Tender For Supply, Erection, Testing And Commissioning For Shifting Of 132 Kv D/C Ctps-Rajabera Transmission Line Due To Buttressing And Further Raising Of Existing Ash Dykes Of Ctps.

Issued by Boards / Undertakings / PSU · Bokaro, Jharkhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Aug 2026
3 days left
EMD
3.37 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bokaro → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Supply, Erection, Testing And Commissioning For Shifting Of 132 Kv D/C Ctps-Rajabera Transmission Line Due To Buttressing And Further Raising Of Existing Ash Dykes Of Ctps.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Jun-2026 Techno Commercial and Pre Bid Format Other 20-Jul-2026
2 20-Jul-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 27-Jul-2026
3 26-Jun-2026 Techno Commercial and Pre Bid Format Other 27-Jul-2026
4 27-Jul-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 03-Aug-2026
5 26-Jun-2026 Techno Commercial and Pre Bid Format Other 03-Aug-2026
6 03-Aug-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 10-Aug-2026
7 26-Jun-2026 Techno Commercial and Pre Bid Format Other 10-Aug-2026

BOQ

Name of Work:- Supply, erection, testing and commissioning for shifting of 132 KV D/C CTPS-Rajabera transmission line due to buttressing and further raising of existing ash dykes of CTPS.
Sl. No. Item Description
1Supply, erection, testing and commissioning for shifting of 132 KV D/C CTPS-Rajabera transmission line due to buttressing and further raising of existing ash dykes of CTPS.
2AAAC Panther (37/3.15 mm) as per specification
3Earth Wire (7/3.15mm) as per the Specification
424 Fibre (DWSM) OPGW Fibre optic cable as per the Specification
5132 KV Composite Polymer insulator, 70 KN
6132 KV Composite Polymer insulator, 120 KN
7Single Suspension Hardware set with Armour grip suspension clamp and Preformed Armour rods suitable for AAA Panther Conductor (37/3.15 mm) / ACSR Lark Conductor (30/2.92 mm & 7/2.92 mm) and suitable for fixing on 132 KV Tower (failing load 70KN)
8Double Suspension Hardware set with Armour grip suspension clamp and Preformed Armour rods suitable for AAA Panther Conductor (37/3.15 mm) / ACSR Lark Conductor (30/2.92 mm & 7/2.92 mm) and suitable for fixing on132 KV Tower (failing load 70KN)
9Single Tension Hardware set with compression type tension clamp suitable for AAA Panther Conductor (37/3.15 mm) / ACSR Lark Conductor (30/2.92 mm & 7/2.92 mm) and suitable for fixing on 132 KV Tower (failing load 120KN)
10Double Tension Hardware set with compression type tension clamp suitable for AAA Panther Conductor (37/3.15 mm) / ACSR Lark Conductor (30/2.92 mm & 7/2.92 mm) and suitable for fixing on 132 KV Tower (failing load 120KN)
11Pilot Insulator Hardware set complete with suspension clamp suitable for AAA Panther Conductor (37/3.15 mm) / ACSR Lark Conductor (30/2.92 mm & 7/2.92 mm) and suitable for fixing on 132 KV Tower (failing load 70KN)
12Vibration damper suitable for AAAC Panther (37/3.15 mm)
13Mid span compression joint for AAAC Panther (37/3.15 mm)
14Repair Sleeve suitable for AAAC Panther (37/3.15 mm)
15Tee connector (AAAC Panther to AAAC Panther Conductor)
16T-connector for ACSR Lark to AAAC Panther conductor
17Suspension clamp assembly for Earth Wire (7/3.15mm) with flexible copper bond for earthing
18Tension clamp assembly with earthing bonds for Earth Wire(7/3.15mm).
19Vibration damper for Earth Wire(7/3.15mm).
20Mid span compression joint for Earth Wire(7/3.15mm).
21Repair Sleeve suitable for Earth Wire(7/3.15mm).
22Double Tension assembly for OPGW
23Suspension Clamp Assembly OPGW
24OPGW-OPGW 3-way junction box
25Vibaration damper for OPGW
26Down lead clamp OPGW
27Tension Assembly of OPGW for suspension tower
28Barbed Wire
29Earthing Materials for 132 KV tower
30Pipe type Earthing Materials (Galvanised)
31Counterpoise type Earthing Materials (Galvanised)
32Danger plate
33Number Plate
34Phase Plate (one set comprises of three)
35Circuit Plate
36Bird Guard for 132 KV suspension tower
37Anticlimbing Device (without barbed wire).
38Supplying, Fabricating & Galvanising various tower members / structures / gantries / extensions etc. including supply of pack washers, Hangers, D-Shackles, Extension links, U-bolts etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete bolted and / or welded connections with G.I. bolts, nuts, washers, etc. complete as per drgs specifications & directions. (supply of G.I. bolts, nuts, step bolts & spring washers will be paid separately )
39Mild Steel as per Grade Designation E250A ( Fe410W)
40High Tensile Steel as per Grade Designation E350 ( Fe490)
41Supplying, Fabricating & Galvanising stub & cleat members of various type of tower members / structures etc. including supply of pack washers etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete as per drgs specifications & directions. (supply of G.I. bolts, nuts & spring washers will be paid separately)
42Mild Steel as per Grade Designation E250A ( Fe410W)
43High Tensile Steel as per Grade Designation E350 ( Fe490)
44Supplying & Fabricating Holding down / foundation steel bolts including threading as required etc. complete with all necessary nuts plate washers etc. complete. The 200 mm top portion of bolt is to be galvanised.
45Supply of GI Bolts, Nuts (Grade-5.6) with spring washers of assorted sizes for towers including step bolts etc complete as per drgs., specifications and directions.
46Supply of GI Bolts, Nuts (Grade-8.8) with spring washers of assorted sizes for towers including step bolts etc complete as per drgs., specifications and directions.
47Survey
48Detail survey including preliminary survey(plotting on route in toppo sheet), plotting of towers in the route profile, preparation and submission of profile drawing, line chart, tower schedule etc. all complete for approval.
49Check survey including preparation & submission of survey chart, line chart, Route profile & Tower spotting, etc. with all details as specified along with completion of peg marking and submission of approved report along with profile drawings, line chart, towert schedule etc. all complete for approval.
50Forest survey as mentioned in specification
51Grounding of Tower with
52GI pipe, GI flats etc. as per drawing, including excavation, backfilling, levelling and cost of storing, handling & transportation of materials to site complete as per drawing, specification and directions.
53Counter poise earthing including excavation and backfilling, levelling and cost of storing, handling & transportation of materials to site complete as per drawing, specifications and directions.
54Stringing and sagging of 6 nos. power conductors (AAAC Panther 37/3.15mm) including hoisting and fixing of Insulators on the 132KV towers/gantries, erection of hardware sets, running out and laying out of conductors, tensioning and clipping in with clamps, erection of jumpers at the section/angle towers, jointing & repairing of conductors, fixing of vibration dampers, preformed armour rods, bird guards, and including erection of number plates, danger plates, phase plates, circuit plates, step bolts and anticlimbing devices with barbed wire etc on each tower complete in all respect and as per specification & directions including transportation of all materials to the site per route Kilometer of the line.
55Stringing and sagging of 4 nos. power conductors (AAAC Panther 37/3.15mm) including hoisting and fixing of Insulators on the 132KV towers/gantries, erection of hardware sets, running out and laying out of conductors, tensioning and clipping in with clamps, erection of jumpers at the section/angle towers, jointing & repairing of conductors, fixing of vibration dampers, preformed armour rods, bird guards, and including erection of number plates, danger plates, phase plates, circuit plates, step bolts and anticlimbing devices with barbed wire etc on each tower complete in all respect and as per specification & directions including transportation of all materials to the site per route Kilometer of the line.
56Stringing and sagging of 3 nos. power conductors (AAAC Panther 37/3.15mm) on one side of tower X arm including hoisting and fixing of Insulators on the 132KV towers/gantries, erection of hardware sets, running out and laying out of conductors, tensioning and clipping in with clamps, erection of jumpers at the section/angle towers, jointing & repairing of conductors, fixing of vibration dampers, preformed armour rods, bird guards, and including erection of number plates, danger plates, phase plates, circuit plates, step bolts and anticlimbing devices with barbed wire etc on each tower complete in all respect and as per specification & directions including transportation of all materials to the site per route Kilometer of the line.
57Dismantling of 4 nos power conductor(ACSR LARK/AAAC PANTHER) in existing double circuit 132 KV transmission line of DVC keeping the other circuit in the tower in charged/shut down condition at the same time including release of all Insulators, Hardware & accessories without any jerk and damage to the cross arm and if required recoiling, transportation of all dismantled conductors & line materials to DVC specified store in all complete as per direction of the Engineer in charge.
58Dismantling of 3 nos power conductor(ACSR LARK/AAAC PANTHER)in one circuit of existing double circuit 132 KV transmission line of DVC keeping the other circuit in the tower in charged/shut down condition at the same time including release of all Insulators, Hardware & accessories without any jerk and damage to the cross arm and if required recoiling, transportation of all dismantled conductors & line materials to DVC specified store in all complete as per direction of the Engineer in charge.
59Stringing and sagging of 1 (one) no. Galvanised Stranded steel wire as Earth wire (7/3.15 mm) including laying, stringing, tensioning, clamping, jointing etc. complete in all respect including cost of storing, handling, transporting of all materials to site per route Kilometer of the line including fixing of hardwares, vibration damper and/or armour rods etc.
60Dismantling of one no earth wire from tower line including release of all hardware & accessories and transportation of all dismantled earth wire and line materials to DVC's specified store as per spec. and direction of the Engineer I/C.
61OPGW Erection & Commissioning work
62OPGW Team Mobilisation
63OPGW De-stringing complete in all respect including release of all hardware & accessories and transportation of all dismantled OPGW and line materials to DVC's specified store as per spec. and direction of the Engineer I/C.
64Stringing of OPGW cable and fixing of requisite accessories including transportation of materials to site complete as per specification and directions.
65OPGW Splicing & Testing
66Service charges to get the following proposal cleared as mentioned in specification.
67PTCC Clearance
68Forest Clearance
69Railway Crossing Clearance
70Survey
71Detail survey including preliminary survey(plotting on route in toppo sheet), plotting of towers in the route profile, preparation and submission of profile drawing, line chart, tower schedule etc. all complete for approval.
72Check survey including preparation & submission of survey chart, line chart, Route profile & Tower spotting, etc. with all details as specified along with completion of peg marking and submission of approved report along with profile drawings, line chart, towert schedule etc. all complete for approval.
73Earth work in excavation in foundation trenches, drains etc. including dressing of sides & ramming of bottoms, lift upto 3.0 meter, including pit marking, dewatering, getting out the excavated soil & disposal of surplus excavated soils as directed within a lead of 50 meter complete as per specifications, drawing & instruction of Engineer-in -Charge
74Ordinary soil
75Slushy soil
76Hard soil mixed with gravel & moorum
77Soft rock
78Hard rock ( requiring blasting)
79Hard rock ( blasting prohibited )
80Extra over item (2) above for excavation in foundation for every additional lift of 1.5 meter or part thereof over the initial lift of 3.0 meter
81Ordinary soil
82Slushy soil
83Hard soil mixed with gravel & moorum
84Soft rock
85Hard rock ( requiring blasting)
86Hard rock ( blasting prohibited )
87Earthwork in filling in excavated pits, trenches, plinth & sides of foundation etc. in layers not exceeding 200 mm in depth, consolidating & dressing each deposited layer by ramming & watering, including cost of supply & carriage of materials etc. complete as per drgs., specifications & directions.
88with earth obtained from excavation of foundation ( excluding rock)
89with sand including cost of material & transportation of material to site
90with earth obtained from borrow pits within a lead of 500m. inclusive of excavation & carriage / haulage / transportation. (No extra claim will be entertained for earth obtained beyond a lead of 200 M)
91Fitting of template(SST) & setting of stub, 4 stubs / tower - only stubs to be supplied by DVC free of cost :
92132 KV D/C A type suspension tower (maximum deviation 2o)
93132 KV D/C S type angle tower (maximum deviation 15o)
94132 KV D/C B type angle tower (maximum deviation 30o)
95132 KV D/C C type angle tower (maximum deviation 60o)
96132 KV D/C D type angle tower (maximum deviation 90o)
97Fitting of template(SST) & setting of stub, 4 stubs / tower by first section method-only stubs to be supplied by DVC free of cost :
98132 KV D/C A type suspension tower (maximum deviation 2o)
99132 KV D/C S type angle tower (maximum deviation 15o)
100132 KV D/C B type angle tower (maximum deviation 30o)
101132 KV D/C C type angle tower (maximum deviation 60o)
102132 KV D/C D type angle tower (maximum deviation 90o)
103Supplying, straightening, cutting, bending, cranking, hooking, fixing, binding & placing at any position in superstructure, fdn., & plinth with MS / Torsteel reinforcements in all works of concrete, masonry etc, including supply of binding wire with 18 SWG (1.05mm) galvanised wire twisted tight and / or welding the splices where necessary as per IS codes or direction and holding in position with steel rod spacer / chairs / horses etc. complete.
104Hiring, erecting, centering, supporting, striking, cleaning etc. of formwork of approved design with staging, props and supports for plain & RCC works with all accessories and at all heights including removal of forms as per drawings, specifications & directions.
105Charges for shoring & strutting of pits including cost of materials required for this purpose & fixing in position during excavation and/or concreting works as per specifications and directions.
106Providing & laying in position Plain cement concrete in foundation & plinth with coarse sand derived from natural sources & 20 mm. & down stone aggregates of approved quality, well graded, washed and screened including supply of all materials, cost of transport of all materials to site, mixing, laying, vibrating, curing etc. complete but excluding centering & shuttering as per drawings, specification & direction with:
107Mix 1: 4 :8
108Mix 1 :3 :6
109Mix 1 :2 :4
110Providing & laying in position Reinforced Cement concrete work in pyramid & chimney of tower foundation & plinth, with coarse sand from natural sources & 20 mm. & down stone aggregates of approved quality, well graded, washed and screened including cost of supply of all materials and cost of transport of all materials to site., mixing, laying, vibrating, curing etc. complete & also including erection, supporting, striking out, cleaning etc. of steel muff-boxes, but excluding the cost of reinforcement and muff-boxes / formwork as per drgs., specifications & directions with :
111Concrete mix 1: 1.5 : 3
112Concrete mix 1: 1 : 2
113Providing & laying in position Reinforced Cement concrete work in stepped foundation & plinth, with coarse sand from natural sources& 20 mm. & down stone aggregates of approved quality, well graded, washed and screened including cost of supply of all materials and cost of transport of all materials to site., mixing, laying, vibrating, curing etc. complete but excluding the cost of reinforcement and formwork as per drgs., specifications & directions with :
114Concrete mix 1: 1.5 : 3
115Concrete mix 1: 1 : 2
116Providing and laying in position ready mixed or site batched design mix cement concrete of M25 grade with minimum cement content of 330 kg /cum for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS:9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; (Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.)
117All works upto plinth level
118Add for using extra cement in the item 12 of design mix over and abovethe specified cement content therein
119Providing & laying in position Reinforced Cement concrete work with coarse sand from natural sources & 20 mm. & down stone aggregates of approved quality, well graded, washed and screened including cost of supply of all materials and cost of transport of all materials to site., mixing, laying, vibrating, curing etc. complete but excluding the cost of reinforcement and formwork as per drgs., specifications & directions in superstructure with :
120Concrete mix 1: 1.5 : 3
121Concrete mix 1: 1 : 2
122Transporting, Handling, Assembling & Erecting of tower members (HT & MS ) / structures / gantries / body extensions of all types of tower etc from stores & /or site with contactors' own tools & tackles, crane & labour, including fitting, checking, punching & tack welding of bolts & nuts and / or connections upto bottom cross arm including aluminium painting of tack welded bolt & nuts but excluding fitting & fixing of Number Plates, Danger Plates, Phase Plates, Circuit Plates, Bird Guards, Anti Climbing Devices etc. complete as per drg., specifications & directions (Tower members, gantries, accessories, fasteners etc. are to be supplied by DVC free of cost from DVC stores at MAITHON or any other specified stores)
123Providing, supplying and laying of 20cm thick second class brick pitching (brick on edge over one brick flat pitching) on slopes of embankment canal etc. in 1:4 cement mortar in both layers, curing, preparing base to proper level of slope, with weep holes at a spacing of 1.8 meter horizontally and 0.9 meter vertically or as shown in the drawing complete (with pointing 1:3)
124Providing, supplying and laying of rubble pitching (thickness varying from 150mm to 300mm) with stone boulder including hand packing and caulking with cement concrete (1:3:6), 0.15 cu.m. per cum of boulder pitching with 20mm and down stone chips including making weep holes at a spacing of 180 cm. horizontally and 90 cm. vertically including rough dressing of the slope for pitching, packing of the back of weep holes etc. complete.
125Providing, supplying and laying of random rubble pitching with stone boulder of approved quality and size and packed as per direction etc. complete.
126Dismantling, taking out, removing, stacking, disposal of unserviceable materials and transportation of salvaged items to designated DVC stores, including loading / unloading etc. all complete of following substructures and superstructures at all elevations as per direction of Engineer-in-Charge :
127R.C.C. work including stacking of reinforcement
1281:3:6 or richer mix Cement concrete work
1291:4:8 or leaner mix Cement concrete work
130Masonry work in cement mortar
131Steel work in built-up sections including dismembering
132Fencing post / Strut including concrete dismantling & Earthwork
133Carrying out necessary field test for soil samples, preparation and submission of soil testing report in triplicate giving results of investigation and related reasons qualitatively, expected settlement and recommendation for bearing capacity at different level by conducting laboratory test on soil samples as per relevant practice:
134Determination of crushing strength of soil samples.
135Determination of modulus of sub-grade reaction(k), modulus of elasticity (E), Poisson’s Ratio (µ)
136Moisture absorption test and porosity
137Bulk density, natural moisture content, dry density, relative density and specific gravity.
138Standard Penetration Test (SPT)
139Transporting, assembling, placing and fixing in position steel holding down/ foundation bolts including threading as required etc with all necessary nuts and plate washer etc. per bolt complete as per drawing and direction of Engineer-in-charge. The 200mm top portion of the bolt is to be galvanised.
140Erection of Rail Pole (105 lb) structure including Pit marking, excavation in all types of soil (including hard rock) upto required level, concreting with 1:2:4 mix cement concrete (over 75 mm. thick PCC of mix 1:3:6), plastering with 1:6 cement mortar and cement punning, fabrication of cross-arm, bracing, clamp including hoisting and fixing in position with packing pieces, spacers, clamps, bolts, nuts, fish plates(if required) etc. including Tack welding of bolts and nuts in half round fashion upto bottom cross arm of Rail pole and backfilling complete with all respect as per drawing, specification and direction of DVC Engineer including supply of all materials (except 105 lb Rail poles which will be supplied by DVC free of cost) and storing, handling and transportation of materials from DVC's store .
141Four pole location for D/C line: normal
142Four pole location for D/C line: normal + upto 6.0 meter extension
143Stay fixing including marking of location, excavation in all kinds of soil (including hard rock) upto the required level concreting with 1:3:6 cement concrete mix, backfilling, fabrication of clamps and fixing of stay sets, stay wires complete in all respect as per drawing, specification and direction of DVC Engineer-in-charge including supply of all materials (size of the excavation pit 0.60 meter X 0.60 meter X 1.00 meter)
144Erection of cradle guard over P&T line, road crossing and power line crossing etc. including fabrication and fixing of craddle guard cross-arm, \\"I\\" bolt etc. including supply of all materials as required and including handling and transportation of materials to site as per specification, drawing, regulation and direction of the Engineer-in-charge.
145Painting of complete Rail pole structure with black anti-corrosive (two coats upto 2'0\\" from PL), red oxide (two coats), Alluminium paints (two coats above 2'0\\" from PL to top of Rail) including cleaning of surface and supply of paints of approved quality alongwith all other materials as per drawing and direction of DVC Engineer-in-charge.
146Four pole location for D/C line: normal
147Four pole location for D/C line: normal + upto 6.0 meter extension
148MS structural work with rolled structural members (e.g. angle, Tee, flat etc.) connected to one another with gusset, cleat, bolt, nut, etc., complete including fabrication, assembling, hoisting, erection of materials, supply of required bolts & nuts for earth wire fixing arrangement in Rail poles as per drawing, including supply of all materials.
149Supplying & providing 25 mm thk. grouting by using ready mix grout like SHRINKKOMP, CONBEXTRA GP2, SIKA GROUT 214 or equivalent for miscellaneous base plates, foundation bolts, pipe sleeves, pockets, holes etc. at all heights, location etc, complete as per drg. specifications & directions.
150AAAC Dog (19/2.89 mm) as per specification
151Earth Wire (7/3.15mm) as per the Specification
15233 KV Composite Polymer insulator, 70 KN
15333 KV Composite Polymer pin type insulator, 10 KN
154Single Tension Hardware set with compression type tension clamp suitable for AAAC Panther and suitable for fixing on 132 KV Tower (failing load 120KN)
155Double Tension Hardware set with compression type tension clamp suitable for AAAC Panther and suitable for fixing on 132 KV Tower (failing load 120KN)
156Mid span compression joint for AAAC Dog
157Repair Sleeve suitable for AAAC Dog
158Barbed Wire
159Danger plate
160Number Plate
161Phase Plate (one set comprises of three)
162Circuit Plate (one set comprises of two)
163Anticlimbing Device (without barbed wire).
164Supply MS Channel(100x50, 100x75 mm)/ MS Angle(65x65x6, 75x75x6, 50x50x6 mm) MS Plate(6/8/10/12/16 mm) etc. as per requirement
165Rail pole of 105 lb per yard/120 lb per yard (12meter & above rail pole)
166Survey
167Detail survey including preliminary survey(plotting on route in toppo sheet), plotting of towers in the route profile, preparation and submission of profile drawing, line chart, tower schedule etc. all complete for approval.
168Check survey including preparation & submission of survey chart, line chart, Route profile & Tower spotting, etc. with all details as specified along with completion of peg marking and submission of approved report along with profile drawings, line chart, towert schedule etc. all complete for approval.
169Forest survey as mentioned in specification
170Laying & Stringing and sagging of 6 nos. power conductors (AAAC DOG 19/2.89mm) in double circuit including hoisting and fixing of Insulators on the rail pole structure/tower, erection of hardware sets, running out and laying out of conductors, tensioning and clipping in with clamps/pin insulators, erection of jumpers at the section/anglelocations and hoisting and fixing of suspension insulator sets or pin insulator, jointing & repairing of conductors, fixing of vibration dampers, preformed armour rods, etc on each tower/rail pole complete in all respect and as per specification & directions including transportation of all materials to the site and felling down of trees as per regulation.
171Laying & Stringing and sagging of 3 nos. power conductors (AAAC DOG 19/2.89mm) in double circuit including hoisting and fixing of Insulators on the rail pole structure/tower, erection of hardware sets, running out and laying out of conductors, tensioning and clipping in with clamps/pin insulators, erection of jumpers at the section/anglelocations and hoisting and fixing of suspension insulator sets or pin insulator, jointing & repairing of conductors, fixing of vibration dampers, preformed armour rods, etc on each tower/rail pole complete in all respect and as per specification & directions including transportation of all materials to the site and felling down of trees as per regulation.
172Dismantling of all types of rail poles/steel structures(already erected) by cutting the rail poles exposed above ground level with the help of welding gas along with all the fittings e.g angles, channels & clapms including transportation of all the dismantled materials to DVC specified stores.
173Dismantling of 3 nos power conductor(LARK/PANTHER/DOG)in one circuit of existing double circuit 33 KV transmission line of DVC keeping the other circuit in the tower in charged/shut down condition at the same time including release of all Insulators, Hardware & accessories without any jerk and damage to the cross arm and if required recoiling, transportation of all dismantled conductors & line materials to DVC specified store in all complete as per direction of the Engineer in charge.
174Erection of Rail Pole (105 lb) structure including Pit marking, excavation in all types of soil (including hard rock) upto required level, concreting with 1:2:4 mix cement concrete (over 75 mm. thick PCC of mix 1:3:6), plastering with 1:6 cement mortar and cement punning, fabrication of cross-arm, bracing, clamp including hoisting and fixing in position with packing pieces, spacers, clamps, bolts, nuts, fish plates(if required) etc. including Tack welding of bolts and nuts in half round fashion upto bottom cross arm of Rail pole and backfilling complete with all respect as per drawing, specification and direction of DVC Engineer including supply of all materials and storing, handling and transportation of materials from DVC's store .
175One pole tangent for S/C line + up to 3.0 m extension
176Two pole location for D/C line: normal
177Two pole location for D/C line: + up to 6.0 m extension
178Four pole location for D/C line: normal
179Four pole location for D/C line: normal + upto 6.0 meter extension
180Stay fixing including marking of location, excavation in all kind of soil (including hard rock) up to the required level concreting with 1:2:4 cement concrete mix, back filling, fabrication of clams and fixing of stay sets, stay wires complete in all respect as per drawing, specification and direction of Engineer in- charge including supply of all materials (size of the excavatio pit 0.6mx0.6mx1.0m)
181Rail Pole foot earthing (a) Excavation of all kind of soil of size 0.61x0.61x1.5 meter, (b) filling of excavated pits as mentopned above up to 0.9 meter height from bottom with alternate layer of mixture of charcoal and salt as per drawing, specification and direction of Engineer-in-charge. (c) Placing of C.I plate(450x450x10 mm.) in its position after fastening one end of G.I. wire(3.50 meter long) with (50X12.5 mm) nuts and bolts and drilling holes in the Rail pole and fixing other end of G.I wire(8 SWG) with Rail pole with 50 X12.5 mm. size nuts and bolts, (d) Refilling of excavated pits above the mixture of charcoal and salt by soil including watering, ramming etc., (e) Covering of exposed positioning of G.I wire from the top of excavated pits to Rail poles after digging (approx 0.25 meter) in such a fashion thet G.I wire is not visible. It includes supply of all materials like G.I wire (8 SWG)/flat, C.I plates and required no nuts and bolts, charcoal, salt etc.
182Service charges to get the following proposal cleared as mentioned in specification.
183Railway Crossing Clearance
184Stringing and sagging of earthwire(7/3.15 mm. galvanized steel wire) including laying, stringing, tensioning, clamping, jointing etc. complete including transportation of all materials to site, storage & handling per route KM of the line and fixing of hardwares, compression jointing complete in all respect as per direction of engineer-in-charge.
185Erecting and stringing of Cradle Guard where required as per direction of Engineerin- Charge. The main guard wire shall be of size 8 SWG-2 Nos( for both side length) and 10 SWG GI wire at the length of 70cms apart from each other between main side wires horizontally for erecting net type shape so as to prevent overhead conductor against free falling to the ground in case of breakage ( necessary wire will be supplied by the party/agency free of cost) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56108206
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 10-08-2026
Authority
Authority Name Damodar Valley Corporation
Work Description Tender for Supply, Erection, Testing And Commissioning For Shifting Of 132 Kv D/C Ctps-Rajabera Transmission Line Due To Buttressing And Further Raising Of Existing Ash Dykes Of Ctps.
Basic Detail
Tender No DVC/Tender/Head Quarter/SPE/CMM//Works and Service/ 105861
Bidding Type Tender
Location
City Bokaro
State Jharkhand
Key Dates
Publish Date 03 Aug 2026
Submission Date 10 Aug 2026
Open Date 11 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3.37 Lakhs
Exemption Not Available
Document List
TS_CONDUCTOR.pdf
TS_EARTHWIRE.pdf
TS_SOIL_amp_GEO_INVEST_VOL-I.pdf
TS_SOW_for_Rail_pole_erection.pdf
TS_TL_ERECTION_VOL-III.pdf
TS_TL_HARDWARE_ACC_LINE.pdf
TS_TOWER_FDN_VOL-II.pdf
132KV_Tower_ACD_Drg.pdf
598b9295-1232-4a20-8bda-da6b88412f79.html
BOQ_328363.xls
Diversion_of_132KV_CTPS-R_1.pdf
Diversion_of_33KV_CTPS-BR_2.pdf
DVC_GCC.pdf
E-BG.pdf
Earthing_arrangement.pdf
Pre-Signed_Intergrity_Pact.pdf
Quality_Chapter_R0.pdf
SCC.pdf
Scope_of_work.pdf
Specification_for_rail_po_3.pdf
Technical_data_ail_pole_a_4.pdf
Technical_data_for_Railpo_5.pdf
Technical_data_for_Stay_wire.pdf
Tendernotice_1 (2).pdf
Tendernotice_2 (1).pdf
TS_CLR_2025.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 03, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 03, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 10, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Aug 10, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Aug 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
pdf

TS_CONDUCTOR.pdf

pdf

TS_EARTHWIRE.pdf

pdf

TS_SOIL_amp_GEO_INVEST_VOL-I.pdf

pdf

TS_SOW_for_Rail_pole_erection.pdf

pdf

TS_TL_ERECTION_VOL-III.pdf

pdf

TS_TL_HARDWARE_ACC_LINE.pdf

pdf

TS_TOWER_FDN_VOL-II.pdf

pdf

132KV_Tower_ACD_Drg.pdf

html

598b9295-1232-4a20-8bda-da6b88412f79.html

xls

BOQ_328363.xls

pdf

Diversion_of_132KV_CTPS-R_1.pdf

pdf

Diversion_of_33KV_CTPS-BR_2.pdf

pdf

DVC_GCC.pdf

pdf

E-BG.pdf

pdf

Earthing_arrangement.pdf

pdf

Pre-Signed_Intergrity_Pact.pdf

pdf

Quality_Chapter_R0.pdf

pdf

SCC.pdf

pdf

Scope_of_work.pdf

pdf

Specification_for_rail_po_3.pdf

pdf

Technical_data_ail_pole_a_4.pdf

pdf

Technical_data_for_Railpo_5.pdf

pdf

Technical_data_for_Stay_wire.pdf

pdf

Tendernotice_1 (2).pdf

pdf

Tendernotice_2 (1).pdf

pdf

TS_CLR_2025.pdf