| 1 | Dewatering of waste water from drain inlet to outlet at the time of work in pogress by 10 H.P Disel pump set cost of fuel etc. all complete as per the direction of E.I.CDewatering of waste water |
| 2 | Filling Empty Cement Bag with Sand for Coffer Dam |
| 3 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m etc with all labour .as per direction of Eic |
| 4 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Leadas per direction of EIC |
| 5 | Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. |
| 6 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge. |
| 7 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete .as per direction of Eic |
| 8 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes, Centring & Shuttering of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position. (includeing Centering & shuttering). |
| 9 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 10 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete. |
| 11 | Cement concrete (m20) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. |
| 12 | Removing the Dimantle &excavated materials from site by mechanical means up to 5km lead with loading and unloading complete as per yhe direction of EIC |
| 13 | provision of photo sighn board etc other unforseen item Please Enable Macros to View BoQ information |