|
| 1 | Round the clock day to day Operation and Preventive/Breakdown maintenance of complete IRP installed at Central IRP, IRP installed at IAD Colony and IRP installed at Northern of this airport (except replacement of filtering media), Centrifugal Pump-Motor sets, control panel, relevant Bore-well pumps (21 nos.) & allied E & M installations as per recommendation of the manufacturer & instructions of Engineer-in-Charge and as per Technical Specification & Special Condition of Contract etc. as required.1st Year | Round the clock day to day Operation and Preventive/Breakdown maintenance of complete IRP installed at Central IRP, IRP installed at IAD Colony and IRP installed at Northern of this airport (except replacement of filtering media), Centrifugal Pump-Motor sets, control panel, relevant Bore-well pumps (21 nos.) & allied E & M installations as per recommendation of the manufacturer & instructions of Engineer-in-Charge and as per Technical Specification & Special Condition of Contract etc. as required.1st Year |
| 2 | Round the clock day to day Operation and Preventive/Breakdown maintenance of complete IRP installed at Central IRP, IRP installed at IAD Colony and IRP installed at Northern of this airport (except replacement of filtering media), Centrifugal Pump-Motor sets, control panel, relevant Bore-well pumps (21 nos.) & allied E & M installations as per recommendation of the manufacturer & instructions of Engineer-in-Charge and as per Technical Specification & Special Condition of Contract etc. as required.2nd Year | Round the clock day to day Operation and Preventive/Breakdown maintenance of complete IRP installed at Central IRP, IRP installed at IAD Colony and IRP installed at Northern of this airport (except replacement of filtering media), Centrifugal Pump-Motor sets, control panel, relevant Bore-well pumps (21 nos.) & allied E & M installations as per recommendation of the manufacturer & instructions of Engineer-in-Charge and as per Technical Specification & Special Condition of Contract etc. as required.2nd Year |
| 3 | Replacement of filter media including Supply of media materials (Sand, Gravels, Activated Carbon, MnO2 etc. of required sizes with minimum quantites as follows) and including cleaning of tanks, minor welding/repairing of tanks, replacement of stainer, gasket and bolts etc. with two coats anti corrosive painting at inside wall complete as required for each unit of Central IRP containing 1 no.Oxidization Chamber, 1 no. PSF and 1 no. ACF.A) OXIDIZATION CHAMBERi) MnO2- 500KgB) PRESSURE SAND FILTERi) GRAVELS- 3-6 -450Kgii) GRAVELS- 6-12 -450Kgiii) GRAVELS- 12-25 -900Kgiv) GRAVELS- 25-40 -600Kgv) SAND- 16-32 -5200KgC) ACTIVATED CARBON FILTERi) GRAVELS- 3-6 -450Kgii) GRAVELS- 6-12 -450Kgiii) GRAVELS- 12-25 -900Kgiv) GRAVELS- 25-40 -600Kgv) ACTIVATED CARBON (ID VALUE 450) -1100Kg | Replacement of filter media including Supply of media materials (Sand, Gravels, Activated Carbon, MnO2 etc. of required sizes with minimum quantites as follows) and including cleaning of tanks, minor welding/repairing of tanks, replacement of stainer, gasket and bolts etc. with two coats anti corrosive painting at inside wall complete as required for each unit of Central IRP containing 1 no.Oxidization Chamber, 1 no. PSF and 1 no. ACF.A) OXIDIZATION CHAMBERi) MnO2- 500KgB) PRESSURE SAND FILTERi) GRAVELS- 3-6 -450Kgii) GRAVELS- 6-12 -450Kgiii) GRAVELS- 12-25 -900Kgiv) GRAVELS- 25-40 -600Kgv) SAND- 16-32 -5200KgC) ACTIVATED CARBON FILTERi) GRAVELS- 3-6 -450Kgii) GRAVELS- 6-12 -450Kgiii) GRAVELS- 12-25 -900Kgiv) GRAVELS- 25-40 -600Kgv) ACTIVATED CARBON (ID VALUE 450) -1100Kg |
| 4 | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.a) 15 HP to 30 HP | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.a) 15 HP to 30 HP |
| 5 | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.b) 10 HP to 12.5 HP | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.b) 10 HP to 12.5 HP |
| 6 | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.c) 1 HP to 7.5 HP | Lowering and lifting of following capacity submersible pump motors set from existing deep tube well (borewell) i/c dismentalling and reinstalltion of the same etc. complete . as required.c) 1 HP to 7.5 HP |
| 7 | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing, commissioning etc. as reqd.b) 15 HP to 30HP | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing, commissioning etc. as reqd.b) 15 HP to 30HP |
| 8 | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing, commissioning etc. as reqd.e) 10 HP to 12.5 HP | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing, commissioning etc. as reqd.e) 10 HP to 12.5 HP |
| 9 | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting, testing commissioning etc. as reqd.i) 1 HP to 7.5 HP | Dismantling the damaged Sub-mersible/borewell pump-motor and Complete rewinding and overhauling of following rated Sub-mersible pump motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting, testing commissioning etc. as reqd.i) 1 HP to 7.5 HP |
| 10 | Lowering and lifting of following capacity submersible type sewarage/dewatering pump motors set i/c dismentalling and reinstalltion of the same etc. complete . as required near Colony IRP and Solar Planti) 5 HP to 12.5 HP | Lowering and lifting of following capacity submersible type sewarage/dewatering pump motors set i/c dismentalling and reinstalltion of the same etc. complete . as required near Colony IRP and Solar Planti) 5 HP to 12.5 HP |
| 11 | Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated submersible type sewarage/dewatering pump-motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting, testing commissioning etc. as reqd. near Colony IRP and Solar Planti) 5 HP to 12.5 HP | Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated submersible type sewarage/dewatering pump-motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting, testing commissioning etc. as reqd. near Colony IRP and Solar Planti) 5 HP to 12.5 HP |
| 12 | Complete repairing of defective Three Phase Vertical Pump with induction motor by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.) and lathe works as per site requirement and condition etc. for following capacity pump motor sets i/c less credit for the burnt copper.a) 2 HP to 5 HP | Complete repairing of defective Three Phase Vertical Pump with induction motor by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.) and lathe works as per site requirement and condition etc. for following capacity pump motor sets i/c less credit for the burnt copper.a) 2 HP to 5 HP |
| 13 | Complete repairing of defective Three Phase Agitator for brine tank for salt mixing installed at IAD Colony IRP with induction motor by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (gear arrangements, bearing, shaft, blade) and lathe works as per site requirement and condition etc. for following capacity i/c less credit for the burnt copper.a) 1 HP | Complete repairing of defective Three Phase Agitator for brine tank for salt mixing installed at IAD Colony IRP with induction motor by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (gear arrangements, bearing, shaft, blade) and lathe works as per site requirement and condition etc. for following capacity i/c less credit for the burnt copper.a) 1 HP |
| 14 | Complete repairing of defective Single Phase Pump motor set for priming by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.) and lathe works as per site requirement and condition etc. for following capacity pump motor sets i/c less credit for the burnt copper.a) 0.5 HP to 2 HP | Complete repairing of defective Single Phase Pump motor set for priming by changing bearing and other seals backing, fitting etc., by providing new super enamel coated copper wire with heat varnishing if reqd., providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.) and lathe works as per site requirement and condition etc. for following capacity pump motor sets i/c less credit for the burnt copper.a) 0.5 HP to 2 HP |
| 15 | Complete re-winding/repairing of burnt out 3 Phase 30/40 HP Pump induction motor by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals backing, fitting etc. as reqd. i/c less credit for the burnt copper. | Complete re-winding/repairing of burnt out 3 Phase 30/40 HP Pump induction motor by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals backing, fitting etc. as reqd. i/c less credit for the burnt copper. |
| 16 | Complete major overhauling/servicing of 3 Phase 30/40 HP centrifugal pump meant for water delivery by providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.), remetaling, machining, balancing of impeller, shaft, housing cover and lathe works as per site requirement and condition etc.complete as required. | Complete major overhauling/servicing of 3 Phase 30/40 HP centrifugal pump meant for water delivery by providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.), remetaling, machining, balancing of impeller, shaft, housing cover and lathe works as per site requirement and condition etc.complete as required. |
| 17 | Complete re-winding of burnt out following capacity motor suitable for Air Blower meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.a) 2HP to 5HP | Complete re-winding of burnt out following capacity motor suitable for Air Blower meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.a) 2HP to 5HP |
| 18 | Complete major overhauling/servicing of Air Blower Pump meant for providing air pressure by providing/replacement of necessary spares (bearing, seals, Rotor, Gear oil, driven belt etc.) and lathe works as per site requirement and condition etc.complete as required.a) 0.2 kg/cm2 to 0.5 kg/cm2 | Complete major overhauling/servicing of Air Blower Pump meant for providing air pressure by providing/replacement of necessary spares (bearing, seals, Rotor, Gear oil, driven belt etc.) and lathe works as per site requirement and condition etc.complete as required.a) 0.2 kg/cm2 to 0.5 kg/cm2 |
| 19 | Complete re-winding of burnt out following capacity motor suitable for Air Compressor meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.a) 5 HP to 11 HP | Complete re-winding of burnt out following capacity motor suitable for Air Compressor meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.a) 5 HP to 11 HP |
| 20 | Complete major overhauling/servicing of 3 Phase Air compressor Pump Motor set meant for providing air pressure by providing/replacement of necessary spares (bearing, seals, Rotor, Gear oil, driven belt etc.) and lathe works as per site requirement and condition etc.complete as required. | Complete major overhauling/servicing of 3 Phase Air compressor Pump Motor set meant for providing air pressure by providing/replacement of necessary spares (bearing, seals, Rotor, Gear oil, driven belt etc.) and lathe works as per site requirement and condition etc.complete as required. |
| 21 | Complete re-winding/repairing of burnt out 3 Phase 15 HP Pump induction motor by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals backing, fitting etc. as reqd. i/c less credit for the burnt copper. | Complete re-winding/repairing of burnt out 3 Phase 15 HP Pump induction motor by providing new super enamel coated copper wire with heat varnishing, changing bearing and other seals backing, fitting etc. as reqd. i/c less credit for the burnt copper. |
| 22 | Complete major overhauling/servicing of 3 Phase 15 HP centrifugal pump meant for water delivery by providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.), remetaling, machining, balancing of impeller, shaft, housing cover and lathe works as per site requirement and condition etc.complete as required. | Complete major overhauling/servicing of 3 Phase 15 HP centrifugal pump meant for water delivery by providing/replacement of necessary spares (bearing, slip bush, shaft, shaft key, impeller, seals, gland case, stack bolt etc.), remetaling, machining, balancing of impeller, shaft, housing cover and lathe works as per site requirement and condition etc.complete as required. |
| 23 | Replacement of defective/non-functional analogue pressure gauge of following specifications suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) (0-7) kg/cm2 in step of 1 kg/cm2 | Replacement of defective/non-functional analogue pressure gauge of following specifications suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) (0-7) kg/cm2 in step of 1 kg/cm2 |
| 24 | Replacement of defective/non-functional Chlorine Doasing Pump (ION Exchange make INDION-6/Milton Roy make UC-12 or equivalent) of 6 LPH capacity at 4kg/cm2 pressure including supply (Antisyphone Valve + Foot Valve + LDPE Tubing) and installation | Replacement of defective/non-functional Chlorine Doasing Pump (ION Exchange make INDION-6/Milton Roy make UC-12 or equivalent) of 6 LPH capacity at 4kg/cm2 pressure including supply (Antisyphone Valve + Foot Valve + LDPE Tubing) and installation |
| 25 | Replacement of defective/non-functional Air Blower Pump Set and C.I Reflux Type ISI PN-1.6 Flange End 80mm NRV with all fitting accesories ,welding & fabrication work at Northern/Central IRP, as per site requirement | Replacement of defective/non-functional Air Blower Pump Set and C.I Reflux Type ISI PN-1.6 Flange End 80mm NRV with all fitting accesories ,welding & fabrication work at Northern/Central IRP, as per site requirement |
| 26 | Replacement of defective/non-functional motor (2HP to 3HP) suitable for Air Blower Pump Set with all fitting accesories, welding & fabrication work at Northern/Central IRP as per site requirement | Replacement of defective/non-functional motor (2HP to 3HP) suitable for Air Blower Pump Set with all fitting accesories, welding & fabrication work at Northern/Central IRP as per site requirement |
| 27 | Replacement of defective/non-functional ball valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 1 inch Ball valve | Replacement of defective/non-functional ball valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 1 inch Ball valve |
| 28 | Replacement of defective/non-functional ball valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 0.5 inch Ball valve | Replacement of defective/non-functional ball valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 0.5 inch Ball valve |
| 29 | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2.5 inch Screw Type Check valve | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2.5 inch Screw Type Check valve |
| 30 | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 4 inch Flange Type Check valve | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 4 inch Flange Type Check valve |
| 31 | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 6 inch Flange Type Check valve | Replacement of defective/non-functional check valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 6 inch Flange Type Check valve |
| 32 | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 3 inch dia Flange Type Diaphragm valve | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 3 inch dia Flange Type Diaphragm valve |
| 33 | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 1 inch dia Flange Type Diaphragm valve | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 1 inch dia Flange Type Diaphragm valve |
| 34 | Replacement of defective/non-functional Diaphragm Valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia PP/CI Flange Type Diaphragm Valve | Replacement of defective/non-functional Diaphragm Valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia PP/CI Flange Type Diaphragm Valve |
| 35 | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 2.5 inch dia Flange Type Gate valve | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationb) 2.5 inch dia Flange Type Gate valve |
| 36 | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 0.5 inch dia Screw Type Gate valve | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 0.5 inch dia Screw Type Gate valve |
| 37 | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia Screw Type Gate valve | Replacement of defective/non-functional gate valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia Screw Type Gate valve |
| 38 | Replacement of defective/non-functional non-return valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia Flange Type NRV(Non Return Valve) | Replacement of defective/non-functional non-return valve of following size suitable for water pipe line i/c Dismantling and re-installation with providing gasket, nut-bolts and other necessary accessories (if required) complete as reqd. to match the existing installationa) 2 inch dia Flange Type NRV(Non Return Valve) |
| 39 | Replacement of defective/non-functional components of electrical panel of following specifications suitable for existing LT panels i/c Dismantling, supply and fixing installation/fixing, required wiring modifications, providing required lugs, nut-bolts and washers, mounting channels and other necessary accessories (if required) complete as reqd. to match the functional requirements | Replacement of defective/non-functional components of electrical panel of following specifications suitable for existing LT panels i/c Dismantling, supply and fixing installation/fixing, required wiring modifications, providing required lugs, nut-bolts and washers, mounting channels and other necessary accessories (if required) complete as reqd. to match the functional requirements |
| 40 | The execution of DSR (E&M) 2025 of estimate Amount of Rs. 2,00,000.00 Item mentioned in chapter 1 to chapter 42 including Appendix-I & II as when required basis for repair/ maintenance/ addition/ alternation etc. of internal and external electrical installations. [Quoting in the rate 10% below the Estimate amount of Rs. 2,00,000.00 means amount will be Rs. 1,80,000.00Similarly quoting in the rate 10% above the estimated amount Rs. 2,00,000.00 means amount will be Rs.2,20,000.00](Note: Payment of DSR rate will be made after deduction of GST considered in the rate of DSR - 2025) | The execution of DSR (E&M) 2025 of estimate Amount of Rs. 2,00,000.00 Item mentioned in chapter 1 to chapter 42 including Appendix-I & II as when required basis for repair/ maintenance/ addition/ alternation etc. of internal and external electrical installations. [Quoting in the rate 10% below the Estimate amount of Rs. 2,00,000.00 means amount will be Rs. 1,80,000.00Similarly quoting in the rate 10% above the estimated amount Rs. 2,00,000.00 means amount will be Rs.2,20,000.00](Note: Payment of DSR rate will be made after deduction of GST considered in the rate of DSR - 2025) |
| 41 | Supply and dosing of Sodium Hypochlorite (NaOCL 8% free Chlorine) including transportation at site etc. as and when required basis . | Supply and dosing of Sodium Hypochlorite (NaOCL 8% free Chlorine) including transportation at site etc. as and when required basis . |
| 42 | Supply and dosing of NaCL (Iodine Free) on daily basis including transportation at site etc. as and when required basis. | Supply and dosing of NaCL (Iodine Free) on daily basis including transportation at site etc. as and when required basis. |