|
| 1 | Material Part of 63kVA DTR (TS No. 17/2026-27 WBS No. D-26-0355) |
| 2 | Prov. Muff with Cement Concrete filling |
| 3 | Prov. C.I. X-Arm (100X50X5mm), Length : Length: 2800 mm X 2 Nos. for Incomer line |
| 4 | Prov. M S A.I X Arm (50X50 X 6 mm) Length : (2800 mm x 1 No. for LA's |
| 5 | Prov. M S C.I. (75X40 X4.8 mm), Length : 2800 mm X 4 Nos for supporting DO fuse unit & G.O. Switch |
| 6 | Prov. C.I. X-Arm (100X50X6 mm), Length : Length: 2800 mm X 2 Nos. for Transformer / CT-PT Bed |
| 7 | Prov. C.I (100X50 X 6 mm), Length : 460 mm X 2 Nos. for supporting Main Channel of Transformer/ CT-PT |
| 8 | Prov. M S A.I (50X50x 6 mm), Length: 2800 mm X 2 Nos. |
| 9 | Prov. M S A.I (35X35X 6 mm) Length: 460 mm X 2 Nos. |
| 10 | Prov. M S A.I (50X50x 6 mm), Length: 950 mm X 2 Nos. |
| 11 | Prov. M S A.I (50X50x 6 mm), Length: 2800 mm X 2 Nos. |
| 12 | Prov. M S A.I (50X50x 6 mm), Length: 450 mm X 1 Nos. |
| 13 | Prov. M S Chanel Iron (75X40x 4.8 mm), Length: 460 mm X 1 Nos. for G.O. Switch handle supporting |
| 14 | Prov. G.O. AB Switch Unit ( 11kV, 400A 25 KA ) Tripple Poles O/D Type |
| 15 | Prov. D.O.Fuse Unit |
| 16 | Prov Lightning Arrestor Surge Arrester, 9kV Station Class (Porcelain Type ) |
| 17 | Prov. Discs Insulator sets (Comprising 1 No. Disc: ^^ (Porcilain, BS, 12 kV 90 kN) i/c Dead End Clamps etc.) |
| 18 | Prov. Stay Set complete (i/c stay clamp) |
| 19 | Prov. Pipe Earthing set |
| 20 | LT Distribution Panel box for 63KVA DTR (MS Sheet od 1.6 mm (900x800x200mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted/powdercoated after primar coating etc allied assembly MCCB 100 amp 3P 35kA , ICS=100 % ICU, KIT |
| 21 | Prov. AAA Cond. 7/3.15 mm (50 mm2) |
| 22 | Prov. Half Clamp with Nuts & Bolts (M.S. Flat Iron 50X6 mm) |
| 23 | Prov. Full Clamp with Nuts & Bolts ( M.S. Flat Iron 50X6 mm ) |
| 24 | Prov. Nuts and Bolts of Various Sizes Galvanised / Coated) (Prefeably 16 mm ɸ or more with flat and Spring Washers) |
| 25 | Prov. Alluminium Thimble |
| 26 | Prov. Copper Thimble 95amp |
| 27 | Prov. Danger Plate |
| 28 | Prov. Chain Link Fencing, Angle Iron, Gate etc. for CT-PT fencing |
| 29 | Prov. Energy Meter 3Phase 4 wire CT Operated Static Trivector Meter with Box (CT-100/5 Amps. DLMS compliant 0.5S Category-C Type for 11/.4 KV, 63KVA. |
| 30 | Prov. Aluminium Paint |
| 31 | Prov. Red Oxccide Primer |
| 32 | LT Switched Capicitors bank 27- KVAr for 63 KVA (Rate per KVAr) |
| 33 | Material Part of HT line (TS No. 17/2026-27 WBS No. D-26-0355) |
| 34 | Prov. RCC Muff with concerete filling |
| 35 | Disc insulator sets (comprising 1 No. Disc (Porcelain, BS, 12 KV, 90Kn) including Dead End Clamps etc. |
| 36 | Prov. 11 KV pin insulator with pin |
| 37 | Prov. Stay set H.T. comp. |
| 38 | GO AB Switch Unit (11 KV. 400A. 11 KV ) |
| 39 | Prov.MS [ Channel iron (100x50x5mm), Length:1270 mm |
| 40 | Prov. X arm [ Channel iron (75x40x4.8mm), Length:460mm |
| 41 | Prov. MS [ Channel iron (100x50x5mm), Length:2400 mm |
| 42 | Prov. MS[ Channel iron (100x50x5mm), Length:2800 mm |
| 43 | GO switch Handle supporting [Chhanel iron Length:460 mm |
| 44 | Prov. Knee Bracing: [Angle Iron (50x50x6mm), (Length 2x750 mm) |
| 45 | Prov. X-Bracing Set - MS Angle Iron: 50x50x6,(2700*2) |
| 46 | Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(1500*2) |
| 47 | Eye Hook for Earth wire |
| 48 | Prov. HT Earthing set complete |
| 49 | Prov. Half Clamps |
| 50 | Prov.Full Clamps |
| 51 | Prov. Barbed wire |
| 52 | Prov. Danger plate |
| 53 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 54 | Red oxide |
| 55 | Prov. Aluminium paint |
| 56 | Prov. 11KV XLPE cable 3 X 95 mm XLPE(11 kV, Al, Armoured |
| 57 | Anchoring assembly for HT |
| 58 | Suspension assembly |
| 59 | Material Part of LT line (TS No. 17/2026-27 WBS No. D-26-0355) |
| 60 | Prov. S/T Poles 9 mtr.long |
| 61 | Prov. RCC Muff with concerete filling |
| 62 | Earth hook |
| 63 | Shackle insulator |
| 64 | D-iron |
| 65 | Prov. L.T. Stay set Complete |
| 66 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 67 | Prov. Aluminium Paint |
| 68 | Erection Part of 63kVA S/Stn (TS No. 17/2026-27 WBS No. D-26-0355) |
| 69 | Erection of 63 KVA 11/0.4 KV Transformer , erection of ST Pole, Painting of Pole, erection of stay, transformer earthing, LT Penal Box, Energy meter ,LT Cable including loading and unloading Transformer complete in all respect |
| 70 | Erection Part of HT Line (TS No. 17/2026-27 WBS No. D-26-0355) |
| 71 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 72 | Erection of ST pole 11/9 mtr ,muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 2400*100*50mm /1500*100*50mm for Double pole structure , drilling of holes in pole and -X-arm etc, disc insulators with complete fitting, pin insulator with pin, AI -X- bracing set, barbed wire, danger plate, MS Full and half clamps, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 73 | Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 74 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect. |
| 75 | Erection for XLPE (Overhead) Cable |
| 76 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 77 | Erection Charges for G.O Switch |
| 78 | Erection Part of LT Line (TS No. 17/2026-27 WBS No. D-26-0355) |
| 79 | Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect |
| 80 | Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect |
| 81 | Erection AAAC 7/3.15 (50mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. (Single Conductor P/kM) |
| 82 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 83 | Manual carriage for above material (Av. Lead 0.100 Km.) Please Enable Macros to View BoQ information |