|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.(DSR-2.8.1) |
| 2 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR-4.1.8) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:(DSR-4.1.2) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete in 1:1.5:3 excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (DSR-5.1.2) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (DSR-5.9.1) |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in 1:4 CM (DSR-6.1.1) |
| 7 | TMT of grade Fe-500 or more/Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(DSR-5.22.6) |
| 8 | Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work (NSI-9.14) |
| 9 | Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (NSI-9.15) |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(DSR-10.2) |
| 11 | Grouting of vertical or inclined post of pale/chain/security fencing in true level, alignment and in plumb or inclination as required, including cost of all labour, materials and T&P required for proper completion of work. ( Post and concrete for grouting shall be measured separately) (NSI-9.28) |
| 12 | Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (NSI-9.30) |
| 13 | Fixing of template in position level and alignment for grouting of Anchor bolt in Aux. Structure (labour rate only). (NSI-9.32) |
| 14 | Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (NSI-9.33) |
| 15 | 12 mm cement plaster of mix of 1:4 CM (DSR-13.4.1) |
| 16 | Champering the edge of concrete in Main Gantry, Auxiliary structure, trench Edge of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (NSI-11.18) |
| 17 | 40 MM Thick Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. (DSR-11.3.1) |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. (DSR-13.62.1) |
| 19 | Demolishing brick work in Cement morter manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.(DSR-15.7.4) |
| 20 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (DSR-15.2.1) |
| 21 | Dismantling of existing pale / security / chain link fencing including post and stacking properly as per direction of the Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (NSI 15.13) |
| 22 | Fixing of Pale fencing alongwith horizontal runner and pales with 6 mm dia. 30 mm long galvanized iron bolts and nuts with washer in true alignment and level between the vertical post already grouted as per direction of I/C. (NSI 9.19) |
| 23 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.Made of G.I. wire of dia 4 mm. (DSR-16.70.1) |
| 24 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire. (DSR-16.18.1) Please Enable Macros to View BoQ information |