| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: .1 All kinds of soil : |
| 2 | Supplying and stacking of graded stone aggregate at site of size range. (Excluding Carriage) 53mm to 22.50mm |
| 3 | Supplying and stacking at site stone screening of size (excluding carriage) 11.2 mm nominal size (Type B) |
| 4 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 8 | Slip/ Drain clearnce In soils; mixed with moorum/Kankar/shingle/boulders; disposallead upto 50 m and lift upto 1.5 m. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 10 | Foundations, footings, bases of columns etc. for mass concrete |
| 11 | Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. |
| 12 | Sand for an av.100 Kms disntace. |
| 13 | Stone Agregate bajree 20km distance |
| 14 | Stone aggregate 53mm to 22.50mm size for an av.20 Kms distance . |
| 15 | Stone aggregate/screening11.20 mm nominal size size for an av.20 Kms distance . Please Enable Macros to View BoQ information |