| 1 | O/H of ECP and RTCC Panels | O/H of ECP and RTCC Panels |
| 2 | O/H and preventive maintenance of UAT panel 13A&13B | O/H and preventive maintenance of UAT panel 13A&13B |
| 3 | O/H of GT cooling control cabinet and marshalling box: | O/H of GT cooling control cabinet and marshalling box: |
| 4 | O/H of OLTC control cabinets and marshalling box of UAT: | O/H of OLTC control cabinets and marshalling box of UAT: |
| 5 | O/H & preventive maintenance of PT cubicle JB 1 no. Gen. phase & neutral side JB-2 no. CT JB of UAT-2 no. Inter winding CT JB-1 no. | O/H & preventive maintenance of PT cubicle JB 1 no. Gen. phase & neutral side JB-2 no. CT JB of UAT-2 no. Inter winding CT JB-1 no. |
| 6 | O/H and preventive maintenance of stator water & seal oil system panel (1 job each) | O/H and preventive maintenance of stator water & seal oil system panel (1 job each) |
| 7 | Cleaning & painting work | Cleaning & painting work |
| 8 | Overhauling of Excitation system of 200MW Unit as per scope of work. | Overhauling of Excitation system of 200MW Unit as per scope of work. |
| 9 | Dummy Load Test of Generator Excitation system. | Dummy Load Test of Generator Excitation system. |
| 10 | Dismantling, Overhauling and commissioning of 15.75KV/575V, 2500 KVA Excitation transformer. | Dismantling, Overhauling and commissioning of 15.75KV/575V, 2500 KVA Excitation transformer. |
| 11 | Sealing Packing and welding in GRP Panel to avoid dust/moister ingress | Sealing Packing and welding in GRP Panel to avoid dust/moister ingress |
| 12 | Replacement of Rubber Expansion bellows of UAT 13A&13B | Replacement of Rubber Expansion bellows of UAT 13A&13B |
| 13 | Electrical Wiring of Excitation room Unit-13 | Electrical Wiring of Excitation room Unit-13 |
| 14 | Sealing Packing and welding in Excitation room Unit-13 to avoid dust/moister ingress. | Sealing Packing and welding in Excitation room Unit-13 to avoid dust/moister ingress. |
| 15 | Removal and remounting of new duct CT in place of old CT in UAT duct. | Removal and remounting of new duct CT in place of old CT in UAT duct. |