|
| 1 | Replacing of oil filters, Diesel filters, Lube oil with 15W40 grade lube oil, cleaning air element with dry compresed air etc., of 100 KVA Ashok Leyland make DG set complete as required. | Replacing of oil filters, Diesel filters, Lube oil with 15W40 grade lube oil, cleaning air element with dry compresed air etc., of 100 KVA Ashok Leyland make DG set complete as required. |
| 2 | Service charges for carrying out \\"B\\" check including removing burnt oil from sump, refilling new oil, cleaning the DG and DG platform to remove spilled oil etc., including running the DG set on actual load, testing and commissioning etc., complete as required. (Diesel for test run will be proivided by BSNL). | Service charges for carrying out \\"B\\" check including removing burnt oil from sump, refilling new oil, cleaning the DG and DG platform to remove spilled oil etc., including running the DG set on actual load, testing and commissioning etc., complete as required. (Diesel for test run will be proivided by BSNL). |
| 3 | Radiator servicing including dismantling from existing poition, providing cleaning with rust resistant chemical, water pressure etc complete including refixing. | Radiator servicing including dismantling from existing poition, providing cleaning with rust resistant chemical, water pressure etc complete including refixing. |
| 4 | Replacing Radiator water pump including removing existing rused/defective water pump assembly, fixing the new one and testing and commissioning etc., complete as required. | Replacing Radiator water pump including removing existing rused/defective water pump assembly, fixing the new one and testing and commissioning etc., complete as required. |
| 5 | Providing repairs & Servicing of 24V Dynamo including testing and commissioning etc., complete as required. | Providing repairs & Servicing of 24V Dynamo including testing and commissioning etc., complete as required. |
| 6 | Supplying and Fixing oil sump inspection window with packings including removing the existing rusted window etc., complete as required. | Supplying and Fixing oil sump inspection window with packings including removing the existing rusted window etc., complete as required. |