| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS20B and sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering and bailing out water and cleaning and levelling the site etc.,complete 10cm |
| 2 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal stone aggregate to Wet Mix Macadam (WMM) specification including premix the materials with water at OMC in machanical mix plant carriage to mixed materials by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clause 406 of MORTH specifications |
| 3 | Providing and laying tack coat of 7.00kgs/10 sqm over the prime surface treated with binter using 7.00 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications |
| 4 | Providing and laying tack coat of 2.50kgs/10 sqm over the prime surface treated with binter using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications |
| 5 | Providing and laying 50mm compacted thick Dense Bituminous Macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tones capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labor charges for loading bitumen in to bitumen tank and metal to feeder unit, labor for attending to paver site etc., including hire charges and fuel charges for 20- 30t C M P with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 505 of MORTH Rev-5 specifications. |
| 6 | Providing and laying tack coat of 2.00kgs/10 sqm over the prime surface treated with binter using 2.00 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications |
| 7 | Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. |
| 8 | Add GST 18% Please Enable Macros to View BoQ information |