| 1 | E/W in filling in making bunds and diversion with manual compaction and proper dressing i/c lead upto 200 M and lift upto 1.50 M with all cost of labour and T&P etc complete |
| 2 | Earth work in foundation in dry ordinary soil including lift upto 1.50 M & lead upto 30 M and including back filling.watering, ramming of excavated earth into the trenches or into the space between the structure and sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by Engineer-in-charge upto a distance 30 M from the foundation trenches |
| 3 | Supplying and filling in plinth with local sand under floors, including watering, ramming, consolidating and dressing complete. |
| 4 | Laying P.C.C. M-15 (1:2:4) in foundation using stone grit 20-40 mm size, coarse sand and cement with mannual compaction i/c all cost of material, labour, T&P etc complete |
| 5 | Laying C.C. M-20 (1:1.5:3) in structure using stone grit 10-20 mm size, coarse sand and cement with mechanical vibration i/c all cost of material, labour, T&P etc complete |
| 6 | Laying R.C.C. M-25 (1:1:2) in super structure using stone grit 4-20 mm size, coarse sand and cement with mechanical vibration i/c all cost of material, labour, T&P etc complete |
| 7 | Laying C.C. M-30 in wearing coat using stone grit 4-10 mm size, coarse sand and cement with mannual compaction i/c all cost of material, labour, T&P etc complete |
| 8 | Providing Centering and Shuttering for R.C.C. work with all cost of material, labour & T.& P. etc. complete. |
| 9 | Providing steel reinforcement (Fe 500 or above grade) as per approved design, drawing, removal of rust, cutting, bending, binding including supplying annealed wire, placing of M.S. rods in proper position as per specifications and direction of Engineer in charge |
| 10 | Laying Boulder 20-40 Kg in Launching Apron i/c cost of all material, labour and T&P etc. Complete. |
| 11 | S/F 0.80 M Long PVC Pipe 90 mm dia for drainage including cost of all material, labour and T&P etc complete: |
| 12 | Filling expansion Joint with joint filler board 20 mm thick incl all cost of material, labour, t&p etc complete |
| 13 | S/L Bitumen/Coal Taring two coat on approach slab i/c all cost of material, labour, t&p etc complete |
| 14 | Supplying & Laying 200 micron LDPE Film under Brick Tile Lining including cost of all material, labour and T&P etc complete |
| 15 | S/F 2.0 M Long PVC Pipe 75 mm dia for weep hole including cost of all material, labour and T&P etc complete |
| 16 | Painting with acrylic smooth exterior paint of required shade on new concrete surface (two or more coat applied @ 1.67 Itr/10 sqm over including primer coat of exterior primer applied @ 2.20 kg/10 sqm including supply of all labour, material, T&P required for proper completion of work as per drawing and Technical Specification Clause 1701 (On Crash barrier) |
| 17 | S/F of Sign Board at Site incl all cost of material, labour, painting, writing, t&p, etc complete |
| 18 | E/W in strengthening and repairing of bank of channel with manual compaction and proper dressing i/c lead upto 200 M and ift upto 1.50 M with all cost of labour and T&P etc complete |
| 19 | Supplying & Placing earth filled EC Bags in Position including all cost of EC Bags, labour. T&P etc complete |
| 20 | Dismentellig of Bunds and diversion i/c disposal of excavated earth upto 30.00 lead & 1.50 M lift i/c all cost of labour. T&P etc complete |
| 21 | Dismantling R.B. work with disposal of refuse within 60 M |
| 22 | Dismantling brick work in cement mortar including stacking of material within a distance of 60 M as per direction of Engineer-in-charge |
| 23 | Hiring of diesel pump 5 HP including operator, POL and maintenance for dewatering Please Enable Macros to View BoQ information |