| 1 | laboures for site clearance & cleaning of old drain |
| 2 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance of 50m including all lifts, levelling, ramming the foundation trenches, removing roots of the tree, shrubs all cpmplete as per approved design, building specifications and directions of E/l …..do….do….. specification and direction of E/I. Extra for earthwork in hard soil.[BCD SOR -5.1.1+5.1.2 ] |
| 3 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[BCD SOR-5.1.10] |
| 4 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[BCD SOR-5.6.3] |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:1.5:3 (1 Cement : 1.5 coarse sand :3 graded stone aggregate 20mm nominal size) [BCD SOR - 5.3.1.1] |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement – All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.3.9.1] |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.3.10] |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.311] |
| 9 | roviding Tor steel of reinforcement of 10mm,12mm &16mm dia. Bars as per approved design and drawing ......... do ........ do ...........E/I.[ BCD SOR- 5.5] |
| 10 | Centering and shuttering including strutting, propping etc an dremoval of form for foundation, footing, bases of column etc for mass construction [BCD SOR 5.3.17.1] |
| 11 | Carriage of Materials |
| 12 | Sand 1Km(K) + 5Km(P) |
| 13 | Chips 1Km(K) + 40Km(P) |
| 14 | Bricks 1Km(K) + 14Km(P) |
| 15 | Reinforcement bar 5 Km(P) |
| 16 | Cement 5Km(P) |
| 17 | Add 18% GST |
| 18 | Adding Labour Cess @ 1% |