|
| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 2 | 12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand) (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 5 | Providing and applying Acrylate PU Hybrid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @1.5 to 2.0 Kg /10 sqm. One coat of self-priming of Acrylate PU Hybrid waterproofing liquid (dilution with water in the ratio of 2:1) and two coats of undiluted Acrylate PU Hybrid liquid (dry film thickness of complete application/system not less than 800 microns). (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 6 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws .(Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 7 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 8 | Providing and applying white cement based putty of approved brand with average thickness 1mm over the plastered wall surface to prepare the surface even and smooth complete of work. (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 9 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 10 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two or more coats) over and including water thinnable priming coat with cement primer. (Including All Materials, Labour, T&P etc Complete But Excluding GST) |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (Including All Materials, Labour, T&P etc Complete But Excluding GST) Please Enable Macros to View BoQ information |