|
| 1 | SOFA SET 04 SEATER WITH CUSHION:- FD-281 Removing of old unserviceable arm rest from exiting sofa set 04 seater and supplying and fixing new 1st class hard wood teak arm rest to sofa set 04 seater complete as shown on drawing. |
| 2 | All as per item No 1 here-in-before but fornt/ back rail of sofa set 04 seater. |
| 3 | All as per item No. 1 here-in-before but side rail of sofa set 04 seater. |
| 4 | All as per item No. 1 here-in-before but legs of sofa set 04 seater. |
| 5 | All as per item No. 1 here-in-before but wooden battens of sofa set 04 seater. |
| 6 | S&F foam cushion of size 22\\" x 21\\",100 mm thick 40 density duly make of cusion. |
| 7 | Removal of tapestry cloth from existing foam cushion of seat/ back of Sofa set 04 seater and providing new cover of foam cushion (tapesty cloth DCM/ Handloom long cloth) of approved shade of Indian make of rate not less than Rs. 350/- per meter duly stitched and fixing the same all as per drawing and as directed. The cover shall be removable duly provided with ZIP as directed by Engr-in-charge (Sample of tapestry cloth shall be approved by the GE). |
| 8 | TABLE 900 x 600 mm with / without drawer: FD-223/224/283& 284 Removing of old unserviceable top from Table and supply and fixing new top made out of 18 mm thick MDF board duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and or directed |
| 9 | All as per item No 8 here-in-before but leg made out of 1st class hard wood |
| 10 | All as 9 above but replacement of long rail |
| 11 | All as 9 above but replacement of short rail |
| 12 | All as 9 above but replacement of drawer with fittings |
| 13 | All as 9 above but replacement of bottom centre stiffener |
| 14 | All as 9 above but replacement of bottom side stiffner |
| 15 | All as 9 above but replacement of bracket as directed by Engr-in-charge. |
| 16 | S & F new hard PVC shoe/ ring of superior quality with suitable screws for fixing complete all as shown on drg and as directed by Engr-in-charge. |
| 17 | Repair, minor work like broken/ losse joints of table 900x600cm |
| 18 | TABLE DRESSING GENTS WITH MIRROR:FD-230 Removing of old unserviceable looking mirror from table dressing gents with mirror and supplying and fixing new looking mirror of size 750 x 450 x 5mm thick of modi-gurard duly fixed in and including frame of teak wood and polishing complete in all respect to fix on wall all as shown on drawing. |
| 19 | Removing old broken/unserviceable sunmica from the top of table dressing gents and S&F new 1.5 mm thick sunmica of best quality fixed with fevicoal adhesive as per shape and size shown in drawing complete all as specified and directed. |
| 20 | Removing old broken/unserviceable sunmica from the drawer of table dressing gents and S&F new 1.5 mm thick sunmica of best quality fixed with fevicoal adhesive as per shape and size shown in drawing complete all as specified and directed. |
| 21 | Removing old broken/unserviceable knob from table dressing gents and S&F new 40 mm size CP brass knob as per sample, shape and size shown in drawing complete all as specified and directed. |
| 22 | Repair, minor work like broken/ losse joints of table dressing gents |
| 23 | TABLE WRITING:FD-33, FD-275 Removing of old unserviceable top from Table Writing and supply and fixing new top made out of 18 mm thick MDF board duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and or directed |
| 24 | Replacement of Legs of table to be made out of Ist class Teak wood well seasoned and fixed as per drg. |
| 25 | Replacement of Stiffener of table, to be made out of Ist class Teak wood well seasoned |
| 26 | Replacement of bracket table to be made out of Ist class Teak wood well seasoned |
| 27 | Replacement of Door Shutters to be made out of 17/18 mm thick prelaminated MDF Board covered with all round 4 mm thick teak wood beading and duly fixed with knobs and piano type hinges4 mm thick with 4 lever 40 mm brass lock. |
| 28 | Replacement of back of table writing which shall be made out of 06 mm thick commercial ply wood ISI marked |
| 29 | Replacement of Drawers of table writing to be made out of 18mm thick prelaminated MDF Board exterior grade ISI marked and 4 mm thick beading teak wood to be fixed and provided one knob. |
| 30 | Replacement of Hard PVC shoes of approved quality shall be fixed to the bottom of the legs with 20mm long screw wood steel ISI marked. |
| 31 | Repair, minor work like broken/ losse joints of Table Writing |
| 32 | TABLE CENTRE Two Tier : FD-274 Removing of old unserviceable top from table centre and S&F new top made out of 17/18 mm thick MDF Board duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and as directed. |
| 33 | Replacement of old unserviceable leg from existing table centre and S&F the same size leg made out of Ist class hard wood teak to table centre duly french polished complete all as per drawing, as specified and as directed |
| 34 | All as per srl item No 33 here-in-before but long rail complete all as per drawing, as specified and as directed |
| 35 | All as per srl item No 33 here-in-before but short rail complete all as per drawing, as specified and as directed |
| 36 | All as per srl item No 33 here-in-before but stiffener of table centre complete all as per drawing, as specified and as directed |
| 37 | All as per srl item No 33 here-in-before but bracket of table centre complete all as per drawing, as specified and as directed |
| 38 | All as per srl item No 33 here-in-before but Hard Rubber ring of table centre complete all as per drawing, as specified and as directed |
| 39 | All as per srl item No 33 here-in-before but Bottom Rail of table centre complete all as per drawing, as specified and as directed |
| 40 | Repair, minor work like broken/ losse joints of Table centre two tier |
| 41 | TABLE 900 x 900x760mm: FD-88 Removing of old unserviceable top from Table and supply and fixing new top made out of 18 mm thick MDF board duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and or directed |
| 42 | All as per item No 41 here-in-before but leg made out of 1st class hard wood |
| 43 | All as per item No 41 here-in-before but replacement of long rail |
| 44 | All as per item No 41 here-in-before but replacement of short rail |
| 45 | All as per item No 41 here-in-before but replacement of bottom centre stiffener |
| 46 | All as per item No 41 here-in-before but replacement of bottom side stiffner |
| 47 | All as per item No 41 here-in-before but replacement of bracket |
| 48 | S & F new hard PVC shoe/ ring of superior quality with suitable screws for fixing complete all as shown on drg and as directed by Engr-in-charge. |
| 49 | Repair, minor work like broken/ losse joints of table 900x900x760mm |
| 50 | TABLE 600 x 600x760mm:FD Removing of old unserviceable top from Table and supply and fixing new top made out of 18 mm thick MDF board duly post formed, colour / shade as approved by GE. 2 mm thick PVC edge-binding of Make-Rehau/Kinex shall be provided with mechanical fixing at two open end side of top complete all as per drawing, as specified and or directed |
| 51 | All as per item No 50 here-in-before but leg made out of 1st class hard wood |
| 52 | All as per item No 50 here-in-before but replacement of long rail |
| 53 | All as per item No 50 here-in-before but replacement of short rail |
| 54 | All as per item No 50 here-in-before but replacement of bottom centre stiffener |
| 55 | All as per item No 51 here-in-before but replacement of bottom side stiffner |
| 56 | All as per item No 51 here-in-before but replacement of bracket |
| 57 | S & F new hard PVC shoe/ ring of superior quality with suitable screws for fixing complete all as shown on drg and as directed by Engr-in-charge. |
| 58 | Repair, minor work like broken/ losse joints of table 600x600x760mm |
| 59 | TABLE DRESSING LADIES WITH STOOLFD/E6/MAP-II/07 Removing of old unserviceable looking mirror from table dressing ladies and supplying and fixing new looking mirror of size 1200 x 450 x 5mm fixed in and including frame of teak wood and polishing complete in all respect to fix on wall all as shown on drawing. |
| 60 | Drawer made out of 18mm thick exterior grade MDF Board teak faced with 0.4mm thick teak wood beading wherever required to the the drawer all as shown on drawing and as directed |
| 61 | All as per item No 60 here-in-before but side |
| 62 | All as per sel no 60 here in before but door shutter |
| 63 | All as per sel no 60 here in before but drawer channel |
| 64 | All as per sel no 60 here in before but back ply |
| 65 | S&F foam cushion of Stool of table dressing ladies thick 40 density duly,all as per drawing |
| 66 | Removal of tapestry cloth from existing foam cushion of seat Stool of table dressing ladies and providing new cover of foam cushion (tapesty cloth DCM/ Handloom long cloth) of approved shade of Indian make of rate not less than Rs. 350/- per meter duly stitched and fixing the same all as per drawing and as directed. The cover shall be removable duly provided with ZIP as directed by Engr-in-charge (Sample of tapestry cloth shall be approved by the GE) with superior quality rexine / cloth, fixed with removable 12mm BWR grade commercial ply wood complete all as per drawing, as specified and as directed |
| 67 | CHARPOY WITH HARD TOP :FD/MAP-II/01 Preparation of surfaces by application of paint remover and applying two coats of synthetic enamel Black/Brown paint after application of one coat of red oxide steel primer and Removing of old and unserviceable Plytop from Charpoy with hard top and S&F of new 12 mm thick plywood of suitable size, ISI marked, BWR phenol bonded plywood with unpolished edging of approved quality all as shown on drawing and as directed. |
| 68 | Welding to broken joints of Charpoy with hard top all as directed . |
| 69 | S&F in replacement hard rubber shoes at the bottom of Charpoy with hard top all as shown on drg. |
| 70 | S&F in replacement bolt of Charpoy with hard top all as shown on drg. |
| 71 | CHAIR VERANDAH (MAP) :FD/MAP-II/06 & FD/MAP-II/15 Cutting and removing of old / unsv PVC Sheet from Chair verandah, preparation of surfaces by application of paint remover and applying two coats of synthetic enamel white paint after application of one coat of red oxide steel primer and re-canning with cane plastic 04 mm wide of approved quality in Godrej Pattern complete all as shown on drawing and as directed by Engr-in-Charge. |
| 72 | S&F in replacement PVC shoes to Chair Verandah all as shown on drg. |
| 73 | CHAIR VERANDAH :FD-359 & 256 Cutting and removing of old cane from Chair verandah, preparation of surfaces by application of paint remover and applying two coats of synthetic enamel white paint after application of one coat of red oxide steel primer and re-canning with cane plastic 04 mm wide of approved quality in Godrej Pattern complete all as shown on drawing and as directed by Engr-in-Charge. |
| 74 | Welding to broken joints of Chair varandah all as directed. |
| 75 | S&F in replacement PVC shoes to Chair Verandah all as shown on drg. |
| 76 | Charpoy GI Pipe (Drg No-FD-220) or similar FD-220Selecting the serviceable furniture from the unserviceable one at BSO (S) furniture yard and segragating. Removing the old unserviceable / damaged part from the charpoy GI pipe M&L to replace the same with new parts duly match with the existing parts and completing finishing the same with size and shape all as specified, shown on drg and as directed by Engr-in-Charge |
| 77 | Removal and replacement of broken or unserviceable long rail of 32 mm medium grade GI pipe of as per drg compete all as specified and directed. |
| 78 | Cutting of long Rail obtained from Sl No 2 and convert into short rail including threading at both ends as required and fixing in repair of charpoy compete all as specified and directed. |
| 79 | Cutting of short rails and converting into legs including threading at one end as required and providing with 3 mm base plate duly welded and fixing in repairs of charpoy complete all as specifed and directed. |
| 80 | S & F of required MS checknut as per drg |
| 81 | S & F by replacement of 3 way elbow as per drg and required |
| 82 | Removing of old broken middle rail of 25 mm dia GI pipe of and provision of new two as specified by Engr-in-Charge and fixing the same by welding in the middle of both the long rail. |
| 83 | Removing of old unserviceable 12 mm thick ply from top of the charpoy GI pipe and providing 12 mm commercial ply wood BWR grade ISI marked conforming to IS 303 of size 1980 x 910 mm. Plywood shall be fixed on the top of Charpoy frame with suitable six numbers headless machine nuts and bolts in sespective perforated holes complete specified and directed. |
| 84 | Making of new hole in GI pipe complete as per drg, specified by Engr-in-Charge. |
| 85 | Welding to broken joints of charpoy GI Plytop all as directed . |
| 86 | CHAIR CB STEEL WITH AND WITHOUT ARMS: FD-75 (M) Welding of broken parts of chair steel with 25mm round MS conduite pipe of 1.6 guage as per existing shape & size and applying powder coating after pretreatment of steel surfaces by degreasing, derusting, water rinse, phosphating and passivating as per the colour/ shade approved by GE. |
| 87 | M&L for removal of unsv seat & back of chair, S&F of seat and back of chair with new seat of 12mm thick BWR plywood (ISI marked) covered with 75mm thick U foam and best quality of tapestry cloth irrespective of what is shown on drg. The back shall be of 12 mm thick BWR plywood (ISI marked) fixed to frame with screw and covered with 50 mm thick U foam over shape and best quality of tapestry cloth. Seat and back fixed on frame with screw and including all minor repairs with welding to steel frame etc complete all as specified and as directed by Engineer-in-Charge. (Note :- The tapestry cloth of rate ranging between Rs. 150/- to Rs. 175/- per meter and as per sample approved by GE.) |
| 88 | M&L for removal of unsv arm rest of chair and S&F of new arm rest of black integral skin polyurethane reinforced with MS insert and shall be scratch and weather resistant all as directed by Engr-in-Charge / GE. |
| 89 | S&F in replacement hard rubber shoes at the bottom of Chair CB steel all as shown on drg. |
| 90 | S&F of each chair have 5x MS flat strip 19x5 mm (2x back, 3x bottom) and provision specified by Engr-in-Charge. |
| 91 | Polishing :M & L for preparation of old surfaces by grinding through grinding machine as per requirement / as directed by Engr -in-charge including filling of cavities and french polishing with two coats of polish of approved make with glossy finish after applying putty/ filler/ sealer all as specified and as directed by Engir-in-charge. and 1x Mazdoor per day will be provided by the contractor for stacking and re-arrangement of all repaired/ repairable for the following furniture:- |
| 92 | Sofa Set 04 seater with cushion FD-281 |
| 93 | Table 900 x 600 mm with / without drawer FD-223/224/283& 284 |
| 94 | Table dressing Ladies with Stool FD-230 |
| 95 | Table dressing Gents with mirror FD/E6/MAP-II/07 |
| 96 | Table Writing FD-33, FD-275 |
| 97 | Table Centre Two Tier FD-33, FD-275 |
| 98 | Chair Dining with Long Back TP |
| 99 | Table 900x900x760mm TP FD_88 |
| 100 | Table 600x600x760mm FD-DB Please Enable Macros to View BoQ information |