| 1 | Working charges |
| 2 | 100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia. |
| 3 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 5 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 6 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 7 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 8 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. |
| 9 | 100.98.1008:Engaging Coolie. |
| 10 | OD193190/2025-2026:Interconnection of newly laid 63mm PVC pipe with existing 110mm PVC pipeline using suitable PVC/MS saddle clamp and suitable specials etc., including charges of all materials, labour, hire charges etc., complete as per the direction of departmental officers in charge. |
| 11 | OD193191/2025-2026:Shifting the public hydrants/house connections with 25 mm uPVC pipe from the existing line to the newly laid 160/110/90/ 63mm PVC/HDPE line using suitable PVC clamp,25mm PVC adapter, 25mm PVC bend,25mm uPVC pipe etc.(after disconnecting the existing connection) including cost and conveyance of all materials and labour charges for earthwork, taking connection from the main line line etc. as per the direction of deptl. officers |
| 12 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) Please Enable Macros to View BoQ information |