| 1 | Re-routing, Laying OR Replacement of Damage of UG Steel PipelineThe SOR covers re-routing, Laying, replacement of steel pipe line by Transportation, loading, unloading of the line pipes to the site, coordination, Liasioning, excavating the trench in all site conditions, laying of pipeline with dewatering and cleaning of pit or trench if required, Welding, NDT, DPT, joint coating, holiday testing, backfilling, laying of warning mat, painting, R-95, hydrotesting, pigging, swabbing of pipes, N2 purging etc. which required to complete the pipeline mechanically and commissioning of pipeline as per approval by EIC. This is operation and maintenance work so the scope covers closing the valves of both sides of the work place, venting the natural gas of the section, Nitrogen purging (Saperate rate as per below SOR) checking LEL & cutting the line from both ends of existing pipeline, surface and bevel preparation, DP checking, Drying of the section if required etc. and as per requirement at site and direction given by EIC. Contractor to carry out all the activities involved in Pre- commissioning and commissioning and ensure the safety requirements such as PPEs, barricading, sign boards, blinking light etc. to complete the section work in day and night as directed by EIC. Contractor to arrange all necessary equipment, DG, pipe line fittings, consumables, manpower with PPE's, Fire extinguishers, Fire fighting services of local coordination as required etc. to complete the job. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104 in all aspect as per the satisfaction of MNGL. |
| 2 | 4'' Dia Re-routing/Laying OR Replacement UG PIPELINE |
| 3 | 6'' Dia Re-routing/Laying OR Replacement UG PIPELINE |
| 4 | 10'' Dia Re-routing/Laying OR Replacement UG PIPELINE |
| 5 | 12'' Dia Re-routing/Laying OR Replacement UG PIPELINE |
| 6 | Above Ground PipingThe SOR covers re-routing, installation, Modification, Upgradation, Replacement of steel pipe line, valve, fittings, IJ etc. by Transportation, loading, unloading at the site, coordination, Permit, providing pipe support in all site conditions, Welding, IJ installation, NDT, DPT, pre-post & haydro testing, painting, swabbing, N2 purging, supply of safety equipments-PPEs which required to ensure the safe site and working conditions as per requirement and direction by EIC. This is operation and maintenance work so the scope covers closing the valves of both sides of the work place, venting the natural gas of the section, Nitrogen purging (Saperate rate as per below SOR), checking LEL & cutting the line, surface and bevel preparation, DP checking, Drying of the section etc. as per site requirement. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104. SOR also covers the flange joint dismantling, providing support of pipeline, gasket & stud-bolts replacement as required, painting, flow direction, copper earthing jumpers, insulated, U-clamp, Neoprine sheet insulator, anchor fastener, installation, civil work etc. which required at site and satisfactory of the EIC. this SOR covers the hook up with commissioned pipeline and gas-in with approval from EIC without additional cost to MNGL. (Inch Dia = Pipe Diameter (in inches) × Number of Joints) |
| 7 | Re-routing/Laying OR Replacement,AG PIPELINE for all size Dia |
| 8 | Mobilization/Hook Up/ UG-AG Pipeline work connectivity etc.The SOR covers additional manpower, site coordination,Liasioning, tools, equipments, machines, excavation, welding, NDT, Coating, backfilling, etc. whichever is required to complete the given hook up work in totality for all size of UG Pipeline. vendor can claim only 1 hook up/Mobilization qty per site/job/location etc.The SOR covers the charges encoured with mobilization of manpower, tools, equipments, machines, site execution, transportation, coordination, safety Equipments,PPEs,water etc. against Planed, unplanned-emergency services/ job with timeline given and directed by EIC. it covers receiving & transportation, shifting of old pipes to MNGL’s designated place (Wherever applicable) etc. which required as per site requirement & directions by EIC.The SOR also covers, distribution of notice/ intimation letter to societies, police station, corporation, fire brigade etc. to execute the decommissioning and commissioning of the pipeline/ section including support for closing of both sides valves, venting the natural gas of the section, Nitrogen purging including supply, vaporizer, checking LEL etc. as per requirement at site and direction given by EIC. Contractor to carry out all the activities involved in De-commissioning and commissioning and ensure all safety requirements such as PPEs, barricading, sign boards, blinking light etc. to complete the section work in day and night as directed by EIC. |
| 9 | Mobilization/Hook Up of steel line for All Dia Size |
| 10 | Steel pipeline Road/Water Body/railway etc,CrossingThe SOR covers Complete work of the Water body, road & railway etc. crossing (between the limits are defined as approved drawings) by HDD/Boring method including “Receiving and taking over\\" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling loading, unloading, aligning etc., Site Co-cordination, Liasioning with Authority, Pre-construction survey, Manpower, equipment, other resources and acquiring the required land for storage, fabrication including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve (Direx Sleeve) and repair of pipeline coating with special repair patch materials as per specification, pre-testing etc. of complete string made for crossing access for Contractor ,execution, supply of casing pipe as per tender, etc. but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document. Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including pigging, cleaning, final hydro testing etc. along with mainline works {as mentioned in Tender documents) required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.In case crossing for MP Pipeline, will be executed as per the scope given above and in tender document with CS Pipeline. MDPE Pipeline will be connected at both end of the crossed pipeline section through 4\\"X 125 MM TF. The supply & installation of TF can be claimed separately as per given SOR in this tender. |
| 11 | Steel Pipeline Crossing(Boring/HDD) upto 6\\" |
| 12 | Steel Pipeline Crossing(Boring/HDD) 10/12\\" |
| 13 | Steel Pipeline Crossing(Boring/HDD) upto 6\\" with supply & inst. Casing |
| 14 | Steel Pipeline Crossing(Boring/HDD) 10/12\\" with supply & inst. Casing |
| 15 | MDPE PIPELINE LAYING |
| 16 | Laying OF MDPE Pipeline Dia=63-90 MM |
| 17 | Laying OF MDPE Pipeline Dia=125-180 MM |
| 18 | Replacement of steel valves (Flange End) Various sizes in piping system including blind removal providing temporary supports if necessary, nut bolt loosening / tightening/replacement as required, supply of gasket, painting and torque setting with all tools/tackles/manpower etc. of valves sizes, Hydra and other lifting equipment inclusive of scaffolding arrangement at site if required. Contractor to arrange including all necessary equipment, tools & tackles, consumables, transportation, manpower with PPE's. Dismantling of piping spool along with flanges from line for various pipe sizes and putting blind including nut bolt removing & handling with all tools / tackles / manpower/machinery etc. SOR also covers the transportetion of matril form / to MNGL stor, return, pre hydro etc. which required to complet the work. |
| 19 | INSTALL,VALVE,STEEL,<=1''NB |
| 20 | INSTALL,VALVE,STEEL,2''NB |
| 21 | INSTALL,VALVE,STEEL,4\\"NB |
| 22 | INSTALL,VALVE,STEEL 6''- 8\\"NB |
| 23 | INSTALL,VALVE,STEEL, 10\\"- 12\\"NB |
| 24 | Replacement of Steel Valves (Butt Welded) :-Valve replacement which is installed on steel pipe line network Activity shall be carried including transportation, old pipe/valve to / from MNGL store., loading, unloading of the valve to the site, excavating the trench for new valve installation, dewatering and cleaning of pit or trench, Painting, R-95,Welding the section for valve assembly, NDT, DPT, joint coating holiday testing, laying, cleaning section by pneumatic pressure, hydrotesting of valve assembly, closing the valves of both sides of the work place. if the tapping in between the section same to be close. venting the natural gas of the section, Nitrogen purging, Re-installation of purge valves (wherever required), barricading the site with sign boards, cutting the line from both ends of existing pipeline/valve section, surface and bevel preparation, DP checking and welding the pipe with the new section, NDT(Radiography, UT,) MPT coat and wrap for golden joints, Holiday testing, laying of warning mat and back-filling the same etc. Drying of the section if required & construction of valve chamber by RCC Grade M:20 (water proof Chamber) Pre-cast/Steel cover with necessary fabrication (50Ton load capacity). Contractor to carry out all the activities involved in Pre- commissioning and commissioning of the complete section work as directed by OWNER EIC. Contractor to arrange all necessary equipment, pipe line fittings, consumables, manpower with PPE's, Fire extinguishers, Fire fighting services of local corporation as required etc. to complete the job. After Completion of the job all related documents to be submitted. Job shall be carried out as per ASME B 31.8/ API 1104. Transportation, Pneumatic testing, Nitrogen Purging, Hydrotesting, Flushing, Swabbing, Drying and NDT etc. |
| 25 | INSTALL,VALVE,STEEL,<=1''NB |
| 26 | INSTALL,VALVE,STEEL,2''NB |
| 27 | INSTALL,VALVE,STEEL,4\\"NB |
| 28 | INSTALL,VALVE,STEEL,6'' & 8'' NB |
| 29 | INSTALL,VALVE,STEEL, 10'' & 12\\"NB |
| 30 | Painting of Pipeline, Structure, etc.Power Spray or by hand painting of pipelines / pipings/ fittings/piping spool / fixtures etc. including , supply of paint and application of 2 coat of high build chlorinated rubber. Poly urethane/ zinc phosphate primer of 70 micron (DFT) each and two coats of finished paint of epoxy paint of golden yellow colour 90 micron (DFT) each of approved make as per the approved vendor list attached with this tender to give an even shade after proper scraping of existing paint by power brushing or suitable method and clearing of surface free from foreign materials including stenciling of line numbers, pipe tagging, flow direction arrow, other lettering as found condition of pipeline as per instruction of OWNER EIC. Contractor to arrange including all necessary equipment, material (paint etc.), tools & tackles, consumables, transportation, manpower with PPE's.(Aboveground & Valve chamber) |
| 31 | Painting of Exposed/Above Ground Pipeline |
| 32 | Coating:The job includes the preparation of trenches, pipe & for steel valve surface preparation by mechanical cleaning through power brush, Primer application, wrapping of tape, edge preparation, holiday test etc. SOR covers supply of all consumables, utilities, equipment, manpower, cleaning and surface preparation tools, testing tool, handling, transportation etc. which required to complete the job as per instruction of EIC.the application are repair of Live line repair 3LPE coated straight pipe, Valve coating refurbishment etc. detail procider and surface preparation etc is define in tender document. |
| 33 | Cost for Supply and application of R-95 EPOXY/ CZH Visco-elastic paste-2Km |
| 34 | Supply of VISCOELASTIC COATING/COLD TAPE & APPLICATION |
| 35 | Fabrication work : PIPE SUPPORT, STRUCTURE, chequre platePipe Supports, Valve supports, Structures including C,T angle/channel & Plate upto 10-20 mm thick etc. fabrication and erection of all types of pipe supports, U clamps with sleeves of various sizes (2\\",4\\", 6\\", 10\\" and 12\\") , saddle, guide, stops, cradles, Neoprene sheet, turn buckles, anchors, T posts, stockade/trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc., including painting suitable for highly corrosive area as per specification labour and supervision & complete work as per drawing, specifications and instructions of Engineer-in-charge (bolts, nuts, washers, u-clamps etc. for supporting shall be supplied by the Contractor within the rates quoted. These items will not be measured and paid separately) The work is to be completed in all respect as per scope of work and specification. Each and every item install in existing or new network, TC's & reports shall be submit to the Owner EIC. Contractor to arrange including all necessary equipment, tools & tackles, consumables, transportation, manpower with PPE's. |
| 36 | SUPPLY, FABRICATION AND INSTALLATION |
| 37 | SUPPLY OF MANPOWER, Tools, Equipment etc.Schedule of rates for extra works for manpower, machine, equipment etc. supply as per work requirement not relevent to reguler given work, need incase of Urgency or individual work etc. as per direction by EIC.(Additional manpower if required in case of emergency and approved by OWNER EIC) 8 hours=dayContractor to arrange all necessary equipment, tools & tackles, consumables, ladder, transportation, manpower with PPE's etc. |
| 38 | SUPPLY, EXTRA, MANPOWER, RIGGER |
| 39 | SUPPLY, EXTRA,MANPOWER,WELDER |
| 40 | SUPPLY,EXTRA,MANPOWER, FITTER |
| 41 | Helper/Unskilled Labour |
| 42 | excavator with bucket/breakar |
| 43 | Diesel operated power generator with oprator, 60 KVA |
| 44 | Tractor breaker with pnumatic arrangement |
| 45 | On rent Crane up to 12T with lifting belts |
| 46 | Truck (19 ft. long) Ashok Ley (20km) |
| 47 | CONTINUOUS CONCRETE COATING (FOR CS PIPES) -Supply of all consumables, materials and application of 80mm thk for 12\\" NB & 10\\" NB Line Pipe and 50 mm thick for 6\\" NB Line Pipe, continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 (nominal mix) and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe for various sizes and -Preparation of Steel Valve chamber RCC, M20 grade with RCC Heavy duty Covers/Hinged Chequeted Plate 6mm thk, and grouted Frame etc. full scope is define in tender document. |
| 48 | CONTINUOUS CONCRETE COATING (FOR CS PIPES) 4'' Dia |
| 49 | CONTINUOUS CONCRETE COATING (FOR CS PIPES) 6'' Dia |
| 50 | CONTINUOUS CONCRETE COATING (FOR CS PIPES)10'' Dia |
| 51 | CONTINUOUS CONCRETE COATING (FOR CS PIPES)12'' Dia |
| 52 | Civil Work - Construction of Valve chamber with water proofing, DRS, MRS, Foundation,Pipline Protection, etc. as per direction of EIC |
| 53 | RCC M20/25 INCL.STEEL DAI 12 mm |
| 54 | PCC1:2:4 |
| 55 | Construction of STEEL VALVE Chambers RCC M25 & steel 12-16mm for all Size |
| 56 | Supply & Inst. of RCC heavy duty covers, 40T & above |
| 57 | Supply and installation of Steel Pipeline Pole, Route MarkerSOR covers the supply of manpower , materials, fabrication, civil work, etc. which required to installed the route markers viz,(Direction, Warning & KM Post) markers with painting as per drawing |
| 58 | Pipeline RCC boundary / route marker |
| 59 | Pipeline all Pole markers with post & foundations |
| 60 | Supply & laying of RCC tiles as per drawing if any other location needed as per request by EIC |
| 61 | Supply and Installation of Scaffolding |
| 62 | SUPPLY, INSTALL,SCAFFOLDING |
| 63 | Supply of 150/300 Class Spiral wound Gasket (Inner & Outer SS 316 with graphite filled) |
| 64 | SUPPLY,GASKET,SPIRAL,WOUND,-,<=3\\" Dia |
| 65 | SUPPLY,GASKET,SPIRAL,WOUND,-,4\\" Dia |
| 66 | SUPPLY,GASKET,SPIRAL,WOUND,-,6\\" Dia |
| 67 | SUPPLY,GASKET,SPIRAL,WOUND,#-,8\\" Dia |
| 68 | SUPPLY,GASKET,SPIRAL,WOUND,-,10\\" Dia |
| 69 | SUPPLY,GASKET,SPIRAL,WOUND,#,12\\" Dia |
| 70 | Excavation of Built up surface/Hard Rock/Asphalt Surface/concrete road for U/G steel pipeline, shutdown activity, etc. on steel networkExcavation below1.5 meter (For additional excavation) by Man or Machine Providing Shuttering to entire Pits Providing Hard Barricading to entire Pit Shifting of Soil from site. Backfilling is also to be done if required |
| 71 | EXCAVATION MUDDY SOIL,MANUAL/M/C, Backfilling (if required) |
| 72 | Supply and Installation of Steel Pipeline Fittings |
| 73 | Weld Neck RF Flange (B-16.5, # A105, Serrated finish) |
| 74 | 12\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 75 | 10\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 76 | 6\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 77 | 4\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 78 | 2\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 79 | 1\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 80 | 4\\" NB, RF End thickness to match with pipe wall thickness 300# |
| 81 | 2\\" NB, RF End thickness to match with pipe wall thickness 300# |
| 82 | Blind Flanges (B-16.5, # A105, Serrated) |
| 83 | 12\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 84 | 10\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 85 | 6\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 86 | 4\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 87 | 2\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 88 | 1\\" NB, RF End thickness to match with pipe wall thickness 150# |
| 89 | 2\\" NB, RF End thickness to match with pipe wall thickness 300# |
| 90 | Elbow (Seamless)90° Elbow (A234 Gr. WPB, B-16.9, 1.5D) |
| 91 | 12\\" NB Sch. Std. |
| 92 | 10\\" NB Sch. Std. |
| 93 | 6\\" NB Sch. Std. |
| 94 | 4\\" NB End thickness to match with pipe wall thickness |
| 95 | 2\\" NB Sch. 80 |
| 96 | 1\\" NB SW, 3000# |
| 97 | Elbow (Seamless) 45° Elbow (A234 Gr. WPB, B-16.9, 1.5D) |
| 98 | 12\\" NB Sch. Std. |
| 99 | 10\\" NB Sch. Std. |
| 100 | 6\\" NB Sch. Std. |
| 101 | 4\\" NB End thickness to match with pipe wall thickness |
| 102 | 2\\" NB Sch. 80 |
| 103 | 1\\" NB SW, 3000# |
| 104 | Elbow (Seamless) 90° Elbow (A234 Gr. WPB, B-16.9, R= 3 D) |
| 105 | 12\\" NB Sch. Std. |
| 106 | 10\\" NB Sch. Std. |
| 107 | 6\\" NB Sch. Std. |
| 108 | 4\\" NB End thickness to match with pipe wall thickness |
| 109 | 2\\" NB Sch. 80 |
| 110 | 1\\" NB SW, 3000# |
| 111 | Elbow (Seamless) 45° Elbow (A234 Gr. WPB, B-16.9, R= 3 D) |
| 112 | 12\\" NB Sch. Std. |
| 113 | 10\\" NB Sch. Std. |
| 114 | 6\\" NB Sch. Std. |
| 115 | 4\\" NB End thickness to match with pipe wall thickness |
| 116 | 2\\" NB Sch. 80 |
| 117 | 1\\" NB SW, 3000# |
| 118 | Elbow (Seamless)22½° Elbow (A234 Gr. WPB, B-16.9, R= 3 D) |
| 119 | 12\\" NB Sch. Std. |
| 120 | 10\\" NB Sch. Std. |
| 121 | 6\\" NB Sch. Std. |
| 122 | 4\\" NB End thickness to match with pipe wall thickness |
| 123 | 2\\" NB Sch. 80 |
| 124 | 1\\" NB SW, 3000# |
| 125 | Elbow (Seamless)11/½° Elbow (A234 Gr. WPB, B-16.9, R= 3 D) |
| 126 | 12\\" NB Sch. Std. |
| 127 | 10\\" NB Sch. Std. |
| 128 | 6\\" NB Sch. Std. |
| 129 | 4\\" NB End thickness to match with pipe wall thickness |
| 130 | 2\\" NB Sch. 80 |
| 131 | 1\\" NB SW, 3000# |
| 132 | Tees (Seamless)Equal Tee/Unequal Tee (A234 Gr. WPB, B16.9) |
| 133 | 12\\" NB x 12\\" NB x 12\\" NB Sch. Std.x Sch. Std. |
| 134 | 12\\" NB x 12\\" NB x 10\\" NB Sch. Std.x Sch. Std. |
| 135 | 12\\" NB x 12\\" NB x 6\\" NB Sch. Std.x Sch. Std. |
| 136 | 12\\" NB x 12\\" NB x 4\\" NB End thickness to match with pipe wall thickness x Sch.80 |
| 137 | 10\\" NB x 10\\" NB x 10\\" NB Sch. Std.x Sch. Std. |
| 138 | 10\\" NB x 10\\" NB x 6\\" NB Sch. Std.x Sch. Std. |
| 139 | 10\\" NB x 10\\" NB x 4\\" NB Sch. Std.x Sch. XS |
| 140 | 6\\" NB x 6\\" NB x 6\\" NB Sch. Std.x Sch. Std. |
| 141 | 6\\" NB x 6\\" NB x 4\\" NB Sch. Std.x Sch. XS |
| 142 | 4\\" NB x 4\\" NB x 4\\" NB End thickness to match with pipe wall thickness |
| 143 | 4\\" NB x 4\\" NB x 2\\" NB End thickness to match with pipe wall thickness x Sch.80 |
| 144 | ReducerReducer (A234 Gr. WPB, B16.9) |
| 145 | 12\\" NB x 10\\" NB End thickness to match with pipe wall thickness |
| 146 | 12\\" NB x 6\\" NB End thickness to match with pipe wall thickness |
| 147 | 10\\" NB x 6\\" NB End thickness to match with pipe wall thickness |
| 148 | 10\\" NB x 4\\" NB End thickness to match with pipe wall thickness |
| 149 | 6\\" NB x 4\\" NB End thickness to match with pipe wall thickness |
| 150 | 6\\" NB x 2\\" NB End thickness to match with pipe wall thickness |
| 151 | 4\\" NB x 2\\" NB End thickness to match with pipe wall thickness |
| 152 | Weldolet and SockoletWeldolet (A 234 Gr. WPB, BW) |
| 153 | 12\\" NB x 4\\" NB Sch. Std. |
| 154 | 12'' NB x 2'' NB Sch. Std. |
| 155 | 10\\" NB x 4\\" NB Sch. Std. |
| 156 | 10\\" NB x 2\\" NB Sch. Std. |
| 157 | 6\\" NB x 2\\" NB Sch. Std. |
| 158 | 4\\" NB x 2\\" NB Sch. Std. |
| 159 | 4\\" NB X 1\\" NB Sch. Std. |
| 160 | 4\\" NB X 3/4\\" NB Sch. Std. |
| 161 | End Cap |
| 162 | 12\\" Dia Sch. Std. |
| 163 | 10\\" Dia Sch. Std. |
| 164 | 6\\" Dia Sch. Std. |
| 165 | 4\\" Dia Sch. Std. |
| 166 | Supply and installation of Transition Fittings for 4' CS to 125 mm MDPE pipeline |
| 167 | Supply of Nitrogen Contractor to arrange manifold to connect up to 5 nos. cylinders with regulatorsIn case of liquid nitrogen with tubing/hose & vaporizer, purity certificate |
| 168 | N2 Cylinders (7 Cub. Meter) |
| 169 | Cubic Meters (Liquid Nitrogen) |
| 170 | PART B |
| 171 | Technician (Semiskilled) |
| 172 | Helper (Unskilled) Qualification- 10th & Min Experience of 4 years. |
| 173 | Maintenance Vehicle-(Steel O&M)The contractor has to provide TATA YODHA or equivalent with CNG/Diesel vehicle for 12 Hrs. per day to MNGL along with Branding & Necessary Modification (Internal & External) to perform O&M activity for round the clock. Model shall be BS VI having running KM not more than 20000 KM with necessary provision to store De-waterig Pump, Portable Generator 5.5 KVA, Tools & Tackles & Consumables etc as per EIC. Contractor has to ensure the compliance with prevailing RTO Regulations. Driver is in the scope of contractor. Average running per month is 3000 KM(GPS Tracking System) and will bereconciled in 12 month and the extra KM can be claimed as per seaprate SOR |
| 174 | MV For Extra Km |
| 175 | ConsumableAnchor Fastner,Grease, Paint, Painting, Hyd. Oil, Cotton, Nut-bolts, Petrol for Generator, Stationary items, Tools-tackles-mechine etc.,which is required to perform the daily job and not covered in reguler SOR, etc. as per the tender documents and satisfactory of EIC. |
| 176 | NOTES: 1) PLEASE ENTER SERVICE CHARGES FOR ITEM NO. 18.1 and 18.2 AND ENTER UNIT RATE FOR Remaining all items. 2) Please note that rate fixed for SOR item No. 18.4. Hence, service charge or rate on SOR item No. 18.4 is not considering for evaluation. 3) Service charge per man-month:This covers revision in statutory & DA, appointment of coordinator, mobilization of excavation labour as per site requirement , supply of tools, equipment, consumables etc. like squeezer, chuna etc. for each site, manpower management, office logistics, GPS/VTS tracking system, app handling, site coordination, communication, coordination with third party & authorities etc. which require to execute the contract, prevention of site, emergency handling and coronation etc. Service Charge inclusive of all taxes & duties except Goods & Service Tax (in Rs.) Please Enable Macros to View BoQ information |