Power Boards / Undertakings / PSU Closing in 7 days TDR #56130790

Tender For Drawing 11Kv Covered Conductor From Thekkekurisu-Ambazhakkad-Ppk Transformer[ [Cw-5648-202526-55]] At Electrical Section Annamanada

Issued by Boards / Undertakings / PSU · Thrissur, Kerala
Tender Value
6.08 Lakhs
Estimated cost
Bid Submission
07 Sep 2026
7 days left
EMD
15300
Bank guarantee accepted
Document Fee
1534
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thrissur → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Drawing 11Kv Covered Conductor From Thekkekurisu-Ambazhakkad-Ppk Transformer[ [Cw-5648-202526-55]] At Electrical Section Annamanada

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 23-Jun-2026 Fee Corrigendum Fee 06-Jul-2026
2 07-Jul-2026 Date extension 4 Corrigendum Date 25-Jul-2026
3 23-Jun-2026 Fee Corrigendum Fee 25-Jul-2026
4 25-Jul-2026 dateext2corrigendum Date 05-Aug-2026
5 23-Jun-2026 Fee Corrigendum Fee 05-Aug-2026
6 23-Jun-2026 Fee Corrigendum Fee 13-Aug-2026
7 05-Aug-2026 DateExt Corrigendum Date 13-Aug-2026
8 13-Aug-2026 DateExt2corrigendum Date 20-Aug-2026
9 23-Jun-2026 Fee Corrigendum Fee 20-Aug-2026
10 23-Jun-2026 Fee Corrigendum Fee 07-Sep-2026
11 22-Aug-2026 Date extension corrigendum Date 07-Sep-2026

BOQ

Name of Work:- Drawing 11KV Covered Conductor from Thekkekurisu-Ambazhakkad-PPK Transformer[ [CW-5648-202526-55]] at Electrical Section Annamanada
Sl. No. Item Description
1Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the same.
2Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides.
3Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole.
4Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
5Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.
6Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
7Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
8Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable
9Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
10Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store.
11Dismantling one Anchor clamp /dead end clamp from 11 KV ABC
12Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
13Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
14Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole.
15Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
16Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
17Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
18Dismantling (without damage) one AB switch from existing structure and bringing back to section store.
19Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
20Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
21Drilling hole of various sizes on existing Channel/Cross Arm.
22Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
23Fitting one Additional V cross arm in existing single pole including conveyance of materials.
24Providing additional jumper from AB to line
25Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
26Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
27Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
28Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
29Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
30Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
31Additional rate for providing one HT Pin with insulator, complete on any type of HT pole.
32Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
33Redoing three phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire, Fuse unit etc., changing Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at various location.
34Redoing single phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire, Fuse unit etc., changing Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at various location.
35Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials.
36Reshackling one span LT OH Additional conductor including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials complete.
37Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials.
38Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
39Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
40Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
41Dismantling one section fuse from structure and bringing back to section store.
42Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.
43Additional rate for providing one F top bracket complete, on any type of HT pole.
44Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.
45Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.
46Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.
47Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials.
48Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works.
49Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare insulated Messenger
50Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.
51Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles.
52Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles.
53Fitting one set (3No.) 11kV LA and giving connections excluding earthing.
54Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
55Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
56Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil.
57Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
58Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly.
59Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.
60Erection of suspension clamp for 11KV ABC of any size
61Dismantling one suspension clamp from 11 KV ABC
62Stringing of 11 kV Aerial bunched cable of size 3 x 150+ 1 x 120 sqmm with bare/insulated Messenger through existing poles
63Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers.
64Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors
65Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.
66Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
67Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the bunched cable of size 3 x 150+ 1 x 120 sqmm with bare/insulated Messenger through existing poles
68Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56130790
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 6.08 Lakhs
LAST DATE 07-09-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Drawing 11Kv Covered Conductor From Thekkekurisu-Ambazhakkad-Ppk Transformer[ [Cw-5648-202526-55]] At Electrical Section Annamanada
Basic Detail
Tender No TENDER/2026-27/5154/59 dtd 23.06.2026
Bidding Type Tender
Location
City Thrissur
State Kerala
Key Dates
Publish Date 23 Jun 2026
Submission Date 07 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value 6.08 Lakhs
Tender Fee 1534
EMD 15300
Exemption Not Available
Document List
03b6c469-173b-459a-8524-dfae86b93155.html
Bid_Form_and_Questionnaire.pdf
BOQ_1449207.xls
GCC.pdf
Tendernotice_1.pdf
Tender_Documents_ANNAMANADA.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 06, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 25, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 25, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 05, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 05, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 13, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 20, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 20, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 07, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 7 days
Sep 07, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 7 days
Sep 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
html

03b6c469-173b-459a-8524-dfae86b93155.html

pdf

Bid_Form_and_Questionnaire.pdf

xls

BOQ_1449207.xls

pdf

GCC.pdf

pdf

Tendernotice_1.pdf

pdf

Tender_Documents_ANNAMANADA.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders