Railways Government Departments Closing in 10 days TDR #56115846

Supply Of UNF SNA OF PAINTS FOR IGBT-DMU/T, EMU D CS, KOLKATA METRO, MEMU DMC CS and EMU C M DHC C/S

Issued by Government Departments · Chennai, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Jul 2026
10 days left
EMD
20 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chennai → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of unf sna of paints for igbt-dmu/t, emu d cs, kolkata metro, memu dmc cs and emu c m dhc c/s , supply and application of one coach set of pu paint for mutp (d&d2) coaches as per icf specification icf/md/spec-362, amd-01,amd-02,amd-03 & amd-04 (with latest revision/amendment)(applic ation required for two top coats only with exterior marking stickers with additional hindi markin g as per the latest marking diagram of the respective coach). pcrt ofpaints: 1.adhesion promoting primer -30 litres. 2.lightweight body filler - 20 kgs.(to be supplied in 1kg container). 3.pu based surfa cer (two pack) on side walls and roof- 24 litres. 4.unsaturated polyester based knifing putty -40 kgs .(to be supplied in 1kg container). 5. pu based top coat colour pu signal violet ral (4008)-30 litres. 6. pu based top coat colour pu signal black( ral 9004)-30litres. 7. pu based top coat colour papyrus wh ite (ral9018) - 60litres 8. pu based top coat colour graphite grey-7 ltrs 9. ug ag clear -16 litres. 10. pu thinner compatible with pu paint system offered - 40 litres. 11..degreaser - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warranty period: 30 months after the d ate of delivery ] ] , supply and application of one coach set of pu paint for mutp (c c2 m m2 dhcd2hc) coach es as per icf specification icf/md/spec-362,amd-01,amd-02,amd-03 & amd-04 (with latest revision/amendment) (application required for two top coats only with exterior marking stickers with additional hindi marking as per the latest marking diagram of the respective coach). pcrt of p aints 1.adhesion promoting primer -30litres. 2.light weight body filler - 20 kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on side walls and roof- 24 litres. 4.unsaturated polyeste r based knifing putty -40 kgs.(to be supplied in 1kg container). 5. pu based top coat colour pu signal violet ral (4008)-30 litres. 6. pu based top coat colour papyrus white (ral9018)-50 litres 7. pu based to p coat colour graphite grey -14ltrs 8. ug ag clear -16litres. 9. pu thinner compatible with pu paint sy stem offered - 40litres. 10.degreaser - 05 litres. (latest drawing to be obtained from icf design befor e supply and application) [ warranty period: 30 months after the date of delivery ] ] , supply and application of one coach set of pu paint memu / dmc3ph coaches as per icf sp ecification icf/md/spec-362,amd-01,amd-02,amd-03 and amd-04 to (drgno.745-83-003,alt nil) as detailed below: 1.adhesion promoting primer -30litres. 2.light weight body filler -32 kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on side walls and roof- 40 litres. 4.unsaturated polyeste r based knifing putty -32 kgs.(to be supplied in 1kg container) 5.pu based top coat colour pearl light g rey -35ltrs (ral9022). 6.pu based top coat colour signal blue (ral5005) -20 litres 7. pu based top coat c olour signal black (ral 9004)-2 litres. 8. pu based top coat colour sarson yellow(ral 1021)-8 litres 9. ug ag clear -16 litres 10. pu thinner compatible with pu paint system offered - 40 litres. 11.degreas er - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warran ty period: 30 months after the date of delivery ] ] , supply and application of one coach set pu paints for dmu/dpc 1600 hp ac-ac-demu (igbt) ,memu / dmc coaches as per icf specification icf/md/spec-362,amd-01,amd-02,amd-03 & amd-04 to drg no .530-8-3-001,alt b as detailed below: 1.adhesion promotingprimer -30 litres. 2.light weight body filler - 32 kgs.(to be supplied in 1kgcontainer). 3.pu based surfacer (two pack) on side walls and roof- 40li tres. 4.unsaturated polyester based knifing putty -32 kgs.(to be supplied in1kg container) 5.pu based top coat colour pearl light grey -35ltrs (ral9022). 6. pu based top coat colour signal blue (ral5005) -20 litres 7. ug ag clear-16 litres. 8. pu thinner compatible with pu paint system offered - 40 litres. 9.degre aser - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warr anty period: 30 months after the date of delivery ] ] , supply and application of one coach set of pu paint for mrm/dtc, mrm/mc & mrm/tc coac hes as per icf specification icf/md/spec-362,amd-01,amd-02,amd- 03 & amd-04 (with latest revision/ame ndment)to drg. no. 651-8-3-001 & marking diagram 651-8-3-002,651-8-3-003 (relavent marking drgs to b e followed for dtc,mc&tc coaches) pcrt of paints : 1.adhesion promoting primer -30 litres. 2.light w eight body filler - 20kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on sidewa lls and roof- 24 litres. 4.unsaturated polyester based knifing putty -40kgs.(to be supplied in 1kg con tainer). 5. pu based top coat colour signalblue(ral-5005)-40 litres. 6. pu based top coat colour silve r grey(ral-7001) - 30 litres 7. pu based top coat colour signal red to spec is-5:537-(ral-7021)- 10 litres. 8. ug ag clear -16 litres. 9. pu thinner compatible with pu paint system offered - 40 litres. 10.degrease r - 05litres. (latest drawing to be obtained from icf design before supply and application) [ warranty period: 30 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1SUPPLY AND APPLICATION OF ONE COACH SET OF PU PAINT FOR MUTP (D&D2) COACHES AS PER ICF SPECIFICATION ICF/MD/SPEC-362, AMD-01,AMD-02,AMD-03 & AMD-04 (WITH LATEST REVISION/AMENDMENT)(APPLIC ATION REQUIRED FOR TWO TOP COATS ONLY WITH EXTERIOR MARKING STICKERS WITH ADDITIONAL HINDI MARKIN G AS PER THE LATEST MARKING DIAGRAM OF THE RESPECTIVE COACH). PCRT OFPAINTS: 1.ADHESION PROMOTING PRIMER -30 Litres. 2.LIGHTWEIGHT BODY FILLER - 20 Kgs.(TO BE SUPPLIED IN 1KG CONTAINER). 3.PU BASED SURFA CER (TWO PACK) ON SIDE WALLS AND ROOF- 24 Litres. 4.UNSATURATED POLYESTER BASED KNIFING PUTTY -40 Kgs .(TO BE SUPPLIED IN 1KG CONTAINER). 5. PU BASED TOP COAT COLOUR PU SIGNAL VIOLET RAL (4008)-30 Litres. 6. PU BASED TOP COAT COLOUR PU SIGNAL BLACK( RAL 9004)-30Litres. 7. PU BASED TOP COAT COLOUR PAPYRUS WH ITE (RAL9018) - 60Litres 8. PU BASED TOP COAT COLOUR GRAPHITE GREY-7 LTRS 9. UG AG CLEAR -16 Litres. 10. PU THINNER COMPATIBLE WITH PU PAINT SYSTEM OFFERED - 40 Litres. 11..DEGREASER - 05 Litres. (LATEST DRAWING TO BE OBTAINED FROM ICF DESIGN BEFORE SUPPLY AND APPLICATION) [ Warranty Period: 30 Months after the d ate of delivery ] ]
2SUPPLY AND APPLICATION OF ONE COACH SET OF PU PAINT FOR MUTP (C C2 M M2 DHCD2HC) COACH ES AS PER ICF SPECIFICATION ICF/MD/SPEC-362,AMD-01,AMD-02,AMD-03 & AMD-04 (WITH LATEST REVISION/AMENDMENT) (APPLICATION REQUIRED FOR TWO TOP COATS ONLY WITH EXTERIOR MARKING STICKERS WITH ADDITIONAL HINDI MARKING AS PER THE LATEST MARKING DIAGRAM OF THE RESPECTIVE COACH). PCRT OF P AINTS 1.ADHESION PROMOTING PRIMER -30Litres. 2.LIGHT WEIGHT BODY FILLER - 20 Kgs.(TO BE SUPPLIED IN 1KG CONTAINER). 3.PU BASED SURFACER (TWO PACK) ON SIDE WALLS AND ROOF- 24 Litres. 4.UNSATURATED POLYESTE R BASED KNIFING PUTTY -40 Kgs.(TO BE SUPPLIED IN 1KG CONTAINER). 5. PU BASED TOP COAT COLOUR PU SIGNAL VIOLET RAL (4008)-30 Litres. 6. PU BASED TOP COAT COLOUR PAPYRUS WHITE (RAL9018)-50 Litres 7. PU BASED TO P COAT COLOUR GRAPHITE GREY -14LTRS 8. UG AG CLEAR -16Litres. 9. PU THINNER COMPATIBLE WITH PU PAINT SY STEM OFFERED - 40Litres. 10.DEGREASER - 05 Litres. (LATEST DRAWING TO BE OBTAINED FROM ICF DESIGN BEFOR E SUPPLY AND APPLICATION) [ Warranty Period: 30 Months after the date of delivery ] ]
3SUPPLY AND APPLICATION OF ONE COACH SET OF PU PAINT MEMU / DMC3PH COACHES AS PER ICF SP ECIFICATION ICF/MD/SPEC-362,AMD-01,AMD-02,AMD-03 AND AMD-04 TO (DrgNo.745-83-003,ALT NIL) AS DETAILED BELOW: 1.ADHESION PROMOTING PRIMER -30Litres. 2.LIGHT WEIGHT BODY FILLER -32 Kgs.(TO BE SUPPLIED IN 1KG CONTAINER). 3.PU BASED SURFACER (TWO PACK) ON SIDE WALLS AND ROOF- 40 Litres. 4.UNSATURATED POLYESTE R BASED KNIFING PUTTY -32 Kgs.(TO BE SUPPLIED IN 1KG CONTAINER) 5.PU BASED TOP COAT COLOUR Pearl light g rey -35ltrs (RAL9022). 6.PU BASED TOP COAT COLOUR SIGNAL BLUE (RAL5005) -20 Litres 7. PU BASED TOP COAT C OLOUR SIGNAL BLACK (RAL 9004)-2 LITRES. 8. PU BASED TOP COAT COLOUR SARSON YELLOW(RAL 1021)-8 LITRES 9. UG AG CLEAR -16 LITRES 10. PU THINNER COMPATIBLE WITH PU PAINT SYSTEM OFFERED - 40 Litres. 11.DEGREAS ER - 05 Litres. (LATEST DRAWING TO BE OBTAINED FROM ICF DESIGN BEFORE SUPPLY AND APPLICATION) [ Warran ty Period: 30 Months after the date of delivery ] ]
4SUPPLY AND APPLICATION OF ONE COACH SET PU PAINTS FOR DMU/DPC 1600 HP AC-AC-DEMU (IGBT) ,MEMU / DMC COACHES AS PER ICF SPECIFICATION ICF/MD/SPEC-362,AMD-01,AMD-02,AMD-03 & AMD-04 TO Drg No .530-8-3-001,ALT b AS DETAILED BELOW: 1.ADHESION PROMOTINGPRIMER -30 Litres. 2.LIGHT WEIGHT BODY FILLER - 32 Kgs.(TO BE SUPPLIED IN 1KGCONTAINER). 3.PU BASED SURFACER (TWO PACK) ON SIDE WALLS AND ROOF- 40Li tres. 4.UNSATURATED POLYESTER BASED KNIFING PUTTY -32 Kgs.(TO BE SUPPLIED IN1KG CONTAINER) 5.PU BASED TOP COAT COLOUR Pearl light grey -35ltrs (RAL9022). 6. PU BASED TOP COAT COLOUR SIGNAL BLUE (RAL5005) -20 Litres 7. UG AG CLEAR-16 Litres. 8. PU THINNER COMPATIBLE WITH PU PAINT SYSTEM OFFERED - 40 Litres. 9.DEGRE ASER - 05 Litres. (LATEST DRAWING TO BE OBTAINED FROM ICF DESIGN BEFORE SUPPLY AND APPLICATION) [ Warr anty Period: 30 Months after the date of delivery ] ]
5SUPPLY AND APPLICATION OF ONE COACH SET OF PU PAINT FOR MRM/DTC, MRM/MC & MRM/TC COAC HES AS PER ICF SPECIFICATION ICF/MD/SPEC-362,AMD-01,AMD-02,AMD- 03 & AMD-04 (WITH LATEST REVISION/AME NDMENT)TO DRG. No. 651-8-3-001 & MARKING DIAGRAM 651-8-3-002,651-8-3-003 (RELAVENT MARKING DRGS TO B E FOLLOWED FOR DTC,MC&TC COACHES) PCRT OF PAINTS : 1.ADHESION PROMOTING PRIMER -30 Litres. 2.LIGHT W EIGHT BODY FILLER - 20Kgs.(TO BE SUPPLIED IN 1KG CONTAINER). 3.PU BASED SURFACER (TWO PACK) ON SIDEWA LLS AND ROOF- 24 Litres. 4.UNSATURATED POLYESTER BASED KNIFING PUTTY -40Kgs.(TO BE SUPPLIED IN 1KG CON TAINER). 5. PU BASED TOP COAT COLOUR SIGNALBLUE(RAL-5005)-40 Litres. 6. PU BASED TOP COAT COLOUR SILVE R GREY(RAL-7001) - 30 Litres 7. PU BASED TOP COAT COLOUR SIGNAL RED TO SPEC IS-5:537-(RAL-7021)- 10 Litres. 8. UG AG CLEAR -16 Litres. 9. PU THINNER COMPATIBLE WITH PU PAINT SYSTEM OFFERED - 40 Litres. 10.DEGREASE R - 05Litres. (LATEST DRAWING TO BE OBTAINED FROM ICF DESIGN BEFORE SUPPLY AND APPLICATION) [ Warranty Period: 30 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 56115846
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 13-07-2026
Authority
Authority Name Integral Coach Factory
Work Description Supply Of unf sna of paints for igbt-dmu/t, emu d cs, kolkata metro, memu dmc cs and emu c m dhc c/s , supply and application of one coach set of pu paint for mutp (d&d2) coaches as per icf specification icf/md/spec-362, amd-01,amd-02,amd-03 & amd-04 (with latest revision/amendment)(applic ation required for two top coats only with exterior marking stickers with additional hindi markin g as per the latest marking diagram of the respective coach). pcrt ofpaints: 1.adhesion promoting primer -30 litres. 2.lightweight body filler - 20 kgs.(to be supplied in 1kg container). 3.pu based surfa cer (two pack) on side walls and roof- 24 litres. 4.unsaturated polyester based knifing putty -40 kgs .(to be supplied in 1kg container). 5. pu based top coat colour pu signal violet ral (4008)-30 litres. 6. pu based top coat colour pu signal black( ral 9004)-30litres. 7. pu based top coat colour papyrus wh ite (ral9018) - 60litres 8. pu based top coat colour graphite grey-7 ltrs 9. ug ag clear -16 litres. 10. pu thinner compatible with pu paint system offered - 40 litres. 11..degreaser - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warranty period: 30 months after the d ate of delivery ] ] , supply and application of one coach set of pu paint for mutp (c c2 m m2 dhcd2hc) coach es as per icf specification icf/md/spec-362,amd-01,amd-02,amd-03 & amd-04 (with latest revision/amendment) (application required for two top coats only with exterior marking stickers with additional hindi marking as per the latest marking diagram of the respective coach). pcrt of p aints 1.adhesion promoting primer -30litres. 2.light weight body filler - 20 kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on side walls and roof- 24 litres. 4.unsaturated polyeste r based knifing putty -40 kgs.(to be supplied in 1kg container). 5. pu based top coat colour pu signal violet ral (4008)-30 litres. 6. pu based top coat colour papyrus white (ral9018)-50 litres 7. pu based to p coat colour graphite grey -14ltrs 8. ug ag clear -16litres. 9. pu thinner compatible with pu paint sy stem offered - 40litres. 10.degreaser - 05 litres. (latest drawing to be obtained from icf design befor e supply and application) [ warranty period: 30 months after the date of delivery ] ] , supply and application of one coach set of pu paint memu / dmc3ph coaches as per icf sp ecification icf/md/spec-362,amd-01,amd-02,amd-03 and amd-04 to (drgno.745-83-003,alt nil) as detailed below: 1.adhesion promoting primer -30litres. 2.light weight body filler -32 kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on side walls and roof- 40 litres. 4.unsaturated polyeste r based knifing putty -32 kgs.(to be supplied in 1kg container) 5.pu based top coat colour pearl light g rey -35ltrs (ral9022). 6.pu based top coat colour signal blue (ral5005) -20 litres 7. pu based top coat c olour signal black (ral 9004)-2 litres. 8. pu based top coat colour sarson yellow(ral 1021)-8 litres 9. ug ag clear -16 litres 10. pu thinner compatible with pu paint system offered - 40 litres. 11.degreas er - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warran ty period: 30 months after the date of delivery ] ] , supply and application of one coach set pu paints for dmu/dpc 1600 hp ac-ac-demu (igbt) ,memu / dmc coaches as per icf specification icf/md/spec-362,amd-01,amd-02,amd-03 & amd-04 to drg no .530-8-3-001,alt b as detailed below: 1.adhesion promotingprimer -30 litres. 2.light weight body filler - 32 kgs.(to be supplied in 1kgcontainer). 3.pu based surfacer (two pack) on side walls and roof- 40li tres. 4.unsaturated polyester based knifing putty -32 kgs.(to be supplied in1kg container) 5.pu based top coat colour pearl light grey -35ltrs (ral9022). 6. pu based top coat colour signal blue (ral5005) -20 litres 7. ug ag clear-16 litres. 8. pu thinner compatible with pu paint system offered - 40 litres. 9.degre aser - 05 litres. (latest drawing to be obtained from icf design before supply and application) [ warr anty period: 30 months after the date of delivery ] ] , supply and application of one coach set of pu paint for mrm/dtc, mrm/mc & mrm/tc coac hes as per icf specification icf/md/spec-362,amd-01,amd-02,amd- 03 & amd-04 (with latest revision/ame ndment)to drg. no. 651-8-3-001 & marking diagram 651-8-3-002,651-8-3-003 (relavent marking drgs to b e followed for dtc,mc&tc coaches) pcrt of paints : 1.adhesion promoting primer -30 litres. 2.light w eight body filler - 20kgs.(to be supplied in 1kg container). 3.pu based surfacer (two pack) on sidewa lls and roof- 24 litres. 4.unsaturated polyester based knifing putty -40kgs.(to be supplied in 1kg con tainer). 5. pu based top coat colour signalblue(ral-5005)-40 litres. 6. pu based top coat colour silve r grey(ral-7001) - 30 litres 7. pu based top coat colour signal red to spec is-5:537-(ral-7021)- 10 litres. 8. ug ag clear -16 litres. 9. pu thinner compatible with pu paint system offered - 40 litres. 10.degrease r - 05litres. (latest drawing to be obtained from icf design before supply and application) [ warranty period: 30 months after the date of delivery ] ]
Basic Detail
Tender No 06261641
Bidding Type Tender
Location
City Chennai
State Tamil Nadu
Key Dates
Publish Date 22 Jun 2026
Submission Date 13 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 20 Lakhs
Exemption Not Available
Document List
469100c4-2a96-476e-bb02-07117f7e4f64.pdf
5672703.pdf
5672711.pdf
5806400.pdf
5806401.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

469100c4-2a96-476e-bb02-07117f7e4f64.pdf

pdf

5672703.pdf

pdf

5672711.pdf

pdf

5806400.pdf

pdf

5806401.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders