Name of Work:- RE-INTEGRITY ASSESSMENT OF AGCLs 32 N.B. X 1 KM LONG CS NATURAL GAS PIPELINE FOR EXTENSION OF ECONOMIC LIFE
Sl. No.
Item Description
1
DIRECT ASSESSMENT (DA) SURVEY of NATURAL GAS PIPELINES .For 32” N.B. X 1km Length Natural Gas Pipeline
2
Conduct Integrity Inspection for AGCL's pipeline inclusive of all four steps of Direct Assessment (ECDA, ICDA, SCCDA) Methodogy i.e. Pre-Assessment, Indirect Inspection, Direct Examination and Post Assessment. Based on that report, Conduct detailed NDT and assist in Defect Rectification works (if found) for enhancing the economic life of the pipeline for a minimum additional block of 3 years from its already available remaining life. Defect rectification (if found any) will be on AGCL’s scope. After defect rectification, evaluate the remaining life of the pipeline and submit remaining life, safe pressure and fit for use certificate. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.