| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish to a distance n.exe 100 m complete all as specified and directed. |
| 2 | Dismantling of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in any mortar and removing rubbish upto a distanceto a distance n.exe 100 m complete all as specified and directed. |
| 3 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbishto a distance n.exe 100 m complete all as specified and directed. |
| 4 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish to a distance n.exe 100 m complete all as specified and directed. |
| 5 | M & L for glazed, coloured, ceramic, tiles of size (350mm x 250 mm/450mm x 350mm/300mmx450mm) x 6 to 7 mm thick, on vertical surfaces such as skirting, dados etc, including 10 mm thick bedding in cement mortor 1:4 and set & jointed in neat cement slurry & pointed in white or coloured cement to match with the shade of tiles complete all as specified and directed. |
| 6 | M & L for non-skid, ceramic, coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exc 0.11 sqm but n.exc 0.18 sqm, in floors etc, including 15 mm thick screed bed in cement mortor 1:6 and set & jointed in neat cement slurry and pointed in white or coloured cement to match with the shade of tiles complete all as specified and directed. |
| 7 | M&L for Vitrified ceramic coloured tiles 10 mm thick (Square/ Rectangular) polished, light shade, area of each tile exc 0.18 sqm but not exceeding 0.36 sqm, in floors by providing 3mm spacers and filling with epoxy grout matching color with tiles by applying masking tape etc., set and jointed in neat cement slurry and pointed in white or Coloured cement to match over and including 15mm thick screed bed in CM 1:6 complete all as specified and directed. |
| 8 | M & L for 18 to 20mm thick Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cills, cooking platforms and like bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including 15 mm thick screed bed in cement mortor 1:6 & cutting, polishing complete all as specified and directed. |
| 9 | M & L for 75 mm thick, plain cement concrete 1:3:6, type C-2 (using 40mm graded stone aggregate) as in plinth protection etc, finishing cement concrete surface even and smooth without using extra cement including making joints with bitumastic filing in proportion of bitumen and sand 1:2 complete all as specified and directed. |
| 10 | M & L for 40 mm thick, plain cement concrete 1:2:4, type B-1 (using 20 mm graded stone aggregate) as in floors laid in alternate bays and finishing the surfaces even & smooth with using extra cement complete all as specified and directed. |
| 11 | M&L for preparation of new platered surface of wall and applying two coats of oil bound distemper over a coat of primer including applying one or more coat of wall care putty to a smooth surface including making good any undulations on the surfaces complete all as specified and as directed. Note :- Painting work shall be carried out acoording to Smart Painting procedure mentioned in PS |
| 12 | Taking down, Resecuring or easing & adjusting and refixing in the same opeing shutter of any description exc 1 Sqm but n. exc 2 Sqm each including refixing builder's hardware as required and replacement of screws etc complete all as specified and directed. |
| 13 | Taking down, Resecuring or easing & adjusting and refixing in the same opeing shutter of any description exc 2.0 Sqm each including refixing builder's hardware as required and replacement of screws etc complete all as specified and directed. |
| 14 | Demolition of unreinforced Cement Concrete of any description and in floor and roofs (other than ground floor), and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M complete all as specified and directed. Please Enable Macros to View BoQ information |
| 15 | Demolition of unreinforced Cement Concrete of any description and in floor and roofs (other than ground floor), and disposal of unserviceable materials, debris and rubbish to a distance not exceeding 100 M complete all as specified and directed. Please Enable Macros to View BoQ information |