Tender For . Under Rajiv Gandhi Ward No. 1, In Vivek Khand-2, Work Involving Paver Finishing And Shoulder Improvement For The Roads And All Connecting Lanes Specifically Covering The Stretches From House No. 2/156 To 2/16, 2/20 To 2/57, And 2/58 To 2
Tender Overview
Project Description
Tender for . Under Rajiv Gandhi Ward No. 1, In Vivek Khand-2, Work Involving Paver Finishing And Shoulder Improvement For The Roads And All Connecting Lanes Specifically Covering The Stretches From House No. 2/156 To 2/16, 2/20 To 2/57, And 2/58 To 2/30.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Jun-2026 | Date Extension | Date | 07-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing and Applying Tack coat with bitumen pressure distributor at of 0.35 kg per SQM on the prepared bituminous surface clean with mechanical broom. |
| 2 | Wet mix macadem (Plant Mix Method) . Providing & laying spreading & compacting graded stone agg. To wet mix macadem specification including premixing in mechanical mix plant carriage of mixed materials by tipper to site laying to uniform layers with paver in sub base/base coarse on well prepared surface & compacting with vibratory roller to achieve the desired density. |
| 3 | Providing and laying dence graded bituminus macadam with higher capacity HMP using crushed aggregates of specified grading premixxed with bituminus binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix work site, laying with a hydrostatics paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achived the desired compaction as per MORTH specifcation clause no-505 complete in all respects. |
| 4 | BC with Waste Plastic additive: Providing and laying Bituminous concrete using crushed stone aggregates of specifiled grading. premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equlped with electronic sensor to the requlred grade, evel and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-charge |
| 5 | P/L of hot thermoplastic compond 2.55 mm thick including reflectorising glass beads@ 250gms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC 3-2015 the finished surface to be level uniform & free from steaks and holes. |
| 6 | Dismantling of brick work manually /by mechanical means including stacking of sevicable materialswith 50 metreslead as per direction of Engineer-incharge in cement morter etc all complete………….. |
| 7 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil |
| 9 | E/W in Surface excavation by manual not exceeding 30 cm depth etc all complete |
| 10 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived fromnatural sources : 10 graded stone aggregate 40 mmnominal size derived from natural sources). |
| 11 | M 150 class B/win 1:4 with cement coarse sand mortor etc. all comp. |
| 12 | 12mm thick plaster in 1:6 cement C Sand mortar etc. all comp. |
| 13 | P/L in position 1:1.5:3 cement concrete for reinforced cement concrete work as per approved design mix as per direction of the engineer in charge clovert |
| 14 | MS Tor reinforcement with and all comp of work. |
| 15 | Centering and shuttering including strutting, propping etc. and removalof form for Suspended floors, roofs, landings, balconies and accessplatform |
| 16 | P/L CC 1:2:4 with cement sand & 20mm guage stone grit with all comp of work |
| 17 | Disposal of earth up tp 4km distance etc all complete. |
| 18 | P/L GSB as well graded uniform layer etc all complete. |
| 19 | S/L of 80mm thick rubber mold interlock tiles at sand base etc all complete. |
| 20 | Relaying Of Interlocking Tiles etc all complete. |
| 21 | S/F of innogration name board etc alll comp |
| 22 | P/L 300 mm dia. R.C.C. pipe |
| 23 | Deduction cost of old material etc all complete bricks |
| 24 | Deduction cost of old material etc all complete bats Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender