| 1 | supply of CI Sluice valve |
| 2 | OD32986/2024-2025:Providing C.I. sluice valves IS 14846 ,PN16, 300 mm diameter complete with bolts, nuts, rubber insertion etc.(Kriloskar or equivalent) |
| 3 | OD32943/2024-2025:Dismantling the existing damaged valve and fixing already supplied C.I. sluice valve including the cost of labor, tools, plants, conveyance, etc. complete as per the direction department officer at the site excluding cost of the valve. |
| 4 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 5 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 6 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric |
| 8 | 18.83.7:Labour for cutting C.I. pipe with steel saw.300 mm diameter C.I. pipe |
| 9 | OD50234/2025-2026:Supply of Bolts and Nuts including conveyance charges etc. compltete |
| 10 | OD1321/2026-2027:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges., |
| 11 | OD32994/2024-2025:Fabricating and Fixing MS flanges for connecting sluice valve in to pipe lines . including cost of material, labour , machinery, conveyance, incidental and handling charges etc complete. |
| 12 | OD32996/2024-2025:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges |
| 13 | OD54227/2025-2026:Fabrication of valve support as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied., |
| 14 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site |
| 15 | OD48030/2025-2026:Trial run of the valve after completing all the works as per the direction of departmental officer at site. Please Enable Macros to View BoQ information |