| 1 | JHARKHAND URJA SANCHARAN NIGAM LIMITED Tender Inviting Authority:- General Manager, Transmission Zone-IV, Medininagar Price Part-II e-NIT No. 279/PR/JUSNL/2026-27 Name of Work Execution of protective work for safety of Existing Tower foundation to prevent soil erosion in tower location no. 235 (T) of 220 KV D/C Daltonganj (PGCIL)- Bhagodih Transmission Line under the jurisdiction of TSD, Bhagodih Name of the Bidder S.No. Name of Material Unit Qty. Rate per Unit (Rs) Amount(Rs) |
| 2 | Earth work in excavation in foundation trench in ordinary soil and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, leveling, ramming the foundation trenches ,removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I. |
| 3 | Providing coars clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. |
| 4 | Providing designation 75A one brick flat soiling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 5 | Providing P.C.C. M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coars sand of F.M 2.5 to 3.5 including screening shuttering mixing cement concrete in mixer and placing in position, vibrating, striking curing taxes and royalty all complete as per building specification and direction of Engineer-in-charge. |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for wall(any thickness) including attached pilasters, butteresses, plinght and string courses etc. |
| 7 | Providing R.C.C. M-20 in nominal mix of 1:1.5:3 in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F. M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, cutting taxes & royalty all complete as per specification and direction of E/I. |
| 8 | Providing tor steel reinforcement of 16 mm dia bars as per design & drawing with cutting and bending with anealed wire with the cost of wire removal of rust , placing the rods in position ( excluding carriage of bars to work site ) all complete as per direction of E/I.{Only valid for Tata (Tiscon), SAIL, JSPL ,Electrosteel Ltd. Bokaro and Vijag (RINL)} |
| 9 | Providing tor steel reinforcement of 10 mm dia bars as per design & drawing with cutting and bending with anealed wire with the cost of wire removal of rust , placing the rods in position ( excluding carriage of bars to work site ) all complete as per direction of E/I.{Only valid for Tata (Tiscon), SAIL, JSPL ,Electrosteel Ltd. Bokaro and Vijag (RINL)} |
| 10 | Providing designation 75A Bricks works in C.M. (1:4) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints cost of screening materials racking out joint to 15 mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 11 | Providing designation 75A Bricks works in C.M. (1:3) in superstructre and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints cost of screening materials racking out joint to 15 mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 12 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water , scaffolding taxes and royalty all complete as per building specfication and direction of E/I. |
| 13 | Supply and fixing of 110 mm dia good quantity PVC pipe in retaining wall |
| 14 | Filling of foundation trench and plenth in layer well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5m all complete as per building specfication and direction of E/I. |
| 15 | Carriage of Materials a Stone Chips (20KM- 18SR+2KR) m³ 118.8 0.0 b Sand (15KM - 12SR+3KR) m³ 96.3496 0.0 c Cement (09KM - 08SR+01KR) MT 58.8417 0.0 d Steel (09KM -08SR+01KR) MT 5.6115 0.0 e Brick (09KM -08SR+1KR) 1000Nos. 19.296 0.0 Sub-Total A 0.0 GST @18% On Sub-Total 0.0 Sub-Total B 0.0 Labour Cess@1% on Sub-Total B 0.0 Grand Total 0.0 Say 0.0 Amount in word: Note: Bidder will only fill their NAME and item wise RATE in above rate column. |