|
| 1 | Complete maintenance of Trees in green belts (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge. Complete maintenance in green belt (out side garden) |
| 2 | Trees603.00X24 = 14472.00 Months |
| 3 | Complete maintenance of Trees in RSP (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge. Complete maintenance in RSP (out side garden) |
| 4 | Trees396.00X24 = 9504.00 Months |
| 5 | Trees654.00X24 = 15696.00 Months |
| 6 | Trees1265.00X24 = 30360.00 Months |
| 7 | Complete maintenance of Shrubs in Green Belt (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge. Complete maintenance in green belt (out side garden) |
| 8 | Shrubs5187.00X24 = 124488.00 Months |
| 9 | Complete maintenance of Shrubs in RSP (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge. Complete maintenance in RSP (out side garden) |
| 10 | Shrubs15250.00X24 = 366000.00 Months |
| 11 | Complete maintenance of the entire Garden featured having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of palnts gap filing, watering, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge.35492.19X24 = 851812.56 Months |
| 12 | Providing and watering for irrigation through Water Tanker of Horticulture features i.e. lawn, tree, shrubs, hedge / edge, ground cover etc. at the side of work water tanker having 5000 Ltr. Capacity with one labour for watering/I/C cost off water, filling of tanker, watering at side with all leads and lifts as per direction of officer in charge. |
| 13 | Watering of 1 to 3 year plants (for Trees)654.00X24 = 15696.00 Months |
| 14 | Watering of beyond 8 year plants (for Trees)1265.00X24 = 30360.00 Months |
| 15 | Watering of 1 to 3 year plants (for Shrubs)19300.00X24 = 463200.00 Months |
| 16 | Providing profuse watering arrangement for lawn/Park at site to make available for irrigation ie. Diesel engine & Oil etc. RH Pipe/Canvas Pipe & other T&P and carriage Etc. complete. (As per Noida Authority Approved)8.77X24 = 210.48 Months |
| 17 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) |
| 18 | Trees (0.60mtr. Dia & 0.60mtr deep) |
| 19 | Shrubs (0.45mtr Dia & 0.45mtr deep) |
| 20 | Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km. lead completed. (Cattle manure measured in stacks will reduced by 8% for payment) |
| 21 | Supply of DAP at site. |
| 22 | Supply of Neem oil cake pulverized and un-decordicated packed in bages. |
| 23 | Supply of stemed bone meal at site packed in bages |
| 24 | Supply & Planting of Plants, Plants height 5-6 feet as required by engineer in charge | 6\\" X 8\\" Polythene bags or earthen pot fully foliage ad well branched free from disease (As per market rate) |
| 25 | Trees |
| 26 | Plumeria Alba |
| 27 | Supply & Planting of Shrubs, Plants height 2-2.5 feet as required by engineer in charge 16\\" X 8\\" Polythene bags or earthen pot fully foliage ad well branched free from disease (As per market rate) |
| 28 | Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 20 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. |
| 29 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 30 | Plantation of seasonal two times on road side (0.45mtr to 0.60mtr wide bed) including making of bed etc. complete Item |
| 31 | Maintenance of seasonal/hedge/ground cover at road side including weeding hoeing and prunning (Cutting) in required shape etc of groun bed complete Item. (0.45mtr tos 0.60 mtd bed) and watering of seasonal flowers by water tanker at road side including source of water POI etc. Complete.13628.30X24 = 327079.00 Months |
| 32 | Supply of chloropyriphos 20% E.C./Lindan 20% E,C. FOR Anti-Termite treatment of plants@2ml/plant in the interval of 01 month up to one year ile 12times in a year hence it comes 0.24ml/per plant. As per market rate) |
| 33 | Supply of labour prunning of malwa with all complete Item |
| 34 | Supply of tractor with trolley including driver with all complete Item |
| 35 | D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex Kisan /Supreme approved by engineering in charg eof boring 200 feet |
| 36 | Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete (size 1.00 x 0.45 x 0.9) as per UP PWD SOR rate. |
| 37 | P/F following size fo Finolex makes PVC, pipes 6.0 kg./cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making upt to length and making joints i/c cost of socket Plsiochem PV -85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment Make Finolex /Kisan/supreme Industries Ltd. (Rate as per comparative statement Per Rm.) 90mm dia with coupler @ 6kg/Cm2 Pressure with i/e all PVC Stanared specials |
| 38 | S/F Submersible motor pump CRI make of 3 HP fixing and all material and labour complete. |
| 39 | Provding and fixing hydrant with all complete. |
| 40 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |