| 1 | Carrying of damaged pantoon about 2.00 km from the place of anchoring to down stream at place of repairing including carrying in shallow water including supply of all material labour and T&P etc. |
| 2 | Cleaning of Pantoon surface and detecting damaged portion by sammering & demarking the affected portion. |
| 3 | Cutting and welding of 6 mm thick M.S. plate moulded into required shape including cost of all material labour T&P etc. but excludingcost of M.S. Plate required for proper completion of the work. |
| 4 | Painting of repaired pantoon with two coats of approved quality anti corrosive paint over one coat of red oxide primer over pantoon including dragging of pantoon pair to the river shore opening out nuts and bolts and removing girder, railing of pantoon on the bank for painting and again lanching the pantoons in water and making pairs wight girder an tightening with nuts and bolts and putting back to safer place of river bank in water. S.I. 641&642 |
| 5 | Opening of U clamp from chequred plate |
| 6 | Dismentling of Chequered plate and lifting of chequered plate and loading into truck including cost of cairriage, loading, unloading, T & P and duly stacked in store. |
| 7 | Dismentalinalling and carraige of the following material from bridge site to store site including loading and unloading and stacking etc. complete.ailing post |
| 8 | Dismentalinalling and carraige of the following material from bridge site to store site including loading and unloading and stacking etc. complete. Sal edging (3.65x0.17x0.1) |
| 9 | Dismentalinalling and carraige of the following material from bridge site to store site including loading and unloading and stacking etc. complete.Sal sleeper (4.25x0.25x0.125) |
| 10 | Dismentalinalling and carraige of the following material from bridge site to store site including loading and unloading and stacking etc. complete.R.S. Joist of 5.25 Meter |
| 11 | Dismentalinalling and carraige of the following material from bridge site to store site including loading and unloading and stacking etc. complete.R.S. Joist of 10.00Meter |
| 12 | Extraction of 10 mm dia wire roap wira from railing post and making roll . |
| 13 | Diferent material such as nut and bolts, washer, wire roap, P.P. roap etc. |
| 14 | Cartadge of pantoon after dismantling from bridge site to store place including haulage of the pantoon upto river bank, disconnecting the pantoon loading, unloading with the help of crane labour T&P etc. |
| 15 | Supply of Plastic roap of approved quality including cost of material and cartage at site with local taxes, labour and T & P etc. complete. |
| 16 | Supply of Wooden Crate of Size (2.80x1.8x1.8M) including cost of material and cartage at site with local taxes, labour and T & P etc. complete. |
| 17 | Maintanance of Pantoon river water including watch and ward of material after dismaintling Complete. 3 Nos of Chaukidar 2 Hours of Disel Pump for dewatering of water from pantoons =3x300+2x150 |
| 18 | Cartadge of pantoon from store to bridge site including loading on truck, trailer and unloading on site. |
| 19 | Local shifting of pantoon within 500 Meter with the help of crain |
| 20 | Dragging the pantoon from dry bed to the river water and making pair and anchoring them in the down stream side of pantoon bridge. |
| 21 | Carrying of pantoon pair from the place of anchoring (down streem side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and refixing the same in bridge alignment. |
| 22 | Sinking of pontoons to obtain the proper gradient as laid in dry bad / shallow water in the alignment of pontoon brodge as per direction of E/I. |
| 23 | Laying of wooden anchors in the river on the up stream/Down stream side of the pantoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and fixing to pantoon with coir rope/sisall rope excluding cost. |
| 24 | Carriage and laying of spliced R.S. Joist (10.00m long) including loading unloading cost of carriage from central store and placing on the as per direction of engineer incharge. |
| 25 | Carriage and laying of spliced R.S. Joist (5.25m long) including loading unloading cost of carriage from central store and placing on the as per direction of engineer incharge. |
| 26 | Carriage of wooden anchor from store to bridge head including loading unloading cartage etc. as per direction of Engineer Incharge. |
| 27 | Railing post |
| 28 | Sal edging (3.65x0.17x0.1) |
| 29 | Sal sleeper (4.25x0.25x0.125) |
| 30 | Extraction of 10 mm dia wire roap wira from railing post and making roll . |
| 31 | Carriage of diferent material such as railing post nut and bolts, washer, wire roap, P.P. roap etc. |
| 32 | Cartage and laying of chaquered plate including loading Unloading cost of carriage from store to laying at site And also relaying of chaquerred plate after making camber by speading of local sand as per direction of E/I. |
| 33 | Supply and filling of E.C. bags with the local sand and stiching with the sutaly and placing filled bags in position |
| 34 | lettering and Painting of sign board 4'x3' |
| 35 | Two coat of painting over railing post including cost of labour and paint |
| 36 | Leveling and dressing of Road ( 4 CM ) |
| 37 | Maintanance of Pantoon Bridge day and night thought 7 Months including all labour etc compete all as directied by E/I. { Rate = 1 mate +2 beldar and one small boat with mallah + 2 hours of pumping set for dewatering the water from pantoons = (1x350+2x300+1+585+2x150)x30 } |
| 38 | Maintanance of Chequerred plates Road thought 7 Months including all labour etc compete all as directied by E/I (Rate is for Mela Period i.c. 3 months = SI.NO. 19 (vi) = 18000/3*7 = Rs. 42000/= for 7 month |
| 39 | Providing and Erection of Phoos huts for maintenance of Pantoon bridge. (12x10) Feets. |
| 40 | Supply of following material for errection of pantoonMissing Nut, bolt, MS washer, U clamp etc |
| 41 | Supply of following material for errection of pantoonLardge Bamboos of 7.5 Cm. dia |
| 42 | Supply of following material for errection of pantoonSmall Bamboos of 5 Cm. dia |
| 43 | Supply of following material for errection of pantoonCalcutta Sutali |
| 44 | Supply of following material for errection of pantoonBagai Badh |
| 45 | Supply of following material for errection of pantoonMallahi Nail of 15 Cm to 30 Cm. long |
| 46 | Supply of wooden creats of equiliptus ballies 2.80x1.80x1.80 M size made of 8 Cm ballie including cost of labour, T&P and Material |
| 47 | Supply of wooden Ancher of equiliptus ballies 2.40x1.80x3.10 M size made of 8 Cm ballie including cost of labour, T&P and Material |
| 48 | Making bariar on both site of pantoon bridge with ballies |
| 49 | Hire charges of small boats for ferry (for 60 days) with Mallah and helper |
| 50 | Hire charges of Big boats for ferry (for 180 days) with Mallah and helper |
| 51 | Supply of Steel railing wire 10 mm dia |
| 52 | Supply of wooden ballies 150 mm dia Each 4 M in length. |
| 53 | Supply of Medium Boat. |
| 54 | Earth work for making Ramp both side of pantoon bridge and both side of pile culvert tranches for in ordinery soil (loam clay or sand) including lift up to 1.50 m. lead up to 50 m. dressing at site and ramming as per direction of E/I. |
| 55 | Digging and cartage of local sand/Earth form Gotni side including loading-unloading 2 Km. cartage and dully stacked along chequred plate Road as per direction of E/I. |
| 56 | Construction of pile culvert (Laboure Rate only) Please Enable Macros to View BoQ information |