| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. |
| 2 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 3 | Transportation of excavated earth and dismantling debris by mechanical means including loading and Unloading within 5 KM lead as per direction of Engineer in charge. |
| 4 | Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 5 | Providing laying, spreading and compacting graded stone aggregate to \\"WET MIX MACADAM\\" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works (4th Revision). |
| 6 | Cement concrete (1:4:8) using 40mm and down gradedhard granite hand broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 7 | Providing P.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 8 | Providing R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. |
| 9 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 10 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. |
| 11 | Supplying all materials, labour, T&P and fitting and fixing on wall face U-PVC SWR (soil, waste, rain water) ventilating pipes and fittings of the following outside diameter conforming to ISI No 13592/1992 to walls with nails, bobbins and wooden plugs including jointing with supply of approved rubber lubricant by non-heat application method/as per manufacturer's specification, testing etc all complete as per P.H specification and direction of the E.I.C. (Make: Oriplast/ Supreme/Astral/ Hariplast/Fenolex & Equivalent)110 mmdia UPVC SWR Pipe (Type B) |
| 12 | Raseing man hole chamber including dismantling and reconstruction of road depth 0.15mtr to 0.225 mtr etc complete as per direction of EIC. |
| 13 | Display board with writing painting and photograph (Pre,dring & post) Please Enable Macros to View BoQ information |