| 1 | E/work Excavation in foundation in Ordinary Soil DSR 2.8.1 |
| 2 | Concrete with 4.0 gauge brick blast, fine sand of 1.25 fineness modulus mortar in the proportion of 8:4:1 DSR 4.1.8 |
| 3 | Diluting and injecting chemical emulsion for post constructional anti termite treatment DSR 2.35.3 |
| 4 | Centering and shuttering including strutting propping etc and removal of form for DSR 5.9.2 |
| 5 | M 20 class RCC work with cement coarse sand 2.0 cm gauge stone ballast in the proportion of 1:1:5:3 in column DSR 5.2.2 |
| 6 | Mild Steel iron work in plain work such as in DSR 5.22.6 |
| 7 | Class 150 sub class A brick work in 1:4 cement and coarse sand morter in foundation & plinth DSR 6.1.1 |
| 8 | Class 150 sub class A brick work in 1:3 cement and coarse sand morter in super structure DSR 6.1.1+6.12.1 |
| 9 | Earth filling DSR 2.27 |
| 10 | Mild Steel iron work DSR 10.16.3 |
| 11 | Providing & fixing DSR 12.50 |
| 12 | P/F angle iron frames DSR 10.31 |
| 13 | P/F 30mm thick DSR 9.21.2 |
| 14 | P/F glaze DSR 9.9.1.2 |
| 15 | S/F of Angel iron window and ventilator grill work all complete of job DSR 10.1 |
| 16 | Neat Cement punning DSR 13.18 |
| 17 | 12mm thick outer side plaster in 1:4 with cement & course sand DSR 13.4.1 |
| 18 | Providing PVC Sheet wall Panelling AR |
| 19 | 75 mm overall thickness GYPSUM BOARD ceiling work including complete nessasory items GI frames skrew etc DSR 9.105.1 |
| 20 | 20mm Cement plaster in 1:3 with cement & course sand finished with a floating coat of neat cement DSR 13.9.1 |
| 21 | P/L Vitrified tiles in floor in 600*600 size in skerting and dado laid with 1:4 cement and approved coarse sand mortar DSR 11.41.2 |
| 22 | P/L Vitrified tiles in floor in 600*600 size in skerting and dado laid with 1:4 cement and approved coarse sand mortar DSR 11.41.2 |
| 23 | Chequrezed and terrzo tiles DSR 11.9.1 |
| 24 | Providing and applying DSR 13.26 |
| 25 | Finishing wall with acrylic smooth paint of required DSR 13.46 |
| 26 | 15mm thick fully perforted light weight calcium silicate pannel |
| 27 | Painting of D/W DSR 13.57 |
| 28 | Add Extra Architeutural & Designing Sanitation Work@ 10% |
| 29 | Add Internal electrification work @10% |
| 30 | Add External electrification work @5% |
| 31 | Add GST 18% Please Enable Macros to View BoQ information |