Environment and Forests Government Departments Closing in 8 days TDR #56106610

Tender For Maintenance Of Perau To Thongumalai Forest Road(Km 0/000 - Km 10/850) At Amirthi Range, Vellore Division.

Issued by Government Departments · Tiruvannamalai, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Jul 2026
8 days left
EMD
5.10 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tiruvannamalai → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Maintenance Of Perau To Thongumalai Forest Road(Km 0/000 - Km 10/850) At Amirthi Range, Vellore Division.

BOQ

Name of Work:- Maintenance of Perau to Thongumalai Forest Road(Km 0/000 - Km 10/850) at Amirthi Range, Vellore Division.
Sl. No. Item Description
1Cearing light jungle in all labour charges for etc., complete and directed by department engineers
2Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete,
3Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper tosite, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
4Providing and laying Prime Coat over WBM / WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
5Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
6Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH (Rev-5BM (Grade-II) 50mm Thick Using VG30)
7Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5
8Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.
9Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision),including painting and numbering etc., and all other incidental charges etc., complete.
10Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete.
11Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineerin-charge. High intensity Retro Reflectro sheet shallconsist of minimum coefficient of Retro-reflection asper Table 6.6 of IRC 67-2012. The retro- reflectivesheeting shall be covered under 7 year warrantyissued for field performance and a certified copyof three years outdoor exposure report shall beobtained as per IRC 67:2012. (as per MoRT&HSpecification No.801)
12Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 radecement concrete 45cmX45cmX60cm size
13Sub Estimate (I) for the Strenthening of Hard bed Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for hard bed
14Sub Estimate (II- a) for Strenthing Concreate Road Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for CC PAVEMENT
15Sub Estimate (II- b) for Strenthing Concreate Road Vibrated Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for CC PAVEMENT
16Sub Estimate (II-c) for Strenthing Concreate Road Providing and fixing of Bitumen pad 20mm thick in between deck slabs and pier as shown in the drawings including cost and conveyance and expansion joints including shalimar pad and joint sealant etc., complete.
17Sub Estimate (III-a) for Construction of Retaining Wall Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for .foundation of retaining Wall
18Sub Estimate (III-b) for Construction of Retaining Wall Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall of retaining wall.
19Sub Estimate (III-c) for Construction of Retaining Wall Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Substructure of Retaining wall Below sill.
20Sub Estimate (III-d) for Construction of Retaining Wall Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Substructure of Foundation of Retaining walls Above sill.
21Sub Estimate (III-e) for Construction of Retaining Wall Providing and fixing PVC seepage pipes of 100mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete
22Sub Estimate (III-f) for Construction of Retaining Wall Re Filling using excavated earthlaying, handling charges and filling in layers,tamping under optimum moisture content to get the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc., complete for Retaining wall (Filling charges only)
23Sub Estimate (IV-a) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road . Dismantling the Plain Cement Concrete removing and disposing of the resulting materials and back filling the trenches and pits for dismantling the existing damaged culvert including all tools and plants and all labour charges etc., complete.
24Sub Estimate (IV-b) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Culvert.
25Sub Estimate (IV-c) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.
26Sub Estimate (IV-d) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert
27Sub Estimate (IV-e) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Culvert
28Sub Estimate (IV-f) for Reconstruction of box Culvert at km 2/646 in Of Peraru To Thongumalai Road Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.
29Sub Estimate (V-a) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of Body wall and pipes.
30Sub Estimate (V-b) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall.
31Sub Estimate (V-c) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as perstandard specification for Body wall.
32Sub Estimate (V-d) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification.
33Sub Estimate (V-e) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification.
34Sub Estimate (V-f ) Construction of pipe culvert at km 7/945 of Peraru Thongumalai Road Stone dust filling including cost and conveyance of Stone dust to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.
35Sub Estimate (VI- a) for construction of Pipe Culvert Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of Body wall and pipes.
36Sub Estimate (VI- b) for construction of Pipe Culvert Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall.
37Sub Estimate (VI- c) for construction of Pipe Culvert Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Body wall.
38Sub Estimate (VI- d) for construction of Pipe Culvert Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification.
39Sub Estimate (VI- e) for construction of Pipe Culvert Laying and fixing of 1000 mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes
40Sub Estimate (VI- f) for construction of Pipe Culvert Stone dust filling including cost and conveyance of Stone dust to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.
41Sub Estimate (VII- a) Repairs to parapet wall Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56106610
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 21-07-2026
Authority
Authority Name Forest Department
Work Description Tender for Maintenance Of Perau To Thongumalai Forest Road(Km 0/000 - Km 10/850) At Amirthi Range, Vellore Division.
Basic Detail
Tender No Ref.No. 5748/2024 / D1
Bidding Type Tender
Location
City Tiruvannamalai
State Tamil Nadu
Key Dates
Publish Date 22 Jun 2026
Submission Date 21 Jul 2026
Open Date 22 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5.10 Lakhs
Exemption Not Available
Document List
0af7fe31-46ae-412e-add5-3cf8dbf58791.html
BOQ_820025.xls
Tenderdoc.pdf
Tendernotice.pdf
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Jul 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

0af7fe31-46ae-412e-add5-3cf8dbf58791.html

xls

BOQ_820025.xls

pdf

Tenderdoc.pdf

pdf

Tendernotice.pdf

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders