Bids Are invited for Operation And Maintenance Power House / Power Plant - 1238583 - Pre Overhauling, Centrifuging, Reconditioning Activities And Shifting Of T&Ps. , Draining & Re-Filling Of Approx. 50-60 Oil Drum From Main Tank. , Opening Of Transfo
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Power House / Power Plant - 1238583 - Pre Overhauling, Centrifuging, Reconditioning Activities And Shifting Of T&Ps. , Draining & Re-Filling Of Approx. 50-60 Oil Drum From Main Tank. , Opening Of Transformer Top Cover And Hv Bushing. , Internal Inspection And Testing Of Core Coil Assembly. , Dismantling Of Radiator Panel, Mounting Of Main Tank Cover And Blanking Of Main Tank Butterfly Valve. , Preparation Of Temporary Oven For Heating & Dry Out Process. , Heating And Dry Out Cycle Of Main Tank Core Coil Assembly. , Re-Fixing Of Conservator, Bushings, Radiator Panel Etc. On Main Tank Of The Transformer. , Centrifuging Of Transformer Oil Of Uats Up To Bdv>75Kv. Moisture<7 Ppm. , Complete Overhauling Of Oltc Of Uats. , Painting Of Uats 10A & 10B.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Pre overhauling, centrifuging, reconditioning activities and shifting of T&Ps. | Pre overhauling, centrifuging, reconditioning activities and shifting of T&Ps. |
| 2 | Draining & re-filling of approx. 50-60 oil drum from main tank. | Draining & re-filling of approx. 50-60 oil drum from main tank. |
| 3 | Opening of transformer top cover and HV Bushing. | Opening of transformer top cover and HV Bushing. |
| 4 | Internal inspection and testing of core coil assembly. | Internal inspection and testing of core coil assembly. |
| 5 | Dismantling of radiator panel, mounting of main tank cover and blanking of main tank butterfly valve. | Dismantling of radiator panel, mounting of main tank cover and blanking of main tank butterfly valve. |
| 6 | Preparation of temporary oven for heating & dry out process. | Preparation of temporary oven for heating & dry out process. |
| 7 | Heating and dry out cycle of main tank core coil assembly. | Heating and dry out cycle of main tank core coil assembly. |
| 8 | Re-fixing of conservator, bushings, radiator panel etc. on main tank of the transformer. | Re-fixing of conservator, bushings, radiator panel etc. on main tank of the transformer. |
| 9 | Centrifuging of transformer oil of UATs up to BDV>75KV. Moisture<7 PPM. | Centrifuging of transformer oil of UATs up to BDV>75KV. Moisture<7 PPM. |
| 10 | Complete Overhauling of OLTC of UATs. | Complete Overhauling of OLTC of UATs. |
| 11 | Painting of UATs 10A & 10B. | Painting of UATs 10A & 10B. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender