| 1 | A) Preparation of Lawn and Shrubbery |
| 2 | Supplying on site fresh Garden soil (free from stones rubbish like dried grass roots, other such materials) for excavation area of depth of 30 cms.( consolidated thickness).(As per P&G DSR 2022-23 Items of garden work,Sr No.36a) |
| 3 | Supplying on site well decomposed Farmyard Manure for excavation area of depth of 30 cms. (Consolidated thickness). (As per P&G DSR 2022-23 Items of garden work,Sr No.36b) |
| 4 | Providing on site required variety of lawn (free from weeds /disease etc.) *Cynadon/ paspalum/ selection* for 1 sqm. area dibbling distance 5 cms. apart c/c. (As per P&G DSR 2022-23 Items of garden work,Sr No.46) |
| 5 | Excavation for planting lawn/ shrub/ flower bed/ hedges/ edges/ canna bed in earth, soil of all types, soft murum, including removing the excavated material up to a distance of 50 mtrs. for a depth of 30 cms.(As per P&G DSR 2022-23 Items of garden work,Sr No.3) |
| 6 | Filling fresh garden soil / silt & manure in excavated area of depth 30cms. (As per P&G DSR 2022-23 Items of garden work,Sr No.13) |
| 7 | Mixing garden soil/silt & manure thoroughly well, watering previous night. Planting required plant species, lawn grass as directed etc. complete for required depth 30 cms. for planting lawn/ shrub/ flower bed/ hedges/ edges/ canna bed/ ground cover. (1/10 of semiskilled labour)(As per P&G DSR 2022-23 Items of garden work,Sr No.23) |
| 8 | Maintainance of Newly Developed lawn Area. For First 30 days Only (Paspalum/ selection)(As per P&G DSR 2022-23 Items of garden work,Sr No.28) |
| 9 | Providing on site required variety of Shrubs (free from weeds /disease etc.) 30 cms. apart c/c. 1(a) serial no 15 |
| 10 | Plumbago or equivalent |
| 11 | Heliconia or equivalent |
| 12 | Maintenance of Newly Developed Shrubs Area. For First 30 days Only (As per P&G DSR 2022-23 Items of garden work,Sr No.31) |
| 13 | B) Plantation of Trees |
| 14 | Supplying on site fresh Garden soil (i. e. 3 part soil) (free from stones rubbish like dried grass roots, other such materials) for excavated pit size area of 0.60 x 0.60 x 0.60m ( consolidated thickness).(As per P&G DSR 2022-23 Items of garden work,Sr No.44a) |
| 15 | Supplying on site well decomposed Farm Yard Manure FYM (i. e. 1 part FYM) for excavated pit size area of 0.60 x 0.60 x 0.60m (consolidated thickness).(As per P&G DSR 2022-23 Items of garden work,Sr No.44b) |
| 16 | Providing on site required variety of Tree (free from weeds /disease etc.) 30 cms. apart c/c.Name:- Bahava;Bag Size 13 x13\\", ht 6-8'(plants list sr no1,item no 5B) |
| 17 | 1.Plumeria Dwarf singapore pink or equivalent |
| 18 | 2.Plumeria Alba1 or equivalent |
| 19 | 3.Royal plam or equivalent |
| 20 | Excavation pit size 0.60 x 0.60 x 0.60m for planting small & medium ornamental plants/ large flowering/ shady trees (plant height 1 to 2 mtr.)/ palm varieties upto height 1 to 2 mtrs. in earth, soil of all types, soft murum, including removing the excavated & unwanted material up to a required distance of 50 mtrs. (As per P&G DSR 2022-23 items of garden work,Sr No.11) |
| 21 | Filling fresh garden soil / silt & manure in excavated pit size area of 0.60 x 0.60 x 0.60m (1/10 of unskilled labour)(As per P&G DSR 2022-23 Items of garden work,Sr No.21) |
| 22 | Mixing garden soil/silt & manure thoroughly well, watering previous night. Planting required plant species as directed etc. complete for required pit size 0.60 x 0.60 x 0.60m. (1/10 of semiskilled labour) (As per P&G DSR 2022-23 Items of garden work,Sr No.26) |
| 23 | Maintenance of Newly Planted tree varieties having height 1mtr. - 2mtr. For First 30 days Only (As per P&G DSR 2022-23 Items of garden work,Sr No.34) Please Enable Macros to View BoQ information |