Tender For Wall Cladding Works In Conference Hall, Vip And Waiting Room At 5Th Floor Of Sardar Vallabhbhai Patel Sinchai Bhawan Canal Colony, Lucknow. (Lot-02), Lucknow-Uttar Pradesh
TDR : 56127013
Tender Notice
BOQ
5 Days Left
Lucknow
Uttar Pradesh
Tender For Wall Cladding Works In Conference Hall, Vip And Waiting Room At 5Th Floor Of Sardar Vallabhbhai Patel Sinchai Bhawan Canal Colony, Lucknow. (Lot-02)
Name of Work:- Wall Cladding works in Conference Hall, VIP and Waiting Room at 5th floor of Sardar Vallabhbhai Patel Sinchai Bhawan Canal Colony, Lucknow. (Lot-02)
Sl. No.
Item Description
1
Providing and fixing specified wood frame work consisting of battens 50x25mm fixed with rawl plug and drilling necessary holes for rawl plug etc. including priming coat complete Kiln seasoned and chemically treated hollock wood.
2
Providing and fixing 19mm thick both side balancing lamination factory pressed BWP grade marine ply as per IS 710 of approved brand boxes,shelves,racks,almirah,cupboard and drawer etc. including necessary nails,screws etc. complete as per direction of Engineer-incharge.
3
Providing and fixing 4mm thick coir veneer board, ISI marked IS : 14842, plain lining with necessary screws, priming coat on unexposed surface etc., complete.
4
Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. andthen with sand paper of 160/180 nos.2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs.4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion.This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.