| 1 | Drilling of borewells of size 6” to 8” dia. in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles (Conveyance of hand bore set including loading and unloading to be done by the contractor) (Page No:217.) |
| 2 | Supply and delivery of 200 mm dia PVC causing pipe 6KSC/CM2 including cost of pipe ea complete (Page No:7.) |
| 3 | Labour Charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc., complete, supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of TWAD Board 200 mm dia Casing Pipes assembly (Page No:304.) |
| 4 | Supply and delivery of Wet type Submergible including all labour charges etc., complete., Submergible Motor 75x200 7.50 H.P (Page No:101) |
| 5 | Supply of 32 mm UPVC Pipes specially made for deep borewell Submersible motor erection (ISI Make) including all cost materials, conveyance labours etc., complete as directed by departmental officers. (Page No:24) |
| 6 | Cost and supply of pvc 4Sqmm cable 4 core including cost and conveyance of materials etc., complete (Page No:122) |
| 7 | Cost and supply of Nylon rope including cost and conveyance of materials etc., complete |
| 8 | Cost and supply of 80mm GI pipe inculding cost and conveyance of materials etc., complete (Page No:40) |
| 9 | Supply and fixing of GI PipeSpecials. (Page No:44) |
| 10 | 80mm GI Coupling |
| 11 | 80mm GI Union |
| 12 | 80mm GI Gatevalve |
| 13 | 80mm GI Elbow |
| 14 | 80mm GI Tee |
| 15 | 80mm Clamp Set |
| 16 | Cost and supply of 200 mm Pvc end cap including cost and conveyance of materials cost etc., complete |
| 17 | Labour charges for Errection of submergible Pump set in bore well including fixing and jointing submergible cable with proper clamps up to the starter to required depth and also fixing of riser pipes to the required depth values Errection clamps pressure gauges up to the exterior wall of pump room and errction of panel board consisting of TPICN switches starter volmeter ammeter three pilot indicator lamps complete and testing the pump set and trail run for 10 days up to 10.00 HP. (Page No:310) |
| 18 | Supply and delivery of RCC Ring well 1.2M m dia using RCC M 30mm using 20mm &10mm HBG stone excluding cost of reiforcement but including cost of curing etc complete and as directed by TWAD Board Officers. |
| 19 | Supply and delivery of RCC Ring well 0.9M m dia using RCC M 30mm using 20mm &10mm HBG stone excluding cost of reiforcement but including cost of curing etc complete and as directed by TWAD Board Officers. |
| 20 | Supply and delivery of RCC Ring well 0.6M m dia using RCC M 30mm using 20mm &10mm HBG stone excluding cost of reiforcement but including cost of curing etc complete and as directed by TWAD Board Officers. |
| 21 | Cement concrte 1:2:4 mix ( one cement, two sand and four aggregate ) including the cost and conveyance of all materials and excluding the cost of steel and including the labour charges for mixing, laying of concrete and curing etc complete as per the standard specifications. |
| 22 | GST. 18% (CGST-9%, SGST-9%) Please Enable Macros to View BoQ information |