| 1 | Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m |
| 2 | All Kind of soil 80% |
| 3 | Ordinary Rock 20% |
| 4 | Dumping /Filling of stones in horizontal level including cost of stone |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand (zone-III) derioved from natural sources: 6 graded stone aggregate 20mm nominal size derived from natural sources) (Crushed) |
| 6 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 course sand and 3 graded crushed stone agg. 20mm nominal size. (crushed) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level,excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (Crushed) |
| 8 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. |
| 9 | Centering and shuttering including strutting, propping etc. and removal form for:-charge |
| 10 | Walls (any thickness) including attached pilasters buttresses, plinth and string course etc. |
| 11 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 with angle iron post and flat iron including nuts, bolts and washers and Painting complete as per the direction of Engineer-in-charge. |
| 12 | Providing and fixing of 2\\" x 2\\" mesh size chainlink fencing including all fixing accessories and priming and painting etc complete |
| 13 | Carriage of material from source to site of work including loding un loading and stacking complete |
| 14 | (i)Stone by an avg lead of 05 Km by MT 150 Mtr by Head load |
| 15 | (ii)(Sand / Aggregate.) by an avg lead of 20 Km by MT 150 Mtr by Head load |
| 16 | (iii)Cement by an avg lead of 20 Km by MT 150 Mtr by Headload |
| 17 | (iv)Steel 20 Km by MT and 150 Mtr by Headload Please Enable Macros to View BoQ information |