed steel/PVC conduit including dismantling as required. |
| 9 | Group C |
| 10 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed steel conduit, with modular switch, modular plate, suitable Gl box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required. |
| 11 | Group C |
| 12 | Supplying and fixing 3mm thick phenolic laminated Sheet on the box/cover etc. as reqd. |
| 13 | SITC of 25 ltr capacity veritical type storge type automatic electric water heater (Geyser) ABS body comprising of enamel coated glass line tank enabling the tank to not get corroded complete with heating element 1.5 KW/2.0 KW, 5 star rating having , thermostate, indication lamp drain plug vent pipe pressure relief valve with suitable size 3 core flexible cable etc as reqd. suitable for working on 230 volt single phase 50 Hz A.C supply etc as required. |
| 14 | Supplying and replacement of following accessories of geyser connection testing etc as reqd. |
| 15 | Heating Element 2 KW |
| 16 | Thermostate |
| 17 | PVC Pipe Connection |
| 18 | Geyser Assembly |
| 19 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin 5/6 A & 15/16 A modular socket outlet and 15/16 A modular switch, connections etc. as required |
| 20 | Supplying, Installation, Testing and Commissioning of following size Exhaust Fan 900 RPM, Single Phase, Air delivery more than 1100 Cu. Mtr./ Hr. of following size in the existing opening, making good the damage, connection, testing,commissioning etc. as required. |
| 21 | 300 mm Sweep |
| 22 | 450 mm Sweep |
| 23 | Supplying, Installation, Testing and Commissioning of 450 mm Sweep plastic blade wall fan, minimum 1300rpm including fixing with dash fastener, connection with 1.5 sq.mm. FRLS PVC insulated wire complete etc. as reqd. |
| 24 | Servicing and complete overhauling of WTAC/Split units after dismantling from various locations, removing of dust from condenser coil, cooling coil and chasis wherever required complete cleaning of fin condenser coil with cleaning agent of superior quality, dismantling of blower motor (if required), washing etc after dismantling of condenser motor replacement of defective parts finally applying two coats of black synthetic paint of approved brand before fixing new 5 mm./6 mm. foam sheet with adhesive testing commissioning etc. complete as reqd. |
| 25 | Supplying and charging refrigerant gas (i.e. R-22/R410A) in the existing capacity AC cooling unit complete with leak detection, vacuumising & rectification the leakage, pressure testing i/c brazing, providing necessary copper piping & insulation, providing suitable capacity liquid line drier etc. testing, commissioing complete as required. |
| 26 | S/I/T/C of compressor of the following capacity in existing AC including connection with suitable size of suction & discharge copper pipe, copper stainer, capillary, nut bolts, connections, interconnections of the electrical wiring with suitable cables, checking of leakage, pressure testing with nitrogen gas for 24 hours, vacumising, charging with suitable refrigerant gas i/c brazing etc. as required i/c bye back credit of dismantle item. |
| 27 | 1.5 TR/2.0TR |
| 28 | Supplying & fixing following accessories in the existing Split / window Ac Unit etc Complete as required. |
| 29 | Capacitor 35/45 Micro Farad |
| 30 | Capacitor 50 - 60 Micro Farad |
| 31 | Fan Motor - ¼ To ⅛ HP (Copper) |
| 32 | 15-25 A, 3 Pin Plug Top ( AC Plug) |
| 33 | Condensing Coil |
| 34 | Cooling Coil ( Evaporative Coil ) |
| 35 | Supplying, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for VRV/VRF system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastometric nitrile rubber tubular sleeves sections of 19 mm thick insulation as given below for Suction and Liquid lines, all accessories as per specifications etc. as required : |
| 36 | 6.4 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm |
| 37 | 15.86 mm dia (OD) (Soft drawn) with tube thickness 1.2mm |
| 38 | SITC of 1 HP Mono Block pump with pipe size 25 X 25 mm, head range 6-45 mtr and discharge range 2800-880 LPH suitable for working on single phase, 50 Hz AC supply as required. |
| 39 | SH:-II-Sub Station MaintenanceMaintenance of all electrical installation with fixtures, and upkeeping of sub-station, providing emergency services in case of breakbown in round the clock shifts by deputing staffs as per following on all days of month including Sunday & Holiday on monthly basis in General shift and as per Terms and Conditions attached:-Staff Details:- |
| 40 | Substation Operator Shift A |
| 41 | Substation Operator Shift B |
| 42 | Substation Operator Shift C |
| 43 | Routine Maintenance of DG Set (1 No) & AMF control panel 500KVA. Maintenance i/c four major services of 1 no 500 KVA DG Sets along with AMF panel i/c emergency visit in case of any failure of D.G. Set complete and as per terms and condition attached. (For 1 Year).(12 visit required by authorised agency for DG Set) |
| 44 | Supply & Replacement of Following Items |
| 45 | Lubricant Oil |
| 46 | B Check Kit |
| 47 | Radiator Cleaning/Washing |
| 48 | Coolent |
| 49 | Supply of High speed desel for DG set |
| 50 | Maintenance & complete Servicing of HT Panel, 11 KV, 630 Amp HT breaker by opening HT panel and CT chamber, removing dust with vacuum cleaner, checking cleaning and decarbonising the contacts and joints of switch gear and CTs with CTC / CRC tightening of contacts and bus bars, CT and PT connections, cable end termination, replacement of burnt / heated thimbles / nuts / bolts, HT tapping and monoplast compound i/c testing complete as reqd. also Servicing of moving gear assembly of 630 Amps, 3 phase, 11 KV, 350 MVA capacity ACB by opening the required parts for servicing, checking, cleaning testing and rectification of defectss oiling, greasing moving gear assembly with CR-2 spray and cadmium solution i/c testing, commissioning in the HT ACB panel etc. complete as required |
| 51 | Servicing of 800-1600 Amp capacity 3 phase, 415 volts withdrawal type LT ACB complete with removal from panel board opening / dismantling of required parts for servicing, checking, cleaning, testing and rectification of defects, oiling and greasing of moving gear assembly and contacts with CR-2 spray and cadmium solution i/c reassembly, re-commissioning in LT panel complete as reqd. |
| 52 | Servicing, checking and cleaning of LT Panel board (without servicing of LT ACB) 3 phase 4 wire 50Hz Ac supply system comprising of outgoing feeders of rating various from 100 amp to 630 Amp including servicing of operating machanisum of all switch gears checking, cleaning and tighting of contacts of switch gear, tighting of cable end termination replacement of burnet / heated thimble / nut bolts PVC tapping etc as reqd. at site. |
| 53 | Dehydration of Transformer oil the reqd. BDB of 50 KV at standrad gap of 2.5 mm of electrodi/c testing oil with the help of suitable equipment before & after deydration at site complete as reqd.. |
| 54 | Supplying and filling silica gel in the exiting silica gel glass of transformer breather i.c cleaning etc. as reqd. |
| 55 | Disconnecting & checking complete servicing, cleaning of 500 KVA Oil cooled transformer the help of tripole and chain pully block & the help of heavy labour and replacement of HT taping ,bus bar ,maggering tightening of all power components, testing of transformer. Transformer checking and teighting HT and LT connection i/c replacement of broken window panes complete as reqd |
| 56 | SH:-III- Water Treatment Plant MaintenanceRoutine maintenance of 5 nos. of 250 LPH R.O. Plant System & 13 nos. of Water Coolers and 2 Nos of 100 LPH RO System i/c 8 mandatory Visit per month (cleaning of All Filters), attending complaints within 24 working hours and replacing the defective parts including Tee, Elbow, PVC pipe with complete overhauling and servicing etc. as required. |
| 57 | Supply of Following Items |
| 58 | RO membranes of Size 40\\"X40\\". |
| 59 | Anti Scalent Dosing Pump of 0-6 LPH at 3.5 kg pressure. |
| 60 | Electrical control panel with pressure switch of high and low level maintenance of Raw Water and High Pressure pump |
| 61 | Micron cartridge filter of size 20\\"x2.5\\" 5 Microns. |
| 62 | Bacteriological disinfection chemical. |
| 63 | Food grade Antiscalent chemical. |
| 64 | 0.5 HP Raw water Pump for RO Plant. |
| 65 | Supply, installation testing and commissioning of RO Membrane Housing 8\\" x 120\\" long with endcap. complete as reqd on existing skid i/c dismantling old/damage. |
| 66 | Refurbishing of media filter including change of Media etc. complete as required of size 13\\"x 54\\" in existing vessels etc. complete as reqd. |
| 67 | Refurbishing of carbon filter including change of carbon of suitable iodine value of size 13\\"x 54\\" in existing vessels.etc. complete as required. |
| 68 | Repair and service of high pressure pump three phase 1.5 HP to feed the ro membrane at pressure more then osmotic pressure, taking into considerations flux rate flow & recovery of stainless steel construction suitable for flow rate of 1500 lph at 30 m head complete as required |
| 69 | SITC of high pressure pump of 250 lph three phase 1.5 HP to feed the ro membrane at pressure more then osmotic pressure, taking into considerations flux rate flow & recovery of stainless steel construction suitable for flow rate of 1000 lph at 25 m head complete as required Please Enable Macros to View BoQ information |