|
| 1 | Work as per UPCL RESPO. |
| 2 | Dismantling of Distribution Transformer (DTR) of capacity 16 kVA, including safe disconnection, lowering from structure and stacking at designated place |
| 3 | Dismantling of Distribution Transformer (DTR) of capacity 25 kVA |
| 4 | Dismantling of Distribution Transformer (DTR) of capacity 63 kVA |
| 5 | Dismantling of Distribution Transformer (DTR) of capacity 100 kVA |
| 6 | Dismantling of Distribution Transformer (DTR) of capacity 160 kVA |
| 7 | Dismantling of Distribution Transformer (DTR) of capacity 250 kVA |
| 8 | Dismantling of Distribution Transformer (DTR) of capacity 400 kVA |
| 9 | Erection and installation of 400/500 kVA Distribution Transformer on existing/new pole mounted structure including fixing, alignment and connections |
| 10 | Erection and installation of 250 kVA DTR on pole mounted structure |
| 11 | Erection and installation of 100 kVA DTR on pole mounted structure |
| 12 | Erection and installation of 63 kVA DTR on pole mounted structure |
| 13 | Erection and installation of 25 kVA DTR on pole mounted structure |
| 14 | Erection and installation of 16 kVA DTR on pole mounted structure |
| 15 | Erection and installation of 400/500 kVA DTR on PCC plinth structure including leveling and fixing |
| 16 | Erection and installation of 250 kVA DTR on PCC plinth |
| 17 | Cartage of 63 kVA DTR including loading, unloading and safe transportation over distance of 51–70 km |
| 18 | Cartage of 100 kVA DTR (51–70 km) |
| 19 | Cartage of 250 kVA DTR (51–70 km) |
| 20 | Cartage of 400/500 kVA DTR (51–70 km) |
| 21 | Head load cartage of 16 kVA DTR within 0–1 km including manual handling |
| 22 | Head load cartage of 25 kVA DTR (0–1 km) |
| 23 | Head load cartage of 63 kVA DTR (0–1 km) |
| 24 | Head load cartage of 100 kVA DTR (0–1 km) |
| 25 | Head load cartage of 250 kVA DTR (0–1 km) |
| 26 | Head load cartage of 400 kVA DTR (0–1 km) |
| 27 | Dismantling of existing fencing and gate including removal of foundation and stacking |
| 28 | Re-erection of fencing and gate including civil work, fixing and alignment |
| 29 | Cartage of 16 kVA DTR over distance 51–70 km including loading & unloading |
| 30 | Cartage of 25 kVA DTR over distance 51–70 km |
| 31 | Back carriage of dismantled DTR (16–160 kVA) distance (51–70 km) |
| 32 | Back carriage of DTR (250–500 kVA) distance (01–20 km) Please Enable Macros to View BoQ information |